Lead Project: 120-01-0015
Parish: SABINE
Routes: LA 474
Description: DESS ROAD - FLORIEN TOWN LIMITS
Type Const: grading, cold planing asphaltic concrete, in-place cement treated base course, superpave
asphaltic concrete overlay, lime treatment and related work.
Estimated Construction Cost: $1,940,072.97
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,799,931.27
2 08815 W. E. MCDONALD & SON, LLC. $1,997,274.46
3 12312 GILCHRIST CONSTRUCTION CO. LLC $2,160,111.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
W. E. MCDONALD & SON, LLC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 7,000.00 7,000.00 2,500.00 2,500.00 14,000.00 14,000.00    
202-02-D removal of concrete walks & drives 25      SQYD 41.00 1,025.00 65.00 1,625.00 50.00 1,250.00    
202-02-E removal of concrete curbs 590.0    LNFT 3.50 2,065.00 5.00 2,950.00 10.00 5,900.00    
202-02-H removal of guard rail 584      LNFT 6.00 3,504.00 3.00 1,752.00 6.00 3,504.00    
203-07 borrow (vehicular measurement) 646      CUYD 18.00 11,628.00 12.00 7,752.00 15.00 9,690.00    
203-07-A borrow (vehicular meas.)(selected soils) 200      CUYD 16.00 3,200.00 12.00 2,400.00 20.00 4,000.00    
304-01 lime 596.14   TON 150.00 89,421.00 153.00 91,209.42 155.00 92,401.70    
304-04-D lime treatment (type d) (12" thick) 37,850      SQYD 2.00 75,700.00 3.27 123,769.50 3.50 132,475.00    
308-01-A in-place cement treated base course (12" thick) 56,557      SQYD 6.25 353,481.25 6.50 367,620.50 6.50 367,620.50    
308-02 removal of existing patches 350      SQYD 16.00 5,600.00 15.00 5,250.00 20.00 7,000.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
2,002      CUYD 19.00 38,038.00 20.00 40,040.00 85.00 170,170.00    
502-01 superpave asphaltic concrete 10,003.3    TON 84.00 840,277.20 90.00 900,297.00 89.00 890,293.70    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
492.3    TON 140.00 68,922.00 140.00 68,922.00 175.00 86,152.50    
509-01 cold planing asphaltic pavement 53,165      SQYD 1.00 53,165.00 1.00 53,165.00 0.45 23,924.25    
509-02 contractor retained reclaimed asphaltic pavement - 3,765      CUYD 0.10 - 376.50 0.01 - 37.65 0.01 - 37.65    
701-10-P reinforced concrete pipe (extension)(54") 16      LNFT 435.00 6,960.00 350.00 5,600.00 300.00 4,800.00    
701-15 concrete collar 1      EACH 2,000.00 2,000.00 1,500.00 1,500.00 1,600.00 1,600.00    
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 560.0    LNFT 33.00 18,480.00 30.00 16,800.00 31.00 17,360.00    
704-03 blocked out guard rail 100.0    LNFT 20.00 2,000.00 18.00 1,800.00 20.00 2,000.00    
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 57.00 11,400.00 52.00 10,400.00 55.00 11,000.00    
704-11-B guard rail end treatment (tangent) 8      EACH 2,500.00 20,000.00 2,300.00 18,400.00 2,400.00 19,200.00    
707-04 asphaltic curb 80.0    LNFT 48.00 3,840.00 100.00 8,000.00 30.00 2,400.00    
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 100,000.00 100,000.00 120,000.00 120,000.00    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
11.259  MILE 135.00 1,519.97 200.00 2,251.80 350.00 3,940.65    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
4.239  MILE 300.00 1,271.70 0.01 0.04 50.00 211.95    
713-04-A temporary pavement markings (solid line)(4" width) 40.232  MILE 450.00 18,104.40 0.01 0.40 100.00 4,023.20    
717-01 seeding 113      LB 11.00 1,243.00 10.00 1,130.00 11.00 1,243.00    
718-01 fertilizer 3,760      LB 0.50 1,880.00 0.40 1,504.00 0.50 1,880.00    
722-01 project site laboratory 1      EACH 6,000.00 6,000.00 3,000.00 3,000.00 20,000.00 20,000.00    
726-01 bedding material 5.3    CUYD 225.00 1,192.50 175.00 927.50 90.00 477.00    
727-01 mobilization lump      LUMP 75,000.00 75,000.00 105,000.00 105,000.00 80,000.00 80,000.00    
729-16-B object marker assembly (type 2) 2      EACH 70.00 140.00 62.00 124.00 75.00 150.00    
729-16-C object marker assembly (type 3) 8      EACH 75.00 600.00 72.00 576.00 75.00 600.00    
731-02 reflectorized raised pavement markers 887      EACH 5.50 4,878.50 4.50 3,991.50 5.00 4,435.00    
732-01-C plastic pavement striping (8" width) 587      LNFT 0.80 469.60 1.00 587.00 1.00 587.00    
732-01-E plastic pavement striping (24" width) 367      LNFT 2.25 825.75 3.00 1,101.00 2.25 825.75    
732-02-A plastic pavement striping (solid line) (4" width) 13.399  MILE 2,600.00 34,837.40 2,150.00 28,807.85 2,500.00 33,497.50    
732-03-A plastic pavement striping (broken line)(4" width) 1.402  MILE 750.00 1,051.50 800.00 1,121.60 725.00 1,016.45    
735-01 mailboxes 17      EACH 1.00 17.00 1.00 17.00 50.00 850.00    
735-02 mailbox supports (single) 15      EACH 150.00 2,250.00 150.00 2,250.00 150.00 2,250.00    
735-03 mailbox supports (double) 2      EACH 200.00 400.00 185.00 370.00 200.00 400.00    
740-01 construction layout lump      LUMP 9,000.00 9,000.00 6,000.00 6,000.00 15,000.00 15,000.00    
S-001 cleaning existing ditches 50      LNFT 12.00 600.00 125.00 6,250.00 25.00 1,250.00    
S-002 saw cutting 110      INFT 12.00 1,320.00 5.00 550.00 7.00 770.00    
                       
 CONTRACTOR TOTAL       1,799,931.27   1,997,274.46   2,160,111.50    