Letting of 6/27/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 318-04-0008
Parish: LINCOLN
Routes: LA 820
Description: LA 145 TO LA 821
Type Const: grading, drainage structures, class ii base course, lime treatment, superpave asphaltic
concrete pavement, fencing and related work.
Estimated Construction Cost: $5,013,290.20
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $5,449,077.20
2 05789 D & J CONSTRUCTION CO., INC. $5,830,335.90
3 02268 SOIL STABILIZERS, INC. $6,887,681.55
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
D & J CONSTRUCTION CO., INC.
- 3 -
SOIL STABILIZERS, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 500,000.00 500,000.00 121,000.00 121,000.00 250,000.00 250,000.00    
202-01 removal of structures & obstructions lump      LUMP 100,000.00 100,000.00 42,000.00 42,000.00 100,000.00 100,000.00    
202-02-D removal of concrete walks & drives 1,800      SQYD 10.00 18,000.00 10.00 18,000.00 10.00 18,000.00    
202-02-F removal of concrete combination curb & gutter 158.0    LNFT 13.00 2,054.00 20.00 3,160.00 50.00 7,900.00    
202-02-I removal of concrete water well & pump house (sta.
67+70 lt.)
1.0    EACH 425.00 425.00 1.00 1.00 2,500.00 2,500.00    
202-02-J removal of 4'x8' sign ("oneal gas) @ sta. 11+21 rt. 1.0    EACH 425.00 425.00 1.00 1.00 250.00 250.00    
202-02-K removal of metal light pole @ sta. 11+21 rt. 1.0    EACH 425.00 425.00 1.00 1.00 600.00 600.00    
202-02-L removal of partially erected metal sign @ sta.
11+30 rt.
1.0    EACH 425.00 425.00 1.00 1.00 200.00 200.00    
202-02-M removal of metal tank @ sta. 11+51 rt. 1.0    EACH 425.00 425.00 1.00 1.00 1,000.00 1,000.00    
202-02-N removal of metal light pole @ sta. 12+00 rt. 1.0    EACH 425.00 425.00 1.00 1.00 300.00 300.00    
202-02-O removal of 32' brick barrier wall @ sta. 15+70 lt. 1.0    EACH 425.00 425.00 1.00 1.00 2,000.00 2,000.00    
202-02-P removal of 15' metal gate & posts @ sta. 15+70 lt. 1.0    EACH 425.00 425.00 1.00 1.00 1,000.00 1,000.00    
202-02-Q removal of 2'x3' metal sign ("fresh eggs for sale") @
sta 38+15 lt.
1.0    EACH 425.00 425.00 1.00 1.00 100.00 100.00    
202-02-R removal of 40' wood cattle chute @ sta 36+00 rt. 1.0    EACH 425.00 425.00 1.00 1.00 700.00 700.00    
202-02-S removal of 20' metal gates @ sta 36+30 & 36+70 rt. 1.0    EACH 425.00 425.00 1.00 1.00 200.00 200.00    
202-02-T removal of pvc fence @ sta 42+86 lt. 1.0    EACH 425.00 425.00 1.00 1.00 600.00 600.00    
202-02-U removal of 4' pvc & rail fence and brick columns @ sta
44+20 lt.
1.0    EACH 425.00 425.00 1.00 1.00 2,000.00 2,000.00    
202-02-V removal of pvc rail & chain link fence @ sta 48+40 lt. 1.0    EACH 425.00 425.00 1.00 1.00 2,000.00 2,000.00    
202-02-W removal of sewer septic system lines @ sta 66+40 lt. 1.0    EACH 425.00 425.00 1.00 1.00 2,500.00 2,500.00    
202-02-X removal of two 3' metal wagon wheels @ sta 72+60 rt. 1.0    EACH 425.00 425.00 1.00 1.00 300.00 300.00    
202-02-Y removal of 4'x4' wood sign ("t bar t farms) @ sta
92+10 lt.
1.0    EACH 425.00 425.00 1.00 1.00 300.00 300.00    
202-02-Z removal of wood fence & sign @ sta 101+50 rt. 1.0    EACH 425.00 425.00 1.00 1.00 600.00 600.00    
202-02-Z-01 removal of 20' metal fence w/side bracing @ sta.
108+95
1.0    EACH 425.00 425.00 1.00 1.00 700.00 700.00    
202-02-Z-02 removal of 30' metal gates @ sta. 128+40 & 147+10 lt.
and sta. 146+05 rt.
3.0    EACH 250.00 750.00 1.00 3.00 700.00 2,100.00    
202-02-Z-03 removal of brick columns @ sta. 150+39, 150+65, 151+39,
and 151+61 lt.
4.0    EACH 100.00 400.00 1.00 4.00 2,000.00 8,000.00    
202-02-Z-04 removal of metal gate @ sta 149+98 rt. 4.0    EACH 175.00 700.00 1.00 4.00 700.00 2,800.00    
203-01 general excavation 113,504      CUYD 5.50 624,272.00 6.50 737,776.00 6.00 681,024.00    
203-03 embankment 73,030      CUYD 5.00 365,150.00 7.00 511,210.00 9.50 693,785.00    
204-02 temporary hay or straw bales 183      EACH 22.00 4,026.00 15.00 2,745.00 65.00 11,895.00    
204-05-A temporary sediment check dams (hay) 220      EACH 162.00 35,640.00 175.00 38,500.00 150.00 33,000.00    
204-05-B temporary sediment check dams (stone) 22      EACH 650.00 14,300.00 700.00 15,400.00 500.00 11,000.00    
204-06 temporary silt fencing 11,160      LNFT 3.50 39,060.00 2.20 24,552.00 5.00 55,800.00    
302-02-A class ii base course (4" thick) 58,212.0    SQYD 10.00 582,120.00 11.00 640,332.00 15.50 902,286.00    
302-02-C class ii base course (8" thick) 58,212.0    SQYD 10.25 596,673.00 12.00 698,544.00 10.00 582,120.00    
302-02-D class ii base course (8 1/2" thick) 1,381.0    SQYD 13.25 18,298.25 15.00 20,715.00 30.00 41,430.00    
304-01 lime 650.00   TON 10.00 6,500.00 100.00 65,000.00 150.00 97,500.00    
304-04-D lime treatment (type d) (12" thick) 17,000      SQYD 3.61 61,370.00 3.00 51,000.00 3.00 51,000.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
3,166      CUYD 50.00 158,300.00 35.00 110,810.00 65.00 205,790.00    
402-01 traffic maintenance aggregate (vehicular measurement) 6,000.0    CUYD 40.00 240,000.00 5.00 30,000.00 50.00 300,000.00    
502-01 superpave asphaltic concrete 11,781.3    TON 75.00 883,597.50 92.00 1,083,879.60 86.00 1,013,191.80    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
606.0    TON 150.00 90,900.00 130.00 78,780.00 165.00 99,990.00    
701-01-I cross drain pipe (24" rcp/rpvcp) 480      LNFT 105.00 50,400.00 130.00 62,400.00 90.00 43,200.00    
701-01-K cross drain pipe (30" rcp/rpvcp) 210      LNFT 135.00 28,350.00 160.00 33,600.00 200.00 42,000.00    
701-01-M cross drain pipe (36" rcp/rpvcp) 134      LNFT 155.00 20,770.00 180.00 24,120.00 220.00 29,480.00    
701-01-N cross drain pipe (42" rcp/rpvcp) 245      LNFT 200.00 49,000.00 220.00 53,900.00 240.00 58,800.00    
701-01-O cross drain pipe (48" rcp/rpvcp) 472      LNFT 210.00 99,120.00 240.00 113,280.00 280.00 132,160.00    
701-03-G storm drain pipe (18" rcp/rpvcp) 130      LNFT 66.00 8,580.00 100.00 13,000.00 70.00 9,100.00    
701-05-G side drain pipe (18" rcp/rpvcp) 1,350      LNFT 50.00 67,500.00 40.00 54,000.00 48.00 64,800.00    
701-05-I side drain pipe (24" rcp/rpvcp) 38      LNFT 70.00 2,660.00 65.00 2,470.00 75.00 2,850.00    
701-05-K side drain pipe (30" rcp/rpvcp) 64      LNFT 90.00 5,760.00 75.00 4,800.00 90.00 5,760.00    
701-10-I reinforced concrete pipe (extension)(24") 50      LNFT 110.00 5,500.00 175.00 8,750.00 120.00 6,000.00    
702-03-A catch basins (cb-01) 1      EACH 2,400.00 2,400.00 3,500.00 3,500.00 4,000.00 4,000.00    
702-08-B side drain safety end (type 2) 2      EACH 3,800.00 7,600.00 2,500.00 5,000.00 3,000.00 6,000.00    
705-01 barbed wire fence 11,806      LNFT 6.00 70,836.00 5.00 59,030.00 7.50 88,545.00    
705-02 combination mesh & barbed wire fence 318      LNFT 6.00 1,908.00 5.00 1,590.00 8.50 2,703.00    
705-04 single swinging driveway gates 2      EACH 550.00 1,100.00 550.00 1,100.00 600.00 1,200.00    
705-05 double swinging driveway gates 5      DBGT 660.00 3,300.00 800.00 4,000.00 1,200.00 6,000.00    
706-02-C concrete drive (6" thick) 742.9    SQYD 60.00 44,574.00 52.00 38,630.80 65.00 48,288.50    
707-03 combination concrete curb & gutter 321.0    LNFT 28.00 8,988.00 25.00 8,025.00 40.00 12,840.00    
708-01 right-of-way monument 145      EACH 105.00 15,225.00 125.00 18,125.00 300.00 43,500.00    
708-02 right-of-way monument witness post 145      EACH 105.00 15,225.00 100.00 14,500.00 300.00 43,500.00    
711-01-C riprap (30 lb, 14" thick) 88      SQYD 110.00 9,680.00 125.00 11,000.00 80.00 7,040.00    
711-04 geotextile fabric 88      SQYD 3.50 308.00 4.00 352.00 5.50 484.00    
712-01-A concrete cast-in-place revetment (4" thick) 175      SQYD 66.00 11,550.00 80.00 14,000.00 65.00 11,375.00    
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 175,000.00 175,000.00 200,000.00 200,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
3.150  MILE 165.00 519.75 400.00 1,260.00 450.00 1,417.50    
713-04-A temporary pavement markings (solid line)(4" width) 6.500  MILE 700.00 4,550.00 400.00 2,600.00 400.00 2,600.00    
716-01-A mulch (vegetative) 53.5    TON 650.00 34,775.00 425.00 22,737.50 600.00 32,100.00    
717-01 seeding 1,630      LB 7.50 12,225.00 6.00 9,780.00 10.00 16,300.00    
718-01 fertilizer 23,000      LB 0.50 11,500.00 0.60 13,800.00 0.75 17,250.00    
720-01-A erosion control system, slope protection (type a) 13,532      SQYD 1.50 20,298.00 1.75 23,681.00 2.50 33,830.00    
720-01-E erosion control system, flexible channel liner (type e) 6,859      SQYD 3.30 22,634.70 4.00 27,436.00 3.25 22,291.75    
722-02 project site laboratory (equipped) 1      EACH 20,000.00 20,000.00 35,000.00 35,000.00 20,000.00 20,000.00    
726-01 bedding material 500.0    CUYD 92.00 46,000.00 85.00 42,500.00 80.00 40,000.00    
727-01 mobilization lump      LUMP 300,000.00 300,000.00 425,000.00 425,000.00 400,000.00 400,000.00    
731-02 reflectorized raised pavement markers 850      EACH 6.00 5,100.00 7.00 5,950.00 7.00 5,950.00    
732-01-C plastic pavement striping (8" width) 650      LNFT 1.00 650.00 5.00 3,250.00 4.00 2,600.00    
732-01-E plastic pavement striping (24" width) 1,100      LNFT 3.30 3,630.00 7.50 8,250.00 7.00 7,700.00    
732-02-A plastic pavement striping (solid line) (4" width) 6.600  MILE 2,500.00 16,500.00 2,300.00 15,180.00 2,200.00 14,520.00    
732-03-A plastic pavement striping (broken line)(4" width) 3.300  MILE 900.00 2,970.00 1,100.00 3,630.00 1,000.00 3,300.00    
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 165.00 330.00 650.00 1,300.00 300.00 600.00    
732-04-C plastic pavement legends & symbols (only) 2      EACH 165.00 330.00 650.00 1,300.00 300.00 600.00    
735-01 mailboxes 35      EACH 22.00 770.00 10.00 350.00 1.00 35.00    
735-02 mailbox supports (single) 35      EACH 165.00 5,775.00 135.00 4,725.00 300.00 10,500.00    
740-01 construction layout lump      LUMP 40,000.00 40,000.00 165,000.00 165,000.00 200,000.00 200,000.00    
                       
 CONTRACTOR TOTAL       5,449,077.20   5,830,335.90   6,887,681.55    