| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,076   |
LNFT |
6.60 |
7,101.60 |
5.00 |
5,380.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
400   |
CUYD |
19.00 |
7,600.00 |
24.00 |
9,600.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
40   |
EACH |
30.00 |
1,200.00 |
11.00 |
440.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
665   |
LNFT |
3.00 |
1,995.00 |
3.00 |
1,995.00 |
|
|
|
|
| 401-02-A |
aggregate surface course (adjusted vehicular
measurement)(stone or recycled portland cement concrete only) |
1,596   |
CUYD |
75.00 |
119,700.00 |
76.00 |
121,296.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
5,813.3 |
TON |
67.00 |
389,491.10 |
60.00 |
348,798.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,035.2 |
TON |
108.00 |
111,801.60 |
120.00 |
124,224.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
53,490   |
SQYD |
1.00 |
53,490.00 |
2.00 |
106,980.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,672   |
CUYD |
0.10 |
- 167.20 |
10.00 |
- 16,720.00 |
|
|
|
|
| 701-02-E/F |
cross drain pipe arch (30" equiv. rcpa or 36" equiv.
cmpa) |
112   |
LNFT |
145.00 |
16,240.00 |
340.00 |
38,080.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
444.0 |
LNFT |
38.00 |
16,872.00 |
44.00 |
19,536.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
162.5 |
LNFT |
19.00 |
3,087.50 |
21.00 |
3,412.50 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
300.0 |
LNFT |
44.00 |
13,200.00 |
54.00 |
16,200.00 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
66.00 |
6,600.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
12   |
EACH |
1,900.00 |
22,800.00 |
2,600.00 |
31,200.00 |
|
|
|
|
| 707-04 |
asphaltic curb
|
40.0 |
LNFT |
40.00 |
1,600.00 |
64.00 |
2,560.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,500.00 |
8,500.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
170   |
LNFT |
0.33 |
56.10 |
0.50 |
85.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
844   |
LNFT |
1.00 |
844.00 |
1.00 |
844.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
7.920 |
MILE |
140.00 |
1,108.80 |
200.00 |
1,584.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.260 |
MILE |
385.00 |
2,025.10 |
310.00 |
1,630.60 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
24.866 |
MILE |
770.00 |
19,146.82 |
470.00 |
11,687.02 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,040   |
SQYD |
80.00 |
163,200.00 |
62.00 |
126,480.00 |
|
|
|
|
| 726-01 |
bedding material
|
25.8 |
CUYD |
100.00 |
2,580.00 |
100.00 |
2,580.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
55,000.00 |
55,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
20   |
EACH |
80.00 |
1,600.00 |
90.00 |
1,800.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
975   |
EACH |
5.00 |
4,875.00 |
6.00 |
5,850.00 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
85   |
LNFT |
1.00 |
85.00 |
2.00 |
170.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
422   |
LNFT |
3.50 |
1,477.00 |
6.00 |
2,532.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
12.433 |
MILE |
2,500.00 |
31,082.50 |
2,600.00 |
32,325.80 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.630 |
MILE |
900.00 |
2,367.00 |
950.00 |
2,498.50 |
|
|
|
|
| 735-01 |
mailboxes
|
38   |
EACH |
10.00 |
380.00 |
7.00 |
266.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
38   |
EACH |
125.00 |
4,750.00 |
160.00 |
6,080.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
2.40 |
ACRE |
1,000.00 |
2,400.00 |
1,500.00 |
3,600.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
12,000.00 |
12,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
23,000.00 |
23,000.00 |
|
|
|
|
| S-001 |
u-channel post installation
|
27   |
EACH |
80.00 |
2,160.00 |
90.00 |
2,430.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,097,148.92 |
|
1,185,024.42 |
|
|
|
|
|