Lead Project: 023-03-0013
Parish: GRANT, WINN
Routes: US 167
Description: DRY PRONG - WINN PARISH LINE
Type Const: grading, drainage structures, lime treatment, class ii base course, superpave asphaltic
concrete pavement, concrete slab span bridges, traffic signalization and related work
Estimated Construction Cost: $40,752,330.56
Maximum Number of Days Allowed for Construction: 800
Calculated Daily User Cost: $4,200.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $34,547,716.96 800 $37,907,716.96
2 34567 JAMES CONSTRUCTION GROUP LLC $34,905,798.70 800 $38,265,798.70
3 12312 GILCHRIST CONSTRUCTION CO. LLC $36,767,360.67 800 $40,127,360.67
4 42076 AUSTIN BRIDGE & ROAD, LP $36,842,509.38 650 $39,572,509.38
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
JAMES CONSTRUCTION GROUP LLC
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
AUSTIN BRIDGE & ROAD, LP
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 1,000,000.00 1,000,000.00 1,200,000.00 1,200,000.00 1,400,000.00 1,400,000.00 905,000.00 905,000.00
202-01 removal of structures & obstructions lump      LUMP 65,000.00 65,000.00 90,000.00 90,000.00 80,000.00 80,000.00 40,000.00 40,000.00
202-02-D removal of concrete walks & drives 9      SQYD 55.00 495.00 100.00 900.00 50.00 450.00 100.00 900.00
202-02-G removal of surfacing & stabilized base 3,561.8    SQYD 4.30 15,315.74 5.50 19,589.90 7.00 24,932.60 10.00 35,618.00
202-02-H removal of guard rail 780      LNFT 5.50 4,290.00 3.00 2,340.00 11.00 8,580.00 10.00 7,800.00
202-02-I removal of paved shoulders 8,860.6    SQYD 4.50 39,872.70 4.00 35,442.40 5.00 44,303.00 12.00 106,327.20
202-02-01 removal of 326 sq. ft. wood storage building (lt. of
sta. 220+00.00)
1      EACH 550.00 550.00 800.00 800.00 300.00 300.00 1,000.00 1,000.00
202-02-02 removal of 1,962 sq. ft. brick residence (lt. of sta.
222+27.21) (contains non-friable asbestos)
1      EACH 8,000.00 8,000.00 7,500.00 7,500.00 3,000.00 3,000.00 11,950.00 11,950.00
202-02-03 removal of 223 sq. ft. brick storage building (lt. of
sta. 222+47.21) (contains non-friable asbestos)
1      EACH 8,000.00 8,000.00 1,100.00 1,100.00 300.00 300.00 5,850.00 5,850.00
202-02-04 removal of 1,249 sq. ft. swimming pool (lt. of sta.
223+00.00)
1      EACH 2,000.00 2,000.00 2,300.00 2,300.00 800.00 800.00 3,750.00 3,750.00
202-02-05 removal of 30.0' x 28.0' wood residence (lt. of sta.
224+21.60)
1      EACH 2,600.00 2,600.00 2,600.00 2,600.00 700.00 700.00 1,000.00 1,000.00
202-02-06 removal of 16.2' x 11.9' wood storage building (lt. of
sta. 225+29.36)
1      EACH 2,700.00 2,700.00 500.00 500.00 300.00 300.00 200.00 200.00
202-02-07 removal of 2,481 sq. ft. wood residence (lt. of sta.
227+08.31)
1      EACH 5,500.00 5,500.00 7,600.00 7,600.00 2,500.00 2,500.00 7,400.00 7,400.00
202-02-08 removal of 572 sq. ft. mobile home (lt. of sta.
228+15.32)
1      EACH 1,100.00 1,100.00 100.00 100.00 300.00 300.00 1,500.00 1,500.00
202-02-09 removal of 62.4' x 20.0' metal barn (lt.of sta.
228+24.42)
1      EACH 7,700.00 7,700.00 2,300.00 2,300.00 700.00 700.00 1,000.00 1,000.00
202-02-10 removal of 76.6' x 30.5' mobile home (lt. of sta.
229+46.67)
1      EACH 2,750.00 2,750.00 1,400.00 1,400.00 300.00 300.00 500.00 500.00
202-02-11 removal of 25.5' x 12.0' storage building (lt. of sta.
228+13.67)
1      EACH 1,100.00 1,100.00 800.00 800.00 300.00 300.00 250.00 250.00
202-02-12 removal of 17.6' x 11.2' wood building (lt. of sta.
266+92.32)
1      EACH 550.00 550.00 500.00 500.00 1,200.00 1,200.00 600.00 600.00
202-02-13 removal of 160 sq. ft. wood building (lt. of sta.
287+50.80)
1      EACH 2,750.00 2,750.00 400.00 400.00 1,200.00 1,200.00 500.00 500.00
202-02-14 removal of 1,454 sq. ft. wood residence (lt. of sta.
287+91.89)
1      EACH 2,200.00 2,200.00 4,450.00 4,450.00 3,600.00 3,600.00 4,400.00 4,400.00
202-02-15 removal of 72.1' x 13.5' mobile home (lt. of sta.
288+04.46)
1      EACH 1,100.00 1,100.00 100.00 100.00 300.00 300.00 500.00 500.00
202-02-16 removal of 856 sq. ft. wood building (lt. of sta.
288+08.15)
1      EACH 1,100.00 1,100.00 2,000.00 2,000.00 1,200.00 1,200.00 1,000.00 1,000.00
202-02-17 removal of 2,595 sq. ft. brick residence (lt. of sta.
288+39.39) (contains friable asbestos)
1      EACH 8,800.00 8,800.00 10,000.00 10,000.00 1,800.00 1,800.00 14,150.00 14,150.00
202-02-18 removal of 2,017 sq. ft. metal building (lt. of sta.
288+66.20)
1      EACH 2,750.00 2,750.00 3,700.00 3,700.00 3,600.00 3,600.00 6,100.00 6,100.00
202-02-19 removal of 638 sq. ft. wood building (lt. of sta.
295+30.00)
1      EACH 1,100.00 1,100.00 1,600.00 1,600.00 700.00 700.00 1,900.00 1,900.00
202-02-20 removal of 960.5 sq. ft. wood residence (lt. of sta.
296+13.14) (contains non-friable asbestos)
1      EACH 5,500.00 5,500.00 3,200.00 3,200.00 1,500.00 1,500.00 7,950.00 7,950.00
202-02-21 removal of 35.0' x 13.7' wood shed (rt. of sta.
15+78.43-la 472)
1      EACH 220.00 220.00 1,200.00 1,200.00 700.00 700.00 1,400.00 1,400.00
202-02-22 removal of 16.2' x 10.0' metal building (rt. of sta.
15+91.39-la 472)
1      EACH 2,200.00 2,200.00 300.00 300.00 700.00 700.00 100.00 100.00
202-02-23 removal of 31.7' x 24.0' building (lt. of sta.
17+46.33-la 472)
1      EACH 8,800.00 8,800.00 1,850.00 1,850.00 3,600.00 3,600.00 2,700.00 2,700.00
202-02-24 removal of 50.1' x 28.2' wood residence (lt. of sta.
731+24.05) (contains non-friable asbestos)
1      EACH 220.00 220.00 4,600.00 4,600.00 1,800.00 1,800.00 9,250.00 9,250.00
202-02-25 removal of 192 sq. ft. metal building (lt. of sta.
731+25.00)
1      EACH 220.00 220.00 400.00 400.00 700.00 700.00 600.00 600.00
202-02-26 removal of 192 sq. ft. metal building (lt. of sta.
731+65.00)
1      EACH 220.00 220.00 400.00 400.00 700.00 700.00 600.00 600.00
202-02-27 removal of 189 sq. ft. metal building (lt. of sta.
732+05.00)
1      EACH 220.00 220.00 400.00 400.00 700.00 700.00 600.00 600.00
202-02-28 removal of 373 sq. ft. metal building (lt. of sta.
732+10.00)
1      EACH 220.00 220.00 700.00 700.00 2,400.00 2,400.00 200.00 200.00
202-02-29 removal of 1,025 sq. ft. wood building (lt. of sta.
16+00.00-left turn military road)
1      EACH 2,750.00 2,750.00 2,500.00 2,500.00 1,800.00 1,800.00 3,100.00 3,100.00
202-02-30 removal of 47' x 1' concrete retaining wall (rt. of
sta. 375+25.87)
1      EACH 550.00 550.00 150.00 150.00 2,500.00 2,500.00 1,000.00 1,000.00
202-02-31 removal of propane tank (lt. of sta. 732+42.82) 1      EACH 2,750.00 2,750.00 1,650.00 1,650.00 1,000.00 1,000.00 100.00 100.00
202-03-01 relocation of 12' x 6.5' cattle guard (lt. of sta.
735+00.00)
1      EACH 5,500.00 5,500.00 3,600.00 3,600.00 5,000.00 5,000.00 2,000.00 2,000.00
202-03-02 relocation of 21' x 5' cattle guard (lt. of sta.
738+78.44)
1      EACH 5,500.00 5,500.00 3,600.00 3,600.00 5,000.00 5,000.00 3,000.00 3,000.00
203-01 general excavation 957,773      CUYD 3.40 3,256,428.20 2.60 2,490,209.80 2.80 2,681,764.40 3.34 3,198,961.82
203-02 drainage excavation 13,742      CUYD 5.00 68,710.00 15.00 206,130.00 9.00 123,678.00 8.00 109,936.00
203-03 embankment 880,508      CUYD 4.50 3,962,286.00 3.50 3,081,778.00 6.25 5,503,175.00 5.00 4,402,540.00
203-04-A nonplastic embankment (stone) 237      CUYD 115.00 27,255.00 80.00 18,960.00 190.00 45,030.00 100.00 23,700.00
203-08 geotextile fabric 1,520      SQYD 1.25 1,900.00 3.00 4,560.00 1.60 2,432.00 4.41 6,703.20
204-02 temporary hay or straw bales 448      EACH 16.00 7,168.00 13.50 6,048.00 20.00 8,960.00 8.00 3,584.00
204-03 temporary slope drains 586      LNFT 24.00 14,064.00 12.00 7,032.00 15.00 8,790.00 10.00 5,860.00
204-05-A temporary sediment check dams (hay) 475      EACH 110.00 52,250.00 110.00 52,250.00 150.00 71,250.00 90.00 42,750.00
204-05-B temporary sediment check dams (stone) 557      EACH 600.00 334,200.00 500.00 278,500.00 430.00 239,510.00 523.88 291,801.16
204-06 temporary silt fencing 107,898      LNFT 2.25 242,770.50 2.20 237,375.60 1.60 172,636.80 1.35 145,662.30
204-07 temporary stone construction entrance 2      EACH 4,100.00 8,200.00 4,000.00 8,000.00 2,400.00 4,800.00 1,926.10 3,852.20
302-02-A-01 class ii base course (4" thick)(stone or recycled pccp) 387,580.8    SQYD 9.15 3,546,364.32 9.50 3,682,017.60 9.50 3,682,017.60 11.00 4,263,388.80
302-02-C-01 class ii base course (8" thick)(soil cement) 343,844.5    SQYD 9.25 3,180,561.63 9.10 3,128,984.95 9.25 3,180,561.63 8.50 2,922,678.25
304-01 lime 2,919.37   TON 1.00 2,919.37 160.00 467,099.20 50.00 145,968.50 40.00 116,774.80
304-04-D lime treatment (type d) (12" thick) 205,952      SQYD 1.00 205,952.00 1.50 308,928.00 0.35 72,083.20 0.50 102,976.00
401-01 aggregate surface course (net section)(shoulders) 9,853.0    CUYD 72.00 709,416.00 90.00 886,770.00 70.00 689,710.00 80.00 788,240.00
401-02 aggregate surface course (adjusted vehicular
measurement)(driveways)
459      CUYD 78.00 35,802.00 85.00 39,015.00 95.00 43,605.00 90.00 41,310.00
402-01 traffic maintenance aggregate (vehicular measurement) 10,000.0    CUYD 30.00 300,000.00 112.00 1,120,000.00 20.00 200,000.00 20.00 200,000.00
502-01 superpave asphaltic concrete 74,090.9    TON 75.00 5,556,817.50 77.00 5,704,999.30 82.00 6,075,453.80 84.00 6,223,635.60
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
12,862.2    TON 93.00 1,196,184.60 97.00 1,247,633.40 95.00 1,221,909.00 90.00 1,157,598.00
701-01-G cross drain pipe (18" rcp/pcp) 1,924      LNFT 60.00 115,440.00 57.00 109,668.00 72.00 138,528.00 50.00 96,200.00
701-01-I cross drain pipe (24" rcp/pcp) 3,810      LNFT 75.00 285,750.00 65.00 247,650.00 90.00 342,900.00 65.00 247,650.00
701-01-K cross drain pipe (30" rcp/pcp) 1,208      LNFT 95.00 114,760.00 98.00 118,384.00 100.00 120,800.00 80.00 96,640.00
701-01-M cross drain pipe (36" rcp/pcp) 120      LNFT 120.00 14,400.00 110.00 13,200.00 125.00 15,000.00 95.00 11,400.00
701-01-N cross drain pipe (42" rcp/pcp) 1,544      LNFT 180.00 277,920.00 137.00 211,528.00 155.00 239,320.00 125.00 193,000.00
701-01-N-01 cross drain pipe (42" rcp)(class iv concrete) 398      LNFT 215.00 85,570.00 162.00 64,476.00 130.00 51,740.00 200.00 79,600.00
701-01-O cross drain pipe (48" rcp/pcp) 624      LNFT 220.00 137,280.00 200.00 124,800.00 185.00 115,440.00 180.00 112,320.00
701-01-P cross drain pipe (54" rcp/pcp) 610      LNFT 250.00 152,500.00 200.00 122,000.00 225.00 137,250.00 225.00 137,250.00
701-02-D cross drain pipe arch (24" equiv. rcpa) 270      LNFT 80.00 21,600.00 101.00 27,270.00 115.00 31,050.00 100.00 27,000.00
701-02-G cross drain pipe arch (42" equiv. rcpa) 568      LNFT 190.00 107,920.00 183.00 103,944.00 175.00 99,400.00 175.00 99,400.00
701-02-H cross drain pipe arch (48" equiv. rcpa) 186      LNFT 225.00 41,850.00 204.00 37,944.00 200.00 37,200.00 200.00 37,200.00
701-05-G side drain pipe (18") 1,086      LNFT 62.00 67,332.00 38.00 41,268.00 75.00 81,450.00 50.00 54,300.00
701-05-G-01 side drain pipe (18")(erosion) 179      LNFT 62.00 11,098.00 45.00 8,055.00 200.00 35,800.00 50.00 8,950.00
701-10-I reinforced concrete pipe (extension)(24") 178      LNFT 200.00 35,600.00 49.00 8,722.00 95.00 16,910.00 150.00 26,700.00
701-10-K reinforced concrete pipe (extension)(30") 12      LNFT 275.00 3,300.00 86.00 1,032.00 165.00 1,980.00 200.00 2,400.00
701-15 concrete collar 1      EACH 1,200.00 1,200.00 850.00 850.00 1,000.00 1,000.00 1,000.00 1,000.00
702-02-B manholes (r-cb-11) 2      EACH 5,000.00 10,000.00 4,335.00 8,670.00 3,000.00 6,000.00 5,000.00 10,000.00
702-03-A catch basins (cb-01) 49      EACH 3,600.00 176,400.00 4,090.00 200,410.00 3,000.00 147,000.00 2,700.00 132,300.00
702-03-B catch basins (cb-02) 17      EACH 4,500.00 76,500.00 5,625.00 95,625.00 4,500.00 76,500.00 4,000.00 68,000.00
702-05-A cross drain end treatment (1 barrel, 24" rcp/pcp) 29      EACH 1,800.00 52,200.00 800.00 23,200.00 1,650.00 47,850.00 2,000.00 58,000.00
702-05-B cross drain end treatment (1 barrel, 30" rcp/pcp) 9      EACH 3,000.00 27,000.00 1,100.00 9,900.00 1,800.00 16,200.00 2,250.00 20,250.00
702-05-C cross drain end treatment (1 barrel, 36" rcp/pcp) 2      EACH 3,400.00 6,800.00 1,300.00 2,600.00 3,300.00 6,600.00 2,500.00 5,000.00
702-05-D cross drain end treatment (1 barrel, 42" rcp/pcp) 11      EACH 4,500.00 49,500.00 1,900.00 20,900.00 3,450.00 37,950.00 2,750.00 30,250.00
702-05-E cross drain end treatment (1 barrel, 48" rcp/pcp) 6      EACH 5,300.00 31,800.00 2,870.00 17,220.00 3,600.00 21,600.00 3,000.00 18,000.00
702-05-F cross drain end treatment (1 barrel, 54" rcp/pcp) 4      EACH 6,500.00 26,000.00 3,300.00 13,200.00 7,200.00 28,800.00 3,250.00 13,000.00
702-05-G cross drain end treatment (1 barrel, 24" equiv. rcpa) 2      EACH 4,000.00 8,000.00 770.00 1,540.00 1,800.00 3,600.00 2,000.00 4,000.00
702-05-H cross drain end treatment (1 barrel, 42" equiv. rcpa) 4      EACH 7,700.00 30,800.00 1,600.00 6,400.00 3,600.00 14,400.00 2,750.00 11,000.00
702-05-I cross drain end treatment (1 barrel, 48" equiv. rcpa) 1      EACH 9,000.00 9,000.00 2,375.00 2,375.00 7,200.00 7,200.00 3,000.00 3,000.00
702-07-A cross drain safety end (type 1) 3      EACH 3,500.00 10,500.00 2,375.00 7,125.00 2,200.00 6,600.00 2,500.00 7,500.00
704-03 blocked out guard rail 1,800.5    LNFT 19.00 34,209.50 17.50 31,508.75 18.00 32,409.00 17.20 30,968.60
704-06 guard rail anchor sections (trailing end) 12.5    LNFT 77.00 962.50 70.00 875.00 50.00 625.00 45.00 562.50
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 55.00 11,000.00 50.00 10,000.00 55.00 11,000.00 52.00 10,400.00
704-11-A guard rail end treatment (flared) 9      EACH 2,000.00 18,000.00 1,850.00 16,650.00 2,100.00 18,900.00 1,925.00 17,325.00
705-01 barbed wire fence 12,625      LNFT 5.50 69,437.50 5.20 65,650.00 5.50 69,437.50 5.20 65,650.00
705-04 single swinging driveway gate 1      EACH 550.00 550.00 350.00 350.00 600.00 600.00 350.00 350.00
706-03-C incidental concrete paving (6" thick) 956.3    SQYD 110.00 105,193.00 70.00 66,941.00 75.00 71,722.50 70.00 66,941.00
708-01 right-of-way monument 219      EACH 105.00 22,995.00 140.00 30,660.00 300.00 65,700.00 200.00 43,800.00
708-02 right-of-way monument witness post 219      EACH 105.00 22,995.00 50.00 10,950.00 300.00 65,700.00 200.00 43,800.00
711-01-D riprap (55 lb, 18" thick) 25,588      SQYD 60.00 1,535,280.00 56.00 1,432,928.00 60.00 1,535,280.00 65.00 1,663,220.00
711-04 geotextile fabric 30,521      SQYD 3.50 106,823.50 6.00 183,126.00 1.75 53,411.75 1.50 45,781.50
712-02 sacked concrete revetment 177      SQYD 165.00 29,205.00 150.00 26,550.00 200.00 35,400.00 75.00 13,275.00
713-01 temporary signs & barricades lump      LUMP 250,000.00 250,000.00 68,000.00 68,000.00 240,000.00 240,000.00 195,150.00 195,150.00
713-03-B-01 temporary pavement markings (broken line)(4" width)
(10' length) (type 1 removable)
0.426  MILE 5,500.00 2,343.00 10,000.00 4,260.00 5,500.00 2,343.00 10,000.00 4,260.00
713-04-E-01 temporary pavement markings (solid line)(24" width)
(type 1 removable)
0.134  MILE 70,000.00 9,380.00 35,000.00 4,690.00 71,000.00 9,514.00 35,000.00 4,690.00
715-01 topsoil 18,124      CUYD 12.00 217,488.00 8.00 144,992.00 18.00 326,232.00 3.00 54,372.00
720-01-A erosion control system, slope protection (type a) 77,245      SQYD 1.00 77,245.00 1.00 77,245.00 1.15 88,831.75 1.00 77,245.00
720-01-B erosion control system, slope protection (type b) 48,460      SQYD 1.00 48,460.00 1.00 48,460.00 1.15 55,729.00 1.00 48,460.00
720-01-C erosion control system, flexible channel liner (type c) 2,596      SQYD 1.80 4,672.80 1.60 4,153.60 2.00 5,192.00 1.60 4,153.60
720-01-D erosion control system, flexible channel liner (type d) 10,332      SQYD 1.80 18,597.60 1.65 17,047.80 2.00 20,664.00 1.65 17,047.80
722-02 project site laboratory (equipped) 1      EACH 50,000.00 50,000.00 26,000.00 26,000.00 80,000.00 80,000.00 22,000.00 22,000.00
726-01 bedding material 1,891.9    CUYD 110.00 208,109.00 58.00 109,730.20 75.00 141,892.50 150.00 283,785.00
727-01 mobilization lump      LUMP 2,385,000.00 2,385,000.00 3,246,000.00 3,246,000.00 3,000,000.00 3,000,000.00 3,170,000.00 3,170,000.00
729-16-C object marker assembly (type 3) 8      EACH 80.00 640.00 75.00 600.00 75.00 600.00 75.00 600.00
729-19-A dead end road installations(type a) 1      EACH 1,500.00 1,500.00 1,350.00 1,350.00 1,400.00 1,400.00 1,250.00 1,250.00
731-02 reflectorized raised pavement markers 6,188      EACH 5.50 34,034.00 6.50 40,222.00 5.50 34,034.00 6.50 40,222.00
732-02-A plastic pavement striping (solid line) (4" width) 62.828  MILE 2,500.00 157,070.00 2,200.00 138,221.60 2,500.00 157,070.00 2,200.00 138,221.60
732-02-C plastic pavement striping (solid line) (8" width) 1.186  MILE 5,500.00 6,523.00 8,500.00 10,081.00 5,000.00 5,930.00 8,500.00 10,081.00
732-02-E plastic pavement striping (solid line) (24" width) 0.179  MILE 15,500.00 2,774.50 18,000.00 3,222.00 17,000.00 3,043.00 18,000.00 3,222.00
732-03-A plastic pavement striping (broken line)(4" width) 29.876  MILE 850.00 25,394.60 1,000.00 29,876.00 800.00 23,900.80 1,000.00 29,876.00
732-04-A plastic pavement legends & symbols (arrow) 46      EACH 210.00 9,660.00 300.00 13,800.00 225.00 10,350.00 300.00 13,800.00
732-04-C plastic pavement legends & symbols (only) 23      EACH 250.00 5,750.00 300.00 6,900.00 250.00 5,750.00 300.00 6,900.00
732-04-D plastic pavement legends & symbols (rr crossing) 1      EACH 525.00 525.00 500.00 500.00 600.00 600.00 500.00 500.00
732-05-A removal of existing markings (water blasting) 14.732  MILE 6,000.00 88,392.00 3,500.00 51,562.00 5,800.00 85,445.60 3,500.00 51,562.00
735-01 mailboxes 3      EACH 21.00 63.00 10.00 30.00 50.00 150.00 257.56 772.68
735-02 mailbox supports (single) 3      EACH 150.00 450.00 150.00 450.00 200.00 600.00 372.04 1,116.12
736-01 trenching and backfilling 825      LNFT 5.50 4,537.50 5.00 4,125.00 6.00 4,950.00 5.00 4,125.00
736-04-A signal support (35' metal strain pole) 4      EACH 8,800.00 35,200.00 8,000.00 32,000.00 9,000.00 36,000.00 8,000.00 32,000.00
736-05-01 signal heads (1 section, r 12" led) 6      EACH 650.00 3,900.00 600.00 3,600.00 650.00 3,900.00 600.00 3,600.00
736-05-02 signal heads (1 section y 12" led) 4      EACH 650.00 2,600.00 600.00 2,400.00 650.00 2,600.00 600.00 2,400.00
736-06 signal service 1      EACH 1,650.00 1,650.00 1,500.00 1,500.00 1,700.00 1,700.00 1,500.00 1,500.00
736-08 signal controller 1      EACH 22,000.00 22,000.00 20,000.00 20,000.00 21,000.00 21,000.00 20,000.00 20,000.00
736-10-A underground junction box (type e) 5      EACH 550.00 2,750.00 500.00 2,500.00 600.00 3,000.00 500.00 2,500.00
736-10-B underground junction box (type h) 1      EACH 1,300.00 1,300.00 1,200.00 1,200.00 1,300.00 1,300.00 1,200.00 1,200.00
736-11-A conduit (2" pvc) 790      LNFT 9.00 7,110.00 8.00 6,320.00 10.00 7,900.00 8.00 6,320.00
736-11-B conduit (3" pvc) 35      LNFT 11.00 385.00 10.00 350.00 11.00 385.00 10.00 350.00
736-12-A conductor (3c, #6 awg, 600v, service) 335      LNFT 5.50 1,842.50 5.00 1,675.00 5.50 1,842.50 5.00 1,675.00
736-12-B conductor (6c, #14 awg, 600v) 170      LNFT 2.20 374.00 2.00 340.00 2.00 340.00 2.00 340.00
736-12-C conductor (10c, #14 awg, 600v) 1,450      LNFT 3.30 4,785.00 3.00 4,350.00 3.50 5,075.00 3.00 4,350.00
739-01 hydro-seeding 47.05   ACRE 1,000.00 47,050.00 850.00 39,992.50 950.00 44,697.50 850.00 39,992.50
739-01-A hydro-seeding (us forest service) 291.40   ACRE 1,000.00 291,400.00 960.00 279,744.00 950.00 276,830.00 960.00 279,744.00
740-01 construction layout lump      LUMP 300,000.00 300,000.00 350,000.00 350,000.00 250,000.00 250,000.00 369,000.00 369,000.00
740-02 utility oversight and coordination lump      LUMP 35,000.00 35,000.00 35,000.00 35,000.00 20,000.00 20,000.00 25,000.00 25,000.00
802-01 structural excavation 34.2    CUYD 33.00 1,128.60 150.00 5,130.00 50.00 1,710.00 25.00 855.00
804-01-B precast concrete piles (14") 3,110      LNFT 72.00 223,920.00 60.00 186,600.00 44.00 136,840.00 54.00 167,940.00
804-12 loading permanent piles 2      EACH 2,200.00 4,400.00 8,000.00 16,000.00 100.00 200.00 5,300.00 10,600.00
805-01-A class a concrete (pipe headwalls) 24.98   CUYD 1,500.00 37,470.00 1,235.00 30,850.30 1,800.00 44,964.00 1,500.00 37,470.00
805-01-B class a concrete (box culvert headwalls) 82.72   CUYD 1,300.00 107,536.00 1,235.00 102,159.20 1,900.00 157,168.00 1,500.00 124,080.00
805-01-F class a concrete (bents) 89.54   CUYD 1,100.00 98,494.00 970.00 86,853.80 950.00 85,063.00 700.00 62,678.00
805-03 class aa concrete 315.75   CUYD 650.00 205,237.50 740.00 233,655.00 600.00 189,450.00 765.00 241,548.75
805-12-E reinforced concrete box culverts (4'x 4') 609.0    LNFT 300.00 182,700.00 272.00 165,648.00 290.00 176,610.00 450.00 274,050.00
805-12-E-01 reinforced concrete box culverts (4'x 4')
(cast-in-place only)
260.0    LNFT 300.00 78,000.00 267.00 69,420.00 275.00 71,500.00 650.00 169,000.00
805-12-I-01 reinforced concrete box culverts (5'x 5')
(cast-in-place only)
580.0    LNFT 450.00 261,000.00 390.00 226,200.00 300.00 174,000.00 750.00 435,000.00
805-12-M reinforced concrete box culverts (6'x 6') 118.0    LNFT 515.00 60,770.00 435.00 51,330.00 600.00 70,800.00 750.00 88,500.00
805-12-M-01 reinforced concrete box culverts (6'x 6')
(cast-in-place only)
1,015.0    LNFT 515.00 522,725.00 430.00 436,450.00 525.00 532,875.00 950.00 964,250.00
805-12-Y reinforced concrete box culverts (2'x 2') 205.0    LNFT 270.00 55,350.00 350.00 71,750.00 470.00 96,350.00 300.00 61,500.00
805-12-Z reinforced concrete box culverts (3'x 3') 66.0    LNFT 560.00 36,960.00 640.00 42,240.00 750.00 49,500.00 350.00 23,100.00
805-12-Z-01 reinforced concrete box culverts (3'x 4') 43.0    LNFT 400.00 17,200.00 500.00 21,500.00 700.00 30,100.00 400.00 17,200.00
806-01 deformed reinforcing steel 84,638      LB 1.10 93,101.80 0.85 71,942.30 0.98 82,945.24 0.90 76,174.20
810-01 concrete railing (32" barrier) 360.00   LNFT 75.00 27,000.00 100.00 36,000.00 60.00 21,600.00 55.00 19,800.00
813-01 concrete approach slabs 728.88   SQYD 225.00 163,998.00 200.00 145,776.00 200.00 145,776.00 190.00 138,487.20
S-001 full depth sawcutting 10,463      LNFT 6.50 68,009.50 7.50 78,472.50 2.00 20,926.00 4.00 41,852.00
S-002 removal of s. p. no. 023-04-0017 transition road lump      LUMP 13,000.00 13,000.00 20,000.00 20,000.00 15,000.00 15,000.00 500.00 500.00
S-003 rumble strips (ground-in) 29.5    MILE 525.00 15,487.50 528.00 15,576.00 625.00 18,437.50 520.00 15,340.00
S-004 open graded friction course (low volume traffic
applications)
222      TON 130.00 28,860.00 134.00 29,748.00 150.00 33,300.00 185.00 41,070.00
S-101 retroreflective sheeting panels lump      LUMP 3,300.00 3,300.00 5,000.00 5,000.00 2,400.00 2,400.00 1,000.00 1,000.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       34,547,716.96   34,905,798.70   36,767,360.67   36,842,509.38
 NUMBER OF DAYS BID AT $4,200 PER DAY.       3,360,000.00   3,360,000.00   3,360,000.00   2,730,000.00
 TOTAL BID       37,907,716.96   38,265,798.70   40,127,360.67   39,572,509.38