Letting of 6/27/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 269-04-0018
Parish: TANGIPAHOA
Routes: LA 442
Description: JCT. LA 1063 - I-55 CONTROL OF ACCESS
Type Const: drainage structures, cold planing asphaltic pavement, superpave asphaltic concrete
overlay, pavement patching, and related work.
Estimated Construction Cost: $1,203,024.00
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,097,148.92
2 06276 BARRIERE CONSTRUCTION CO., LLC. $1,185,024.42
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 1,076      LNFT 6.60 7,101.60 5.00 5,380.00        
203-08 borrow (vehicular measurement) 400      CUYD 19.00 7,600.00 24.00 9,600.00        
204-02 temporary hay or straw bales 40      EACH 30.00 1,200.00 11.00 440.00        
204-06 temporary silt fencing 665      LNFT 3.00 1,995.00 3.00 1,995.00        
401-02-A aggregate surface course (adjusted vehicular
measurement)(stone or recycled portland cement
concrete only)
1,596      CUYD 75.00 119,700.00 76.00 121,296.00        
502-01 superpave asphaltic concrete 5,813.3    TON 67.00 389,491.10 60.00 348,798.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,035.2    TON 108.00 111,801.60 120.00 124,224.00        
509-01 cold planing asphaltic pavement 53,490      SQYD 1.00 53,490.00 2.00 106,980.00        
509-02 contractor retained reclaimed asphaltic pavement - 1,672      CUYD 0.10 - 167.20 10.00 - 16,720.00        
701-02-E/F cross drain pipe arch (30" equiv. rcpa or 36" equiv.
cmpa)
112      LNFT 145.00 16,240.00 340.00 38,080.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 444.0    LNFT 38.00 16,872.00 44.00 19,536.00        
704-03 blocked out guard rail 162.5    LNFT 19.00 3,087.50 21.00 3,412.50        
704-07-A guard rail bridge attachments (single thrie beam) 300.0    LNFT 44.00 13,200.00 54.00 16,200.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 55.00 5,500.00 66.00 6,600.00        
704-11-A guard rail end treatment (flared) 12      EACH 1,900.00 22,800.00 2,600.00 31,200.00        
707-04 asphaltic curb 40.0    LNFT 40.00 1,600.00 64.00 2,560.00        
713-01 temporary signs & barricades lump      LUMP 8,500.00 8,500.00 20,000.00 20,000.00        
713-03-C temporary pavement markings (8" width) 170      LNFT 0.33 56.10 0.50 85.00        
713-03-E temporary pavement markings (24" width) 844      LNFT 1.00 844.00 1.00 844.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
7.920  MILE 140.00 1,108.80 200.00 1,584.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
5.260  MILE 385.00 2,025.10 310.00 1,630.60        
713-05-A temporary pavement markings (solid line)(4" width) 24.866  MILE 770.00 19,146.82 470.00 11,687.02        
724-01-B pavement patching (12" minimum thickness) 2,040      SQYD 80.00 163,200.00 62.00 126,480.00        
726-01 bedding material 25.8    CUYD 100.00 2,580.00 100.00 2,580.00        
727-01 mobilization lump      LUMP 55,000.00 55,000.00 100,000.00 100,000.00        
729-16-C object marker assembly (type 3) 20      EACH 80.00 1,600.00 90.00 1,800.00        
731-02 reflectorized raised pavement markers 975      EACH 5.00 4,875.00 6.00 5,850.00        
732-01-C plastic pavement striping (8" width) 85      LNFT 1.00 85.00 2.00 170.00        
732-01-E plastic pavement striping (24" width) 422      LNFT 3.50 1,477.00 6.00 2,532.00        
732-02-A plastic pavement striping (solid line) (4" width) 12.433  MILE 2,500.00 31,082.50 2,600.00 32,325.80        
732-03-A plastic pavement striping (broken line)(4" width) 2.630  MILE 900.00 2,367.00 950.00 2,498.50        
735-01 mailboxes 38      EACH 10.00 380.00 7.00 266.00        
735-02 mailbox supports (single) 38      EACH 125.00 4,750.00 160.00 6,080.00        
739-01 hydro-seeding 2.40   ACRE 1,000.00 2,400.00 1,500.00 3,600.00        
740-01 construction layout lump      LUMP 12,000.00 12,000.00 20,000.00 20,000.00        
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 23,000.00 23,000.00        
S-001 u-channel post installation 27      EACH 80.00 2,160.00 90.00 2,430.00        
                       
 CONTRACTOR TOTAL       1,097,148.92   1,185,024.42        