| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - D & J CONSTRUCTION CO., INC. |
- 3 - SOIL STABILIZERS, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
500,000.00 |
500,000.00 |
121,000.00 |
121,000.00 |
250,000.00 |
250,000.00 |
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
100,000.00 |
100,000.00 |
42,000.00 |
42,000.00 |
100,000.00 |
100,000.00 |
|
|
| 202-02-D |
removal of concrete walks & drives
|
1,800   |
SQYD |
10.00 |
18,000.00 |
10.00 |
18,000.00 |
10.00 |
18,000.00 |
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
158.0 |
LNFT |
13.00 |
2,054.00 |
20.00 |
3,160.00 |
50.00 |
7,900.00 |
|
|
| 202-02-I |
removal of concrete water well & pump house (sta.
67+70 lt.) |
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
2,500.00 |
2,500.00 |
|
|
| 202-02-J |
removal of 4'x8' sign ("oneal gas) @ sta. 11+21 rt.
|
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
250.00 |
250.00 |
|
|
| 202-02-K |
removal of metal light pole @ sta. 11+21 rt.
|
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
600.00 |
600.00 |
|
|
| 202-02-L |
removal of partially erected metal sign @ sta.
11+30 rt. |
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
200.00 |
200.00 |
|
|
| 202-02-M |
removal of metal tank @ sta. 11+51 rt.
|
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-N |
removal of metal light pole @ sta. 12+00 rt.
|
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
300.00 |
300.00 |
|
|
| 202-02-O |
removal of 32' brick barrier wall @ sta. 15+70 lt.
|
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
2,000.00 |
2,000.00 |
|
|
| 202-02-P |
removal of 15' metal gate & posts @ sta. 15+70 lt.
|
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
1,000.00 |
1,000.00 |
|
|
| 202-02-Q |
removal of 2'x3' metal sign ("fresh eggs for sale") @
sta 38+15 lt. |
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
100.00 |
100.00 |
|
|
| 202-02-R |
removal of 40' wood cattle chute @ sta 36+00 rt.
|
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
700.00 |
700.00 |
|
|
| 202-02-S |
removal of 20' metal gates @ sta 36+30 & 36+70 rt.
|
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
200.00 |
200.00 |
|
|
| 202-02-T |
removal of pvc fence @ sta 42+86 lt.
|
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
600.00 |
600.00 |
|
|
| 202-02-U |
removal of 4' pvc & rail fence and brick columns @ sta
44+20 lt. |
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
2,000.00 |
2,000.00 |
|
|
| 202-02-V |
removal of pvc rail & chain link fence @ sta 48+40 lt.
|
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
2,000.00 |
2,000.00 |
|
|
| 202-02-W |
removal of sewer septic system lines @ sta 66+40 lt.
|
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
2,500.00 |
2,500.00 |
|
|
| 202-02-X |
removal of two 3' metal wagon wheels @ sta 72+60 rt.
|
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
300.00 |
300.00 |
|
|
| 202-02-Y |
removal of 4'x4' wood sign ("t bar t farms) @ sta
92+10 lt. |
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
300.00 |
300.00 |
|
|
| 202-02-Z |
removal of wood fence & sign @ sta 101+50 rt.
|
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
600.00 |
600.00 |
|
|
| 202-02-Z-01 |
removal of 20' metal fence w/side bracing @ sta.
108+95 |
1.0 |
EACH |
425.00 |
425.00 |
1.00 |
1.00 |
700.00 |
700.00 |
|
|
| 202-02-Z-02 |
removal of 30' metal gates @ sta. 128+40 & 147+10 lt.
and sta. 146+05 rt. |
3.0 |
EACH |
250.00 |
750.00 |
1.00 |
3.00 |
700.00 |
2,100.00 |
|
|
| 202-02-Z-03 |
removal of brick columns @ sta. 150+39, 150+65, 151+39,
and 151+61 lt. |
4.0 |
EACH |
100.00 |
400.00 |
1.00 |
4.00 |
2,000.00 |
8,000.00 |
|
|
| 202-02-Z-04 |
removal of metal gate @ sta 149+98 rt.
|
4.0 |
EACH |
175.00 |
700.00 |
1.00 |
4.00 |
700.00 |
2,800.00 |
|
|
| 203-01 |
general excavation
|
113,504   |
CUYD |
5.50 |
624,272.00 |
6.50 |
737,776.00 |
6.00 |
681,024.00 |
|
|
| 203-03 |
embankment
|
73,030   |
CUYD |
5.00 |
365,150.00 |
7.00 |
511,210.00 |
9.50 |
693,785.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
183   |
EACH |
22.00 |
4,026.00 |
15.00 |
2,745.00 |
65.00 |
11,895.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
220   |
EACH |
162.00 |
35,640.00 |
175.00 |
38,500.00 |
150.00 |
33,000.00 |
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
22   |
EACH |
650.00 |
14,300.00 |
700.00 |
15,400.00 |
500.00 |
11,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
11,160   |
LNFT |
3.50 |
39,060.00 |
2.20 |
24,552.00 |
5.00 |
55,800.00 |
|
|
| 302-02-A |
class ii base course (4" thick)
|
58,212.0 |
SQYD |
10.00 |
582,120.00 |
11.00 |
640,332.00 |
15.50 |
902,286.00 |
|
|
| 302-02-C |
class ii base course (8" thick)
|
58,212.0 |
SQYD |
10.25 |
596,673.00 |
12.00 |
698,544.00 |
10.00 |
582,120.00 |
|
|
| 302-02-D |
class ii base course (8 1/2" thick)
|
1,381.0 |
SQYD |
13.25 |
18,298.25 |
15.00 |
20,715.00 |
30.00 |
41,430.00 |
|
|
| 304-01 |
lime
|
650.00 |
TON |
10.00 |
6,500.00 |
100.00 |
65,000.00 |
150.00 |
97,500.00 |
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
17,000   |
SQYD |
3.61 |
61,370.00 |
3.00 |
51,000.00 |
3.00 |
51,000.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3,166   |
CUYD |
50.00 |
158,300.00 |
35.00 |
110,810.00 |
65.00 |
205,790.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
6,000.0 |
CUYD |
40.00 |
240,000.00 |
5.00 |
30,000.00 |
50.00 |
300,000.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
11,781.3 |
TON |
75.00 |
883,597.50 |
92.00 |
1,083,879.60 |
86.00 |
1,013,191.80 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
606.0 |
TON |
150.00 |
90,900.00 |
130.00 |
78,780.00 |
165.00 |
99,990.00 |
|
|
| 701-01-I |
cross drain pipe (24" rcp/rpvcp)
|
480   |
LNFT |
105.00 |
50,400.00 |
130.00 |
62,400.00 |
90.00 |
43,200.00 |
|
|
| 701-01-K |
cross drain pipe (30" rcp/rpvcp)
|
210   |
LNFT |
135.00 |
28,350.00 |
160.00 |
33,600.00 |
200.00 |
42,000.00 |
|
|
| 701-01-M |
cross drain pipe (36" rcp/rpvcp)
|
134   |
LNFT |
155.00 |
20,770.00 |
180.00 |
24,120.00 |
220.00 |
29,480.00 |
|
|
| 701-01-N |
cross drain pipe (42" rcp/rpvcp)
|
245   |
LNFT |
200.00 |
49,000.00 |
220.00 |
53,900.00 |
240.00 |
58,800.00 |
|
|
| 701-01-O |
cross drain pipe (48" rcp/rpvcp)
|
472   |
LNFT |
210.00 |
99,120.00 |
240.00 |
113,280.00 |
280.00 |
132,160.00 |
|
|
| 701-03-G |
storm drain pipe (18" rcp/rpvcp)
|
130   |
LNFT |
66.00 |
8,580.00 |
100.00 |
13,000.00 |
70.00 |
9,100.00 |
|
|
| 701-05-G |
side drain pipe (18" rcp/rpvcp)
|
1,350   |
LNFT |
50.00 |
67,500.00 |
40.00 |
54,000.00 |
48.00 |
64,800.00 |
|
|
| 701-05-I |
side drain pipe (24" rcp/rpvcp)
|
38   |
LNFT |
70.00 |
2,660.00 |
65.00 |
2,470.00 |
75.00 |
2,850.00 |
|
|
| 701-05-K |
side drain pipe (30" rcp/rpvcp)
|
64   |
LNFT |
90.00 |
5,760.00 |
75.00 |
4,800.00 |
90.00 |
5,760.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
50   |
LNFT |
110.00 |
5,500.00 |
175.00 |
8,750.00 |
120.00 |
6,000.00 |
|
|
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
2,400.00 |
2,400.00 |
3,500.00 |
3,500.00 |
4,000.00 |
4,000.00 |
|
|
| 702-08-B |
side drain safety end (type 2)
|
2   |
EACH |
3,800.00 |
7,600.00 |
2,500.00 |
5,000.00 |
3,000.00 |
6,000.00 |
|
|
| 705-01 |
barbed wire fence
|
11,806   |
LNFT |
6.00 |
70,836.00 |
5.00 |
59,030.00 |
7.50 |
88,545.00 |
|
|
| 705-02 |
combination mesh & barbed wire fence
|
318   |
LNFT |
6.00 |
1,908.00 |
5.00 |
1,590.00 |
8.50 |
2,703.00 |
|
|
| 705-04 |
single swinging driveway gates
|
2   |
EACH |
550.00 |
1,100.00 |
550.00 |
1,100.00 |
600.00 |
1,200.00 |
|
|
| 705-05 |
double swinging driveway gates
|
5   |
DBGT |
660.00 |
3,300.00 |
800.00 |
4,000.00 |
1,200.00 |
6,000.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
742.9 |
SQYD |
60.00 |
44,574.00 |
52.00 |
38,630.80 |
65.00 |
48,288.50 |
|
|
| 707-03 |
combination concrete curb & gutter
|
321.0 |
LNFT |
28.00 |
8,988.00 |
25.00 |
8,025.00 |
40.00 |
12,840.00 |
|
|
| 708-01 |
right-of-way monument
|
145   |
EACH |
105.00 |
15,225.00 |
125.00 |
18,125.00 |
300.00 |
43,500.00 |
|
|
| 708-02 |
right-of-way monument witness post
|
145   |
EACH |
105.00 |
15,225.00 |
100.00 |
14,500.00 |
300.00 |
43,500.00 |
|
|
| 711-01-C |
riprap (30 lb, 14" thick)
|
88   |
SQYD |
110.00 |
9,680.00 |
125.00 |
11,000.00 |
80.00 |
7,040.00 |
|
|
| 711-04 |
geotextile fabric
|
88   |
SQYD |
3.50 |
308.00 |
4.00 |
352.00 |
5.50 |
484.00 |
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
175   |
SQYD |
66.00 |
11,550.00 |
80.00 |
14,000.00 |
65.00 |
11,375.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
175,000.00 |
175,000.00 |
200,000.00 |
200,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.150 |
MILE |
165.00 |
519.75 |
400.00 |
1,260.00 |
450.00 |
1,417.50 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
6.500 |
MILE |
700.00 |
4,550.00 |
400.00 |
2,600.00 |
400.00 |
2,600.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
53.5 |
TON |
650.00 |
34,775.00 |
425.00 |
22,737.50 |
600.00 |
32,100.00 |
|
|
| 717-01 |
seeding
|
1,630   |
LB |
7.50 |
12,225.00 |
6.00 |
9,780.00 |
10.00 |
16,300.00 |
|
|
| 718-01 |
fertilizer
|
23,000   |
LB |
0.50 |
11,500.00 |
0.60 |
13,800.00 |
0.75 |
17,250.00 |
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
13,532   |
SQYD |
1.50 |
20,298.00 |
1.75 |
23,681.00 |
2.50 |
33,830.00 |
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
6,859   |
SQYD |
3.30 |
22,634.70 |
4.00 |
27,436.00 |
3.25 |
22,291.75 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
20,000.00 |
20,000.00 |
35,000.00 |
35,000.00 |
20,000.00 |
20,000.00 |
|
|
| 726-01 |
bedding material
|
500.0 |
CUYD |
92.00 |
46,000.00 |
85.00 |
42,500.00 |
80.00 |
40,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
300,000.00 |
300,000.00 |
425,000.00 |
425,000.00 |
400,000.00 |
400,000.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
850   |
EACH |
6.00 |
5,100.00 |
7.00 |
5,950.00 |
7.00 |
5,950.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
650   |
LNFT |
1.00 |
650.00 |
5.00 |
3,250.00 |
4.00 |
2,600.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
1,100   |
LNFT |
3.30 |
3,630.00 |
7.50 |
8,250.00 |
7.00 |
7,700.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.600 |
MILE |
2,500.00 |
16,500.00 |
2,300.00 |
15,180.00 |
2,200.00 |
14,520.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.300 |
MILE |
900.00 |
2,970.00 |
1,100.00 |
3,630.00 |
1,000.00 |
3,300.00 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
165.00 |
330.00 |
650.00 |
1,300.00 |
300.00 |
600.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
165.00 |
330.00 |
650.00 |
1,300.00 |
300.00 |
600.00 |
|
|
| 735-01 |
mailboxes
|
35   |
EACH |
22.00 |
770.00 |
10.00 |
350.00 |
1.00 |
35.00 |
|
|
| 735-02 |
mailbox supports (single)
|
35   |
EACH |
165.00 |
5,775.00 |
135.00 |
4,725.00 |
300.00 |
10,500.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
40,000.00 |
40,000.00 |
165,000.00 |
165,000.00 |
200,000.00 |
200,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
5,449,077.20 |
|
5,830,335.90 |
|
6,887,681.55 |
|
|
|