| DBE GOAL FED |
| Lead Project: 089-04-0012 |
| Parish: BIENVILLE |
| Routes: LA 9 |
| Description: JUNCTION LA 507 (EAST) - JUNCTION LA 517 |
Type Const:
grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
surface preparation, pavement patching and related work. |
| Estimated Construction Cost: $1,814,133.80 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
15   |
SQYD |
1.00 |
15.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
601.9 |
SQYD |
1.00 |
601.90 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
332   |
LNFT |
3.95 |
1,311.40 |
|
|
|
|
|
|
| 202-02-I |
removal of reinforced concrete pipe headwalls
|
2   |
EACH |
750.00 |
1,500.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
15,500.00 |
15,500.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
6,900   |
CUYD |
11.50 |
79,350.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
250   |
CUYD |
40.00 |
10,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
14,379.5 |
TON |
68.30 |
982,119.85 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
525.0 |
TON |
52.30 |
27,457.50 |
|
|
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
2,628   |
SQYD |
5.05 |
13,271.40 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 91   |
CUYD |
1.00 |
- 91.00 |
|
|
|
|
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
20   |
LNFT |
180.00 |
3,600.00 |
|
|
|
|
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
700.00 |
1,400.00 |
|
|
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
256.0 |
LNFT |
31.00 |
7,936.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
75.0 |
LNFT |
19.50 |
1,462.50 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
54.00 |
5,400.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,000.00 |
8,000.00 |
|
|
|
|
|
|
| 712-04 |
flexible revetment
|
50   |
SQYD |
70.00 |
3,500.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
76,500.00 |
76,500.00 |
|
|
|
|
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
270   |
LNFT |
0.01 |
2.70 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
88   |
LNFT |
0.01 |
0.88 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
13.000 |
MILE |
400.00 |
5,200.00 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.726 |
MILE |
1.00 |
6.73 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
43.600 |
MILE |
1.00 |
43.60 |
|
|
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
4   |
EACH |
1.00 |
4.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
15.80 |
ACRE |
1,200.00 |
18,960.00 |
|
|
|
|
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
1,200   |
SQYD |
33.00 |
39,600.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
76,500.00 |
76,500.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
70.00 |
280.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
874   |
EACH |
4.50 |
3,933.00 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
135   |
LNFT |
1.00 |
135.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
44   |
LNFT |
3.00 |
132.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
21.800 |
MILE |
2,150.00 |
46,870.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.363 |
MILE |
800.00 |
2,690.40 |
|
|
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
400.00 |
800.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
13   |
EACH |
1.00 |
13.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
9   |
EACH |
125.00 |
1,125.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
175.00 |
350.00 |
|
|
|
|
|
|
| 739-01 |
hydro-seeding
|
15.80 |
ACRE |
1,200.00 |
18,960.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
19,500.00 |
19,500.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
12,500.00 |
12,500.00 |
|
|
|
|
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
205,000.00 |
205,000.00 |
|
|
|
|
|
|
| S-002 |
saw cutting concrete drives (4" depth)
|
12   |
LNFT |
62.50 |
750.00 |
|
|
|
|
|
|
| S-003 |
raised asphaltic concrete median(4" thick)
|
21.2 |
SQYD |
49.60 |
1,051.52 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,693,242.38 |
|
|
|
|
|
|
|