| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1,500.00 |
1,500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
260   |
LNFT |
12.00 |
3,120.00 |
6.00 |
1,560.00 |
|
|
|
|
| 202-02-I |
removal of box culvert headwalls
|
1   |
EACH |
1,600.00 |
1,600.00 |
1,800.00 |
1,800.00 |
|
|
|
|
| 203-07 |
borrow (vehicular measurement)
|
425   |
CUYD |
21.00 |
8,925.00 |
15.00 |
6,375.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
3,589   |
CUYD |
53.00 |
190,217.00 |
75.00 |
269,175.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
17,171.4 |
TON |
76.00 |
1,305,026.40 |
74.50 |
1,279,269.30 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
568.7 |
TON |
135.00 |
76,774.50 |
130.00 |
73,931.00 |
|
|
|
|
| 507-01-A |
asphaltic material (crs-2p emulsion)
|
51,283   |
GAL |
2.25 |
115,386.75 |
2.30 |
117,950.90 |
|
|
|
|
| 507-02-B |
aggregate (s2)
|
75,416   |
SQYD |
0.85 |
64,103.60 |
0.90 |
67,874.40 |
|
|
|
|
| 507-02-C |
aggregate (s3)
|
75,416   |
SQYD |
0.65 |
49,020.40 |
0.65 |
49,020.40 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
500   |
SQYD |
18.00 |
9,000.00 |
15.00 |
7,500.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 30   |
CUYD |
0.10 |
- 3.00 |
0.01 |
- 0.30 |
|
|
|
|
| 510-01-A |
pavement patching (6" minimum thickness)
|
1,465   |
SQYD |
50.00 |
73,250.00 |
42.00 |
61,530.00 |
|
|
|
|
| 510-01-C |
pavement patching (16" minimum thickness)
|
410   |
SQYD |
110.00 |
45,100.00 |
90.00 |
36,900.00 |
|
|
|
|
| 701-08 |
relaying pipe
|
100   |
LNFT |
240.00 |
24,000.00 |
185.00 |
18,500.00 |
|
|
|
|
| 701-15 |
concrete collar
|
26   |
EACH |
1,600.00 |
41,600.00 |
1,200.00 |
31,200.00 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
242.0 |
LNFT |
45.00 |
10,890.00 |
32.00 |
7,744.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
87.5 |
LNFT |
22.00 |
1,925.00 |
19.00 |
1,662.50 |
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
55.00 |
5,500.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,200.00 |
8,800.00 |
2,000.00 |
8,000.00 |
|
|
|
|
| 711-01-C |
riprap (30 lb, 12" thick)
|
607   |
SQYD |
85.00 |
51,595.00 |
99.00 |
60,093.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
607   |
SQYD |
3.50 |
2,124.50 |
1.50 |
910.50 |
|
|
|
|
| 712-02 |
sacked concrete revetment
|
157   |
SQYD |
165.00 |
25,905.00 |
70.00 |
10,990.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
25,000.00 |
25,000.00 |
70,000.00 |
70,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
11.818 |
MILE |
140.00 |
1,654.52 |
350.00 |
4,136.30 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
16.716 |
MILE |
310.00 |
5,181.96 |
100.00 |
1,671.60 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
33.848 |
MILE |
475.00 |
16,077.80 |
150.00 |
5,077.20 |
|
|
|
|
| 713-06-A |
temporary reflectorized raised pavement markers (tabs)
|
3,122   |
EACH |
1.65 |
5,151.30 |
1.69 |
5,276.18 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
1.0 |
TON |
1,100.00 |
1,100.00 |
1,100.00 |
1,100.00 |
|
|
|
|
| 717-01 |
seeding
|
15   |
LB |
16.50 |
247.50 |
16.00 |
240.00 |
|
|
|
|
| 718-01 |
fertilizer
|
500   |
LB |
0.85 |
425.00 |
0.85 |
425.00 |
|
|
|
|
| 726-01 |
bedding material
|
56.4 |
CUYD |
120.00 |
6,768.00 |
60.00 |
3,384.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
70,000.00 |
70,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
24   |
EACH |
75.00 |
1,800.00 |
65.00 |
1,560.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
85.00 |
340.00 |
75.00 |
300.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
780   |
EACH |
5.50 |
4,290.00 |
5.50 |
4,290.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
15.222 |
MILE |
2,700.00 |
41,099.40 |
2,500.00 |
38,055.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
11.144 |
MILE |
750.00 |
8,358.00 |
750.00 |
8,358.00 |
|
|
|
|
| 735-01 |
mailboxes
|
20   |
EACH |
20.00 |
400.00 |
50.00 |
1,000.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
14   |
EACH |
150.00 |
2,100.00 |
150.00 |
2,100.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
5   |
EACH |
250.00 |
1,250.00 |
165.00 |
825.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,000.00 |
8,000.00 |
14,000.00 |
14,000.00 |
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
35.62 |
CUYD |
1,650.00 |
58,773.00 |
1,500.00 |
53,430.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
2,405   |
LB |
2.25 |
5,411.25 |
1.00 |
2,405.00 |
|
|
|
|
| S-001 |
cleaning existing ditches
|
400   |
LNFT |
25.00 |
10,000.00 |
20.00 |
8,000.00 |
|
|
|
|
| S-002 |
saw cutting
|
25,118   |
INFT |
0.65 |
16,326.70 |
1.10 |
27,629.80 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,435,614.58 |
|
2,450,748.78 |
|
|
|
|
|