| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures and obstructions
|
lump |
LUMP |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-B-01 |
removal of concrete box culverts (sta 108+59.26,
2-4'x3'x30') |
1   |
EACH |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 202-02-G-01 |
removal of surfacing & stabilized base (sta.
100+45.00 to sta. 116+07.00) |
3,471.1 |
SQYD |
6.00 |
20,826.60 |
|
|
|
|
|
|
| 203-01 |
general excavation
|
3,101   |
CUYD |
4.00 |
12,404.00 |
|
|
|
|
|
|
| 203-04 |
embankment
|
16,849   |
CUYD |
15.00 |
252,735.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
16   |
EACH |
250.00 |
4,000.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
3,124   |
LNFT |
6.00 |
18,744.00 |
|
|
|
|
|
|
| 302-02-E-01 |
class ii base course (8" thick, crushed stone or
recycled pccp) |
4,812.3 |
SQYD |
22.00 |
105,870.60 |
|
|
|
|
|
|
| 304-01 |
lime
|
68.21 |
TON |
160.00 |
10,913.60 |
|
|
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
4,812   |
SQYD |
5.00 |
24,060.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
102   |
CUYD |
75.00 |
7,650.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
859.5 |
TON |
95.00 |
81,652.50 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
12   |
EACH |
105.00 |
1,260.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
12   |
EACH |
105.00 |
1,260.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
114   |
LB |
11.00 |
1,254.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
4,000   |
LB |
0.50 |
2,000.00 |
|
|
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
160.0 |
CUYD |
90.00 |
14,400.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
80,000.00 |
80,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
100.00 |
400.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
40   |
EACH |
19.00 |
760.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.590 |
MILE |
8,500.00 |
5,015.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.295 |
MILE |
2,200.00 |
649.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
16.26 |
CUYD |
950.00 |
15,447.00 |
|
|
|
|
|
|
| 805-12-F |
reinforced concrete box culverts (5'x4')
|
400.0 |
LNFT |
300.00 |
120,000.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
1,594   |
LB |
4.00 |
6,376.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
927,677.30 |
|
|
|
|
|
|
|