| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - D & J CONSTRUCTION CO., INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
7,000.00 |
7,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
404   |
SQYD |
10.00 |
4,040.00 |
21.00 |
8,484.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
270   |
CUYD |
40.00 |
10,800.00 |
52.00 |
14,040.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
2,150.2 |
TON |
99.00 |
212,869.80 |
108.00 |
232,221.60 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
390.0 |
TON |
140.00 |
54,600.00 |
200.00 |
78,000.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
13,749   |
SQYD |
2.20 |
30,247.80 |
2.00 |
27,498.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 430   |
CUYD |
0.01 |
- 4.30 |
0.10 |
- 43.00 |
|
|
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
2,085   |
SQYD |
85.00 |
177,225.00 |
109.00 |
227,265.00 |
|
|
|
|
| 510-02 |
pavement widening
|
60.0 |
SQYD |
200.00 |
12,000.00 |
200.00 |
12,000.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
11   |
EACH |
1,500.00 |
16,500.00 |
1,800.00 |
19,800.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
3   |
EACH |
2,750.00 |
8,250.00 |
3,800.00 |
11,400.00 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
393.3 |
SQYD |
55.00 |
21,631.50 |
95.00 |
37,363.50 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
67,000.00 |
67,000.00 |
31,000.00 |
31,000.00 |
|
|
|
|
| 713-02-D |
temporary pavement markings (12" width)
|
264   |
LNFT |
3.00 |
792.00 |
0.50 |
132.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
165   |
LNFT |
4.00 |
660.00 |
1.00 |
165.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.099 |
MILE |
250.00 |
774.75 |
200.00 |
619.80 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
12.276 |
MILE |
1.00 |
12.28 |
1,100.00 |
13,503.60 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
73,000.00 |
73,000.00 |
80,000.00 |
80,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
138   |
EACH |
12.50 |
1,725.00 |
7.00 |
966.00 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
88   |
LNFT |
12.50 |
1,100.00 |
3.00 |
264.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
55   |
LNFT |
15.50 |
852.50 |
5.00 |
275.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.092 |
MILE |
3,650.00 |
14,935.80 |
3,400.00 |
13,912.80 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| S-001 |
tree trimming
|
lump |
LUMP |
10,000.00 |
10,000.00 |
13,000.00 |
13,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
739,012.13 |
|
838,867.30 |
|
|
|
|
|