Letting of 6/27/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 161-09-0022
Parish: E CARROLL
Routes: LA 883-1
Description: LAKE PROVIDENCE CITY LIMITS TO JCT US 65
Type Const: cold planing asphaltic concrete, pavement patching, pavement widening, superpave
asphaltic concrete overlay and related work.
Estimated Construction Cost: $672,039.48
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $739,012.13
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $838,867.30
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 10,000.00 10,000.00 7,000.00 7,000.00        
202-02-D removal of concrete walks & drives 404      SQYD 10.00 4,040.00 21.00 8,484.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
270      CUYD 40.00 10,800.00 52.00 14,040.00        
502-01 superpave asphaltic concrete 2,150.2    TON 99.00 212,869.80 108.00 232,221.60        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
390.0    TON 140.00 54,600.00 200.00 78,000.00        
509-01 cold planing asphaltic pavement 13,749      SQYD 2.20 30,247.80 2.00 27,498.00        
509-02 contractor retained reclaimed asphaltic pavement - 430      CUYD 0.01 - 4.30 0.10 - 43.00        
510-01-B pavement patching (12" minimum thickness) 2,085      SQYD 85.00 177,225.00 109.00 227,265.00        
510-02 pavement widening 60.0    SQYD 200.00 12,000.00 200.00 12,000.00        
702-04-A adjusting manholes 11      EACH 1,500.00 16,500.00 1,800.00 19,800.00        
702-04-B adjusting catch basins 3      EACH 2,750.00 8,250.00 3,800.00 11,400.00        
706-02-C concrete drive (6" thick) 393.3    SQYD 55.00 21,631.50 95.00 37,363.50        
713-01 temporary signs & barricades lump      LUMP 67,000.00 67,000.00 31,000.00 31,000.00        
713-02-D temporary pavement markings (12" width) 264      LNFT 3.00 792.00 0.50 132.00        
713-02-E temporary pavement markings (24" width) 165      LNFT 4.00 660.00 1.00 165.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
3.099  MILE 250.00 774.75 200.00 619.80        
713-04-A temporary pavement markings (solid line)(4" width) 12.276  MILE 1.00 12.28 1,100.00 13,503.60        
727-01 mobilization lump      LUMP 73,000.00 73,000.00 80,000.00 80,000.00        
731-02 reflectorized raised pavement markers 138      EACH 12.50 1,725.00 7.00 966.00        
732-01-D plastic pavement striping (12" width) 88      LNFT 12.50 1,100.00 3.00 264.00        
732-01-E plastic pavement striping (24" width) 55      LNFT 15.50 852.50 5.00 275.00        
732-02-A plastic pavement striping (solid line) (4" width) 4.092  MILE 3,650.00 14,935.80 3,400.00 13,912.80        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00        
S-001 tree trimming lump      LUMP 10,000.00 10,000.00 13,000.00 13,000.00        
                       
 CONTRACTOR TOTAL       739,012.13   838,867.30        