Letting of 6/27/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 450-11-0048
Parish: ASCENSION
Routes: I-10
Description: I-10 @ LA 30/LA 44 (GONZALES) INTERCHANGE LIGHTING
Type Const: roadway lighting and related work
Estimated Construction Cost: $761,678.28
 
RankLicenseBidderConstruction Bid
1 08470 DIAMOND ELECTRICAL CO., INC. $819,476.50
2 13082 WYE ELECTRIC, INC. $923,285.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND ELECTRICAL CO., INC.
- 2 -
WYE ELECTRIC, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 12,200.00 12,200.00 10,000.00 10,000.00        
713-01 temporary signs & barricades lump      LUMP 6,000.00 6,000.00 10,000.00 10,000.00        
727-01 mobilization lump      LUMP 44,150.00 44,150.00 10,000.00 10,000.00        
730-01 trenching and backfilling 9,660      LNFT 2.50 24,150.00 3.00 28,980.00        
730-02-A conduit with conductors (2" galvanized rigid steel;
3#2)
100      LNFT 22.90 2,290.00 40.00 4,000.00        
730-02-B conduit with conductors (2" schedule 40 pvc; 3#2) 100      LNFT 8.00 800.00 12.00 1,200.00        
730-02-C conduit with conductors (2" schedule 40 pvc; 3#2) 5,880      LNFT 8.20 48,216.00 12.00 70,560.00        
730-02-D conduit with conductors (2-1/2" schedule 40 pvc; 2#2,
2#4, 1#2 bare)
230      LNFT 11.25 2,587.50 15.00 3,450.00        
730-02-E conduit with conductors (1-1/2" schedule 40 pvc; 3#4) 1,760      LNFT 6.30 11,088.00 10.00 17,600.00        
730-02-F conduit with conductors (2" schedule 40 pvc; 2#2, 2#6,
1#2 bare)
1,250      LNFT 10.30 12,875.00 14.00 17,500.00        
730-02-G conduit with conductors (1-1/4" rigid aluminum conduit;
3#8)
520      LNFT 16.60 8,632.00 35.00 18,200.00        
730-02-H conduit with conductors (1-1/4" liquid tight flexible
aluminum; 3#8)
40      LNFT 15.30 612.00 20.00 800.00        
730-02-I conduit with conductors (1" galvanized rigid steel;
3#8)
40      LNFT 45.00 1,800.00 10.00 400.00        
730-02-J conduit with conductors (1" rigid aluminum conduit;
3#10)
520      LNFT 13.40 6,968.00 10.00 5,200.00        
730-02-K conduit with conductors (1" liquid tight flexible
aluminum; 3#10)
40      LNFT 10.85 434.00 10.00 400.00        
730-02-L conduit with conductors (3/4" galvanized rigid steel;
3#10)
40      LNFT 41.85 1,674.00 10.00 400.00        
730-02-M conduit with conductors (1-1/4" schedule 40 pvc; 3#6) 1,200      LNFT 4.00 4,800.00 7.00 8,400.00        
730-04 jacked or bored casing (6" schedule 80 pvc conduit) 860      LNFT 41.85 35,991.00 40.00 34,400.00        
730-06-A high mast pole (130 ft, steel, 8 luminaire ring,
lowering device)
8      EACH 52,250.00 418,000.00 55,000.00 440,000.00        
730-07-A luminaire (1000 w, hps, type ii, med., lg. & narr,
non-cutoff dist., double fusing, grey, with lamp)
64      EACH 895.00 57,280.00 1,100.00 70,400.00        
730-07-B luminaire (100 watt, hps, underpass, wall mount,
protected starter, double fusing, grey, w/lamp)
16      EACH 550.00 8,800.00 600.00 9,600.00        
730-08 electrical service point (pedestal) 2      EACH 9,000.00 18,000.00 12,000.00 24,000.00        
730-12-A removal and storage of light poles (40 foot, ground
mount, one (1) 15 foot truss arm, steel)
53      EACH 105.00 5,565.00 400.00 21,200.00        
730-12-B removal and storage of light poles (30 foot, ground
mount, one (1) 6 foot truss arm, steel)
2      EACH 105.00 210.00 400.00 800.00        
730-14 removal and disposal of luminaires (low mast, 250 watt,
480v, h.p.s.)
55      EACH 72.00 3,960.00 85.00 4,675.00        
730-16-A underground junction box (11" x 18") 40      EACH 660.00 26,400.00 800.00 32,000.00        
730-16-B underground junction box (13" x 24") 20      EACH 785.00 15,700.00 900.00 18,000.00        
730-17-A structure junction box (8"x8"x4") 44      EACH 440.00 19,360.00 700.00 30,800.00        
740-01 construction layout lump      LUMP 1,300.00 1,300.00 5,000.00 5,000.00        
744-01 traffic control management lump      LUMP 7,100.00 7,100.00 10,000.00 10,000.00        
S-001 circuit breaker disconnect (underpass) 4      EACH 1,500.00 6,000.00 600.00 2,400.00        
S-002 underground duct marker (concrete) 12      EACH 150.00 1,800.00 200.00 2,400.00        
S-003 marker tape (underground) 10,520      LNFT 0.45 4,734.00 1.00 10,520.00        
                       
 CONTRACTOR TOTAL       819,476.50   923,285.00        