Letting of 6/27/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 114-01-0021
Parish: VERNON
Routes: LA 117
Description: JCT. LA 111 - 5.9 MILES NORTH
Type Const: grading, superpave asphaltic concrete, asphaltic surface treatment, pavement patching,
and related work.
Estimated Construction Cost: $2,563,288.24
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,435,614.58
2 12312 GILCHRIST CONSTRUCTION CO. LLC $2,450,748.78
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 1,500.00 1,500.00 10,000.00 10,000.00        
202-02-H removal of guard rail 260      LNFT 12.00 3,120.00 6.00 1,560.00        
202-02-I removal of box culvert headwalls 1      EACH 1,600.00 1,600.00 1,800.00 1,800.00        
203-07 borrow (vehicular measurement) 425      CUYD 21.00 8,925.00 15.00 6,375.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
3,589      CUYD 53.00 190,217.00 75.00 269,175.00        
502-01 superpave asphaltic concrete 17,171.4    TON 76.00 1,305,026.40 74.50 1,279,269.30        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
568.7    TON 135.00 76,774.50 130.00 73,931.00        
507-01-A asphaltic material (crs-2p emulsion) 51,283      GAL 2.25 115,386.75 2.30 117,950.90        
507-02-B aggregate (s2) 75,416      SQYD 0.85 64,103.60 0.90 67,874.40        
507-02-C aggregate (s3) 75,416      SQYD 0.65 49,020.40 0.65 49,020.40        
509-01 cold planing asphaltic pavement 500      SQYD 18.00 9,000.00 15.00 7,500.00        
509-02 contractor retained reclaimed asphaltic pavement - 30      CUYD 0.10 - 3.00 0.01 - 0.30        
510-01-A pavement patching (6" minimum thickness) 1,465      SQYD 50.00 73,250.00 42.00 61,530.00        
510-01-C pavement patching (16" minimum thickness) 410      SQYD 110.00 45,100.00 90.00 36,900.00        
701-08 relaying pipe 100      LNFT 240.00 24,000.00 185.00 18,500.00        
701-15 concrete collar 26      EACH 1,600.00 41,600.00 1,200.00 31,200.00        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 242.0    LNFT 45.00 10,890.00 32.00 7,744.00        
704-03 blocked out guard rail 87.5    LNFT 22.00 1,925.00 19.00 1,662.50        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 60.00 6,000.00 55.00 5,500.00        
704-11-A guard rail end treatment (flared) 4      EACH 2,200.00 8,800.00 2,000.00 8,000.00        
711-01-C riprap (30 lb, 12" thick) 607      SQYD 85.00 51,595.00 99.00 60,093.00        
711-04 geotextile fabric 607      SQYD 3.50 2,124.50 1.50 910.50        
712-02 sacked concrete revetment 157      SQYD 165.00 25,905.00 70.00 10,990.00        
713-01 temporary signs & barricades lump      LUMP 25,000.00 25,000.00 70,000.00 70,000.00        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
11.818  MILE 140.00 1,654.52 350.00 4,136.30        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
16.716  MILE 310.00 5,181.96 100.00 1,671.60        
713-04-A temporary pavement markings (solid line)(4" width) 33.848  MILE 475.00 16,077.80 150.00 5,077.20        
713-06-A temporary reflectorized raised pavement markers (tabs) 3,122      EACH 1.65 5,151.30 1.69 5,276.18        
716-01-A mulch (vegetative) 1.0    TON 1,100.00 1,100.00 1,100.00 1,100.00        
717-01 seeding 15      LB 16.50 247.50 16.00 240.00        
718-01 fertilizer 500      LB 0.85 425.00 0.85 425.00        
726-01 bedding material 56.4    CUYD 120.00 6,768.00 60.00 3,384.00        
727-01 mobilization lump      LUMP 100,000.00 100,000.00 70,000.00 70,000.00        
729-16-B object marker assembly (type 2) 24      EACH 75.00 1,800.00 65.00 1,560.00        
729-16-C object marker assembly (type 3) 4      EACH 85.00 340.00 75.00 300.00        
731-02 reflectorized raised pavement markers 780      EACH 5.50 4,290.00 5.50 4,290.00        
732-02-A plastic pavement striping (solid line) (4" width) 15.222  MILE 2,700.00 41,099.40 2,500.00 38,055.00        
732-03-A plastic pavement striping (broken line)(4" width) 11.144  MILE 750.00 8,358.00 750.00 8,358.00        
735-01 mailboxes 20      EACH 20.00 400.00 50.00 1,000.00        
735-02 mailbox supports (single) 14      EACH 150.00 2,100.00 150.00 2,100.00        
735-03 mailbox supports (double) 5      EACH 250.00 1,250.00 165.00 825.00        
740-01 construction layout lump      LUMP 8,000.00 8,000.00 14,000.00 14,000.00        
805-01-B class a concrete (box culvert headwalls) 35.62   CUYD 1,650.00 58,773.00 1,500.00 53,430.00        
806-01 deformed reinforcing steel 2,405      LB 2.25 5,411.25 1.00 2,405.00        
S-001 cleaning existing ditches 400      LNFT 25.00 10,000.00 20.00 8,000.00        
S-002 saw cutting 25,118      INFT 0.65 16,326.70 1.10 27,629.80        
                       
 CONTRACTOR TOTAL       2,435,614.58   2,450,748.78        