Letting of 6/27/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 089-04-0012
Parish: BIENVILLE
Routes: LA 9
Description: JUNCTION LA 507 (EAST) - JUNCTION LA 517
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
surface preparation, pavement patching and related work.
Estimated Construction Cost: $1,814,133.80
 
RankLicenseBidderConstruction Bid
1 08584 MADDEN CONTRACTING CO., INC. $1,693,242.38
 
Item Number Item Description Quantity Unit of Measure - 1 -
MADDEN CONTRACTING CO., INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 15      SQYD 1.00 15.00            
202-02-G removal of surfacing & stabilized base 601.9    SQYD 1.00 601.90            
202-02-H removal of guard rail 332      LNFT 3.95 1,311.40            
202-02-I removal of reinforced concrete pipe headwalls 2      EACH 750.00 1,500.00            
203-06 excavation & embankment lump      LUMP 15,500.00 15,500.00            
203-08 borrow (vehicular measurement) 6,900      CUYD 11.50 79,350.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
250      CUYD 40.00 10,000.00            
502-01 superpave asphaltic concrete 14,379.5    TON 68.30 982,119.85            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
525.0    TON 52.30 27,457.50            
509-01 cold planing asphaltic pavement 2,628      SQYD 5.05 13,271.40            
509-02 contractor retained reclaimed asphaltic pavement - 91      CUYD 1.00 - 91.00            
701-10-K reinforced concrete pipe (extension)(30") 20      LNFT 180.00 3,600.00            
701-15 concrete collar 2      EACH 700.00 1,400.00            
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 256.0    LNFT 31.00 7,936.00            
704-03 blocked out guard rail 75.0    LNFT 19.50 1,462.50            
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 54.00 5,400.00            
704-11-A guard rail end treatment (flared) 4      EACH 2,000.00 8,000.00            
712-04 flexible revetment 50      SQYD 70.00 3,500.00            
713-01 temporary signs & barricades lump      LUMP 76,500.00 76,500.00            
713-03-C temporary pavement markings (8" width) 270      LNFT 0.01 2.70            
713-03-E temporary pavement markings (24" width) 88      LNFT 0.01 0.88            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
13.000  MILE 400.00 5,200.00            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.726  MILE 1.00 6.73            
713-05-A temporary pavement markings (solid line)(4" width) 43.600  MILE 1.00 43.60            
713-06-D temporary pavement legends and symbols (rr crossing) 4      EACH 1.00 4.00            
716-01-A mulch (vegetative) 15.80   ACRE 1,200.00 18,960.00            
724-01-A pavement patching (6" minimum thickness) 1,200      SQYD 33.00 39,600.00            
727-01 mobilization lump      LUMP 76,500.00 76,500.00            
729-16-C object marker assembly (type 3) 4      EACH 70.00 280.00            
731-02 reflectorized raised pavement markers 874      EACH 4.50 3,933.00            
732-01-C plastic pavement striping (8" width) 135      LNFT 1.00 135.00            
732-01-E plastic pavement striping (24" width) 44      LNFT 3.00 132.00            
732-02-A plastic pavement striping (solid line) (4" width) 21.800  MILE 2,150.00 46,870.00            
732-03-A plastic pavement striping (broken line)(4" width) 3.363  MILE 800.00 2,690.40            
732-04-D plastic pavement legends & symbols (rr crossing) 2      EACH 400.00 800.00            
735-01 mailboxes 13      EACH 1.00 13.00            
735-02 mailbox supports (single) 9      EACH 125.00 1,125.00            
735-03 mailbox supports (double) 2      EACH 175.00 350.00            
739-01 hydro-seeding 15.80   ACRE 1,200.00 18,960.00            
740-01 construction layout lump      LUMP 19,500.00 19,500.00            
744-01 traffic control management lump      LUMP 12,500.00 12,500.00            
S-001 surface preparation lump      LUMP 205,000.00 205,000.00            
S-002 saw cutting concrete drives (4" depth) 12      LNFT 62.50 750.00            
S-003 raised asphaltic concrete median(4" thick) 21.2    SQYD 49.60 1,051.52            
                       
 CONTRACTOR TOTAL       1,693,242.38            