| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - JAMES CONSTRUCTION GROUP LLC |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - AUSTIN BRIDGE & ROAD, LP |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
1,000,000.00 |
1,000,000.00 |
1,200,000.00 |
1,200,000.00 |
1,400,000.00 |
1,400,000.00 |
905,000.00 |
905,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
65,000.00 |
65,000.00 |
90,000.00 |
90,000.00 |
80,000.00 |
80,000.00 |
40,000.00 |
40,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
9   |
SQYD |
55.00 |
495.00 |
100.00 |
900.00 |
50.00 |
450.00 |
100.00 |
900.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
3,561.8 |
SQYD |
4.30 |
15,315.74 |
5.50 |
19,589.90 |
7.00 |
24,932.60 |
10.00 |
35,618.00 |
| 202-02-H |
removal of guard rail
|
780   |
LNFT |
5.50 |
4,290.00 |
3.00 |
2,340.00 |
11.00 |
8,580.00 |
10.00 |
7,800.00 |
| 202-02-I |
removal of paved shoulders
|
8,860.6 |
SQYD |
4.50 |
39,872.70 |
4.00 |
35,442.40 |
5.00 |
44,303.00 |
12.00 |
106,327.20 |
| 202-02-01 |
removal of 326 sq. ft. wood storage building (lt. of
sta. 220+00.00) |
1   |
EACH |
550.00 |
550.00 |
800.00 |
800.00 |
300.00 |
300.00 |
1,000.00 |
1,000.00 |
| 202-02-02 |
removal of 1,962 sq. ft. brick residence (lt. of sta.
222+27.21) (contains non-friable asbestos) |
1   |
EACH |
8,000.00 |
8,000.00 |
7,500.00 |
7,500.00 |
3,000.00 |
3,000.00 |
11,950.00 |
11,950.00 |
| 202-02-03 |
removal of 223 sq. ft. brick storage building (lt. of
sta. 222+47.21) (contains non-friable asbestos) |
1   |
EACH |
8,000.00 |
8,000.00 |
1,100.00 |
1,100.00 |
300.00 |
300.00 |
5,850.00 |
5,850.00 |
| 202-02-04 |
removal of 1,249 sq. ft. swimming pool (lt. of sta.
223+00.00) |
1   |
EACH |
2,000.00 |
2,000.00 |
2,300.00 |
2,300.00 |
800.00 |
800.00 |
3,750.00 |
3,750.00 |
| 202-02-05 |
removal of 30.0' x 28.0' wood residence (lt. of sta.
224+21.60) |
1   |
EACH |
2,600.00 |
2,600.00 |
2,600.00 |
2,600.00 |
700.00 |
700.00 |
1,000.00 |
1,000.00 |
| 202-02-06 |
removal of 16.2' x 11.9' wood storage building (lt. of
sta. 225+29.36) |
1   |
EACH |
2,700.00 |
2,700.00 |
500.00 |
500.00 |
300.00 |
300.00 |
200.00 |
200.00 |
| 202-02-07 |
removal of 2,481 sq. ft. wood residence (lt. of sta.
227+08.31) |
1   |
EACH |
5,500.00 |
5,500.00 |
7,600.00 |
7,600.00 |
2,500.00 |
2,500.00 |
7,400.00 |
7,400.00 |
| 202-02-08 |
removal of 572 sq. ft. mobile home (lt. of sta.
228+15.32) |
1   |
EACH |
1,100.00 |
1,100.00 |
100.00 |
100.00 |
300.00 |
300.00 |
1,500.00 |
1,500.00 |
| 202-02-09 |
removal of 62.4' x 20.0' metal barn (lt.of sta.
228+24.42) |
1   |
EACH |
7,700.00 |
7,700.00 |
2,300.00 |
2,300.00 |
700.00 |
700.00 |
1,000.00 |
1,000.00 |
| 202-02-10 |
removal of 76.6' x 30.5' mobile home (lt. of sta.
229+46.67) |
1   |
EACH |
2,750.00 |
2,750.00 |
1,400.00 |
1,400.00 |
300.00 |
300.00 |
500.00 |
500.00 |
| 202-02-11 |
removal of 25.5' x 12.0' storage building (lt. of sta.
228+13.67) |
1   |
EACH |
1,100.00 |
1,100.00 |
800.00 |
800.00 |
300.00 |
300.00 |
250.00 |
250.00 |
| 202-02-12 |
removal of 17.6' x 11.2' wood building (lt. of sta.
266+92.32) |
1   |
EACH |
550.00 |
550.00 |
500.00 |
500.00 |
1,200.00 |
1,200.00 |
600.00 |
600.00 |
| 202-02-13 |
removal of 160 sq. ft. wood building (lt. of sta.
287+50.80) |
1   |
EACH |
2,750.00 |
2,750.00 |
400.00 |
400.00 |
1,200.00 |
1,200.00 |
500.00 |
500.00 |
| 202-02-14 |
removal of 1,454 sq. ft. wood residence (lt. of sta.
287+91.89) |
1   |
EACH |
2,200.00 |
2,200.00 |
4,450.00 |
4,450.00 |
3,600.00 |
3,600.00 |
4,400.00 |
4,400.00 |
| 202-02-15 |
removal of 72.1' x 13.5' mobile home (lt. of sta.
288+04.46) |
1   |
EACH |
1,100.00 |
1,100.00 |
100.00 |
100.00 |
300.00 |
300.00 |
500.00 |
500.00 |
| 202-02-16 |
removal of 856 sq. ft. wood building (lt. of sta.
288+08.15) |
1   |
EACH |
1,100.00 |
1,100.00 |
2,000.00 |
2,000.00 |
1,200.00 |
1,200.00 |
1,000.00 |
1,000.00 |
| 202-02-17 |
removal of 2,595 sq. ft. brick residence (lt. of sta.
288+39.39) (contains friable asbestos) |
1   |
EACH |
8,800.00 |
8,800.00 |
10,000.00 |
10,000.00 |
1,800.00 |
1,800.00 |
14,150.00 |
14,150.00 |
| 202-02-18 |
removal of 2,017 sq. ft. metal building (lt. of sta.
288+66.20) |
1   |
EACH |
2,750.00 |
2,750.00 |
3,700.00 |
3,700.00 |
3,600.00 |
3,600.00 |
6,100.00 |
6,100.00 |
| 202-02-19 |
removal of 638 sq. ft. wood building (lt. of sta.
295+30.00) |
1   |
EACH |
1,100.00 |
1,100.00 |
1,600.00 |
1,600.00 |
700.00 |
700.00 |
1,900.00 |
1,900.00 |
| 202-02-20 |
removal of 960.5 sq. ft. wood residence (lt. of sta.
296+13.14) (contains non-friable asbestos) |
1   |
EACH |
5,500.00 |
5,500.00 |
3,200.00 |
3,200.00 |
1,500.00 |
1,500.00 |
7,950.00 |
7,950.00 |
| 202-02-21 |
removal of 35.0' x 13.7' wood shed (rt. of sta.
15+78.43-la 472) |
1   |
EACH |
220.00 |
220.00 |
1,200.00 |
1,200.00 |
700.00 |
700.00 |
1,400.00 |
1,400.00 |
| 202-02-22 |
removal of 16.2' x 10.0' metal building (rt. of sta.
15+91.39-la 472) |
1   |
EACH |
2,200.00 |
2,200.00 |
300.00 |
300.00 |
700.00 |
700.00 |
100.00 |
100.00 |
| 202-02-23 |
removal of 31.7' x 24.0' building (lt. of sta.
17+46.33-la 472) |
1   |
EACH |
8,800.00 |
8,800.00 |
1,850.00 |
1,850.00 |
3,600.00 |
3,600.00 |
2,700.00 |
2,700.00 |
| 202-02-24 |
removal of 50.1' x 28.2' wood residence (lt. of sta.
731+24.05) (contains non-friable asbestos) |
1   |
EACH |
220.00 |
220.00 |
4,600.00 |
4,600.00 |
1,800.00 |
1,800.00 |
9,250.00 |
9,250.00 |
| 202-02-25 |
removal of 192 sq. ft. metal building (lt. of sta.
731+25.00) |
1   |
EACH |
220.00 |
220.00 |
400.00 |
400.00 |
700.00 |
700.00 |
600.00 |
600.00 |
| 202-02-26 |
removal of 192 sq. ft. metal building (lt. of sta.
731+65.00) |
1   |
EACH |
220.00 |
220.00 |
400.00 |
400.00 |
700.00 |
700.00 |
600.00 |
600.00 |
| 202-02-27 |
removal of 189 sq. ft. metal building (lt. of sta.
732+05.00) |
1   |
EACH |
220.00 |
220.00 |
400.00 |
400.00 |
700.00 |
700.00 |
600.00 |
600.00 |
| 202-02-28 |
removal of 373 sq. ft. metal building (lt. of sta.
732+10.00) |
1   |
EACH |
220.00 |
220.00 |
700.00 |
700.00 |
2,400.00 |
2,400.00 |
200.00 |
200.00 |
| 202-02-29 |
removal of 1,025 sq. ft. wood building (lt. of sta.
16+00.00-left turn military road) |
1   |
EACH |
2,750.00 |
2,750.00 |
2,500.00 |
2,500.00 |
1,800.00 |
1,800.00 |
3,100.00 |
3,100.00 |
| 202-02-30 |
removal of 47' x 1' concrete retaining wall (rt. of
sta. 375+25.87) |
1   |
EACH |
550.00 |
550.00 |
150.00 |
150.00 |
2,500.00 |
2,500.00 |
1,000.00 |
1,000.00 |
| 202-02-31 |
removal of propane tank (lt. of sta. 732+42.82)
|
1   |
EACH |
2,750.00 |
2,750.00 |
1,650.00 |
1,650.00 |
1,000.00 |
1,000.00 |
100.00 |
100.00 |
| 202-03-01 |
relocation of 12' x 6.5' cattle guard (lt. of sta.
735+00.00) |
1   |
EACH |
5,500.00 |
5,500.00 |
3,600.00 |
3,600.00 |
5,000.00 |
5,000.00 |
2,000.00 |
2,000.00 |
| 202-03-02 |
relocation of 21' x 5' cattle guard (lt. of sta.
738+78.44) |
1   |
EACH |
5,500.00 |
5,500.00 |
3,600.00 |
3,600.00 |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
| 203-01 |
general excavation
|
957,773   |
CUYD |
3.40 |
3,256,428.20 |
2.60 |
2,490,209.80 |
2.80 |
2,681,764.40 |
3.34 |
3,198,961.82 |
| 203-02 |
drainage excavation
|
13,742   |
CUYD |
5.00 |
68,710.00 |
15.00 |
206,130.00 |
9.00 |
123,678.00 |
8.00 |
109,936.00 |
| 203-03 |
embankment
|
880,508   |
CUYD |
4.50 |
3,962,286.00 |
3.50 |
3,081,778.00 |
6.25 |
5,503,175.00 |
5.00 |
4,402,540.00 |
| 203-04-A |
nonplastic embankment (stone)
|
237   |
CUYD |
115.00 |
27,255.00 |
80.00 |
18,960.00 |
190.00 |
45,030.00 |
100.00 |
23,700.00 |
| 203-08 |
geotextile fabric
|
1,520   |
SQYD |
1.25 |
1,900.00 |
3.00 |
4,560.00 |
1.60 |
2,432.00 |
4.41 |
6,703.20 |
| 204-02 |
temporary hay or straw bales
|
448   |
EACH |
16.00 |
7,168.00 |
13.50 |
6,048.00 |
20.00 |
8,960.00 |
8.00 |
3,584.00 |
| 204-03 |
temporary slope drains
|
586   |
LNFT |
24.00 |
14,064.00 |
12.00 |
7,032.00 |
15.00 |
8,790.00 |
10.00 |
5,860.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
475   |
EACH |
110.00 |
52,250.00 |
110.00 |
52,250.00 |
150.00 |
71,250.00 |
90.00 |
42,750.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
557   |
EACH |
600.00 |
334,200.00 |
500.00 |
278,500.00 |
430.00 |
239,510.00 |
523.88 |
291,801.16 |
| 204-06 |
temporary silt fencing
|
107,898   |
LNFT |
2.25 |
242,770.50 |
2.20 |
237,375.60 |
1.60 |
172,636.80 |
1.35 |
145,662.30 |
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
4,100.00 |
8,200.00 |
4,000.00 |
8,000.00 |
2,400.00 |
4,800.00 |
1,926.10 |
3,852.20 |
| 302-02-A-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
387,580.8 |
SQYD |
9.15 |
3,546,364.32 |
9.50 |
3,682,017.60 |
9.50 |
3,682,017.60 |
11.00 |
4,263,388.80 |
| 302-02-C-01 |
class ii base course (8" thick)(soil cement)
|
343,844.5 |
SQYD |
9.25 |
3,180,561.63 |
9.10 |
3,128,984.95 |
9.25 |
3,180,561.63 |
8.50 |
2,922,678.25 |
| 304-01 |
lime
|
2,919.37 |
TON |
1.00 |
2,919.37 |
160.00 |
467,099.20 |
50.00 |
145,968.50 |
40.00 |
116,774.80 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
205,952   |
SQYD |
1.00 |
205,952.00 |
1.50 |
308,928.00 |
0.35 |
72,083.20 |
0.50 |
102,976.00 |
| 401-01 |
aggregate surface course (net section)(shoulders)
|
9,853.0 |
CUYD |
72.00 |
709,416.00 |
90.00 |
886,770.00 |
70.00 |
689,710.00 |
80.00 |
788,240.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement)(driveways) |
459   |
CUYD |
78.00 |
35,802.00 |
85.00 |
39,015.00 |
95.00 |
43,605.00 |
90.00 |
41,310.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
10,000.0 |
CUYD |
30.00 |
300,000.00 |
112.00 |
1,120,000.00 |
20.00 |
200,000.00 |
20.00 |
200,000.00 |
| 502-01 |
superpave asphaltic concrete
|
74,090.9 |
TON |
75.00 |
5,556,817.50 |
77.00 |
5,704,999.30 |
82.00 |
6,075,453.80 |
84.00 |
6,223,635.60 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
12,862.2 |
TON |
93.00 |
1,196,184.60 |
97.00 |
1,247,633.40 |
95.00 |
1,221,909.00 |
90.00 |
1,157,598.00 |
| 701-01-G |
cross drain pipe (18" rcp/pcp)
|
1,924   |
LNFT |
60.00 |
115,440.00 |
57.00 |
109,668.00 |
72.00 |
138,528.00 |
50.00 |
96,200.00 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
3,810   |
LNFT |
75.00 |
285,750.00 |
65.00 |
247,650.00 |
90.00 |
342,900.00 |
65.00 |
247,650.00 |
| 701-01-K |
cross drain pipe (30" rcp/pcp)
|
1,208   |
LNFT |
95.00 |
114,760.00 |
98.00 |
118,384.00 |
100.00 |
120,800.00 |
80.00 |
96,640.00 |
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
120   |
LNFT |
120.00 |
14,400.00 |
110.00 |
13,200.00 |
125.00 |
15,000.00 |
95.00 |
11,400.00 |
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
1,544   |
LNFT |
180.00 |
277,920.00 |
137.00 |
211,528.00 |
155.00 |
239,320.00 |
125.00 |
193,000.00 |
| 701-01-N-01 |
cross drain pipe (42" rcp)(class iv concrete)
|
398   |
LNFT |
215.00 |
85,570.00 |
162.00 |
64,476.00 |
130.00 |
51,740.00 |
200.00 |
79,600.00 |
| 701-01-O |
cross drain pipe (48" rcp/pcp)
|
624   |
LNFT |
220.00 |
137,280.00 |
200.00 |
124,800.00 |
185.00 |
115,440.00 |
180.00 |
112,320.00 |
| 701-01-P |
cross drain pipe (54" rcp/pcp)
|
610   |
LNFT |
250.00 |
152,500.00 |
200.00 |
122,000.00 |
225.00 |
137,250.00 |
225.00 |
137,250.00 |
| 701-02-D |
cross drain pipe arch (24" equiv. rcpa)
|
270   |
LNFT |
80.00 |
21,600.00 |
101.00 |
27,270.00 |
115.00 |
31,050.00 |
100.00 |
27,000.00 |
| 701-02-G |
cross drain pipe arch (42" equiv. rcpa)
|
568   |
LNFT |
190.00 |
107,920.00 |
183.00 |
103,944.00 |
175.00 |
99,400.00 |
175.00 |
99,400.00 |
| 701-02-H |
cross drain pipe arch (48" equiv. rcpa)
|
186   |
LNFT |
225.00 |
41,850.00 |
204.00 |
37,944.00 |
200.00 |
37,200.00 |
200.00 |
37,200.00 |
| 701-05-G |
side drain pipe (18")
|
1,086   |
LNFT |
62.00 |
67,332.00 |
38.00 |
41,268.00 |
75.00 |
81,450.00 |
50.00 |
54,300.00 |
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
179   |
LNFT |
62.00 |
11,098.00 |
45.00 |
8,055.00 |
200.00 |
35,800.00 |
50.00 |
8,950.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
178   |
LNFT |
200.00 |
35,600.00 |
49.00 |
8,722.00 |
95.00 |
16,910.00 |
150.00 |
26,700.00 |
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
12   |
LNFT |
275.00 |
3,300.00 |
86.00 |
1,032.00 |
165.00 |
1,980.00 |
200.00 |
2,400.00 |
| 701-15 |
concrete collar
|
1   |
EACH |
1,200.00 |
1,200.00 |
850.00 |
850.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
| 702-02-B |
manholes (r-cb-11)
|
2   |
EACH |
5,000.00 |
10,000.00 |
4,335.00 |
8,670.00 |
3,000.00 |
6,000.00 |
5,000.00 |
10,000.00 |
| 702-03-A |
catch basins (cb-01)
|
49   |
EACH |
3,600.00 |
176,400.00 |
4,090.00 |
200,410.00 |
3,000.00 |
147,000.00 |
2,700.00 |
132,300.00 |
| 702-03-B |
catch basins (cb-02)
|
17   |
EACH |
4,500.00 |
76,500.00 |
5,625.00 |
95,625.00 |
4,500.00 |
76,500.00 |
4,000.00 |
68,000.00 |
| 702-05-A |
cross drain end treatment (1 barrel, 24" rcp/pcp)
|
29   |
EACH |
1,800.00 |
52,200.00 |
800.00 |
23,200.00 |
1,650.00 |
47,850.00 |
2,000.00 |
58,000.00 |
| 702-05-B |
cross drain end treatment (1 barrel, 30" rcp/pcp)
|
9   |
EACH |
3,000.00 |
27,000.00 |
1,100.00 |
9,900.00 |
1,800.00 |
16,200.00 |
2,250.00 |
20,250.00 |
| 702-05-C |
cross drain end treatment (1 barrel, 36" rcp/pcp)
|
2   |
EACH |
3,400.00 |
6,800.00 |
1,300.00 |
2,600.00 |
3,300.00 |
6,600.00 |
2,500.00 |
5,000.00 |
| 702-05-D |
cross drain end treatment (1 barrel, 42" rcp/pcp)
|
11   |
EACH |
4,500.00 |
49,500.00 |
1,900.00 |
20,900.00 |
3,450.00 |
37,950.00 |
2,750.00 |
30,250.00 |
| 702-05-E |
cross drain end treatment (1 barrel, 48" rcp/pcp)
|
6   |
EACH |
5,300.00 |
31,800.00 |
2,870.00 |
17,220.00 |
3,600.00 |
21,600.00 |
3,000.00 |
18,000.00 |
| 702-05-F |
cross drain end treatment (1 barrel, 54" rcp/pcp)
|
4   |
EACH |
6,500.00 |
26,000.00 |
3,300.00 |
13,200.00 |
7,200.00 |
28,800.00 |
3,250.00 |
13,000.00 |
| 702-05-G |
cross drain end treatment (1 barrel, 24" equiv. rcpa)
|
2   |
EACH |
4,000.00 |
8,000.00 |
770.00 |
1,540.00 |
1,800.00 |
3,600.00 |
2,000.00 |
4,000.00 |
| 702-05-H |
cross drain end treatment (1 barrel, 42" equiv. rcpa)
|
4   |
EACH |
7,700.00 |
30,800.00 |
1,600.00 |
6,400.00 |
3,600.00 |
14,400.00 |
2,750.00 |
11,000.00 |
| 702-05-I |
cross drain end treatment (1 barrel, 48" equiv. rcpa)
|
1   |
EACH |
9,000.00 |
9,000.00 |
2,375.00 |
2,375.00 |
7,200.00 |
7,200.00 |
3,000.00 |
3,000.00 |
| 702-07-A |
cross drain safety end (type 1)
|
3   |
EACH |
3,500.00 |
10,500.00 |
2,375.00 |
7,125.00 |
2,200.00 |
6,600.00 |
2,500.00 |
7,500.00 |
| 704-03 |
blocked out guard rail
|
1,800.5 |
LNFT |
19.00 |
34,209.50 |
17.50 |
31,508.75 |
18.00 |
32,409.00 |
17.20 |
30,968.60 |
| 704-06 |
guard rail anchor sections (trailing end)
|
12.5 |
LNFT |
77.00 |
962.50 |
70.00 |
875.00 |
50.00 |
625.00 |
45.00 |
562.50 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
55.00 |
11,000.00 |
50.00 |
10,000.00 |
55.00 |
11,000.00 |
52.00 |
10,400.00 |
| 704-11-A |
guard rail end treatment (flared)
|
9   |
EACH |
2,000.00 |
18,000.00 |
1,850.00 |
16,650.00 |
2,100.00 |
18,900.00 |
1,925.00 |
17,325.00 |
| 705-01 |
barbed wire fence
|
12,625   |
LNFT |
5.50 |
69,437.50 |
5.20 |
65,650.00 |
5.50 |
69,437.50 |
5.20 |
65,650.00 |
| 705-04 |
single swinging driveway gate
|
1   |
EACH |
550.00 |
550.00 |
350.00 |
350.00 |
600.00 |
600.00 |
350.00 |
350.00 |
| 706-03-C |
incidental concrete paving (6" thick)
|
956.3 |
SQYD |
110.00 |
105,193.00 |
70.00 |
66,941.00 |
75.00 |
71,722.50 |
70.00 |
66,941.00 |
| 708-01 |
right-of-way monument
|
219   |
EACH |
105.00 |
22,995.00 |
140.00 |
30,660.00 |
300.00 |
65,700.00 |
200.00 |
43,800.00 |
| 708-02 |
right-of-way monument witness post
|
219   |
EACH |
105.00 |
22,995.00 |
50.00 |
10,950.00 |
300.00 |
65,700.00 |
200.00 |
43,800.00 |
| 711-01-D |
riprap (55 lb, 18" thick)
|
25,588   |
SQYD |
60.00 |
1,535,280.00 |
56.00 |
1,432,928.00 |
60.00 |
1,535,280.00 |
65.00 |
1,663,220.00 |
| 711-04 |
geotextile fabric
|
30,521   |
SQYD |
3.50 |
106,823.50 |
6.00 |
183,126.00 |
1.75 |
53,411.75 |
1.50 |
45,781.50 |
| 712-02 |
sacked concrete revetment
|
177   |
SQYD |
165.00 |
29,205.00 |
150.00 |
26,550.00 |
200.00 |
35,400.00 |
75.00 |
13,275.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
250,000.00 |
250,000.00 |
68,000.00 |
68,000.00 |
240,000.00 |
240,000.00 |
195,150.00 |
195,150.00 |
| 713-03-B-01 |
temporary pavement markings (broken line)(4" width)
(10' length) (type 1 removable) |
0.426 |
MILE |
5,500.00 |
2,343.00 |
10,000.00 |
4,260.00 |
5,500.00 |
2,343.00 |
10,000.00 |
4,260.00 |
| 713-04-E-01 |
temporary pavement markings (solid line)(24" width)
(type 1 removable) |
0.134 |
MILE |
70,000.00 |
9,380.00 |
35,000.00 |
4,690.00 |
71,000.00 |
9,514.00 |
35,000.00 |
4,690.00 |
| 715-01 |
topsoil
|
18,124   |
CUYD |
12.00 |
217,488.00 |
8.00 |
144,992.00 |
18.00 |
326,232.00 |
3.00 |
54,372.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
77,245   |
SQYD |
1.00 |
77,245.00 |
1.00 |
77,245.00 |
1.15 |
88,831.75 |
1.00 |
77,245.00 |
| 720-01-B |
erosion control system, slope protection (type b)
|
48,460   |
SQYD |
1.00 |
48,460.00 |
1.00 |
48,460.00 |
1.15 |
55,729.00 |
1.00 |
48,460.00 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
2,596   |
SQYD |
1.80 |
4,672.80 |
1.60 |
4,153.60 |
2.00 |
5,192.00 |
1.60 |
4,153.60 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
10,332   |
SQYD |
1.80 |
18,597.60 |
1.65 |
17,047.80 |
2.00 |
20,664.00 |
1.65 |
17,047.80 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
50,000.00 |
50,000.00 |
26,000.00 |
26,000.00 |
80,000.00 |
80,000.00 |
22,000.00 |
22,000.00 |
| 726-01 |
bedding material
|
1,891.9 |
CUYD |
110.00 |
208,109.00 |
58.00 |
109,730.20 |
75.00 |
141,892.50 |
150.00 |
283,785.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
2,385,000.00 |
2,385,000.00 |
3,246,000.00 |
3,246,000.00 |
3,000,000.00 |
3,000,000.00 |
3,170,000.00 |
3,170,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
80.00 |
640.00 |
75.00 |
600.00 |
75.00 |
600.00 |
75.00 |
600.00 |
| 729-19-A |
dead end road installations(type a)
|
1   |
EACH |
1,500.00 |
1,500.00 |
1,350.00 |
1,350.00 |
1,400.00 |
1,400.00 |
1,250.00 |
1,250.00 |
| 731-02 |
reflectorized raised pavement markers
|
6,188   |
EACH |
5.50 |
34,034.00 |
6.50 |
40,222.00 |
5.50 |
34,034.00 |
6.50 |
40,222.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
62.828 |
MILE |
2,500.00 |
157,070.00 |
2,200.00 |
138,221.60 |
2,500.00 |
157,070.00 |
2,200.00 |
138,221.60 |
| 732-02-C |
plastic pavement striping (solid line) (8" width)
|
1.186 |
MILE |
5,500.00 |
6,523.00 |
8,500.00 |
10,081.00 |
5,000.00 |
5,930.00 |
8,500.00 |
10,081.00 |
| 732-02-E |
plastic pavement striping (solid line) (24" width)
|
0.179 |
MILE |
15,500.00 |
2,774.50 |
18,000.00 |
3,222.00 |
17,000.00 |
3,043.00 |
18,000.00 |
3,222.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
29.876 |
MILE |
850.00 |
25,394.60 |
1,000.00 |
29,876.00 |
800.00 |
23,900.80 |
1,000.00 |
29,876.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
46   |
EACH |
210.00 |
9,660.00 |
300.00 |
13,800.00 |
225.00 |
10,350.00 |
300.00 |
13,800.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
23   |
EACH |
250.00 |
5,750.00 |
300.00 |
6,900.00 |
250.00 |
5,750.00 |
300.00 |
6,900.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
1   |
EACH |
525.00 |
525.00 |
500.00 |
500.00 |
600.00 |
600.00 |
500.00 |
500.00 |
| 732-05-A |
removal of existing markings (water blasting)
|
14.732 |
MILE |
6,000.00 |
88,392.00 |
3,500.00 |
51,562.00 |
5,800.00 |
85,445.60 |
3,500.00 |
51,562.00 |
| 735-01 |
mailboxes
|
3   |
EACH |
21.00 |
63.00 |
10.00 |
30.00 |
50.00 |
150.00 |
257.56 |
772.68 |
| 735-02 |
mailbox supports (single)
|
3   |
EACH |
150.00 |
450.00 |
150.00 |
450.00 |
200.00 |
600.00 |
372.04 |
1,116.12 |
| 736-01 |
trenching and backfilling
|
825   |
LNFT |
5.50 |
4,537.50 |
5.00 |
4,125.00 |
6.00 |
4,950.00 |
5.00 |
4,125.00 |
| 736-04-A |
signal support (35' metal strain pole)
|
4   |
EACH |
8,800.00 |
35,200.00 |
8,000.00 |
32,000.00 |
9,000.00 |
36,000.00 |
8,000.00 |
32,000.00 |
| 736-05-01 |
signal heads (1 section, r 12" led)
|
6   |
EACH |
650.00 |
3,900.00 |
600.00 |
3,600.00 |
650.00 |
3,900.00 |
600.00 |
3,600.00 |
| 736-05-02 |
signal heads (1 section y 12" led)
|
4   |
EACH |
650.00 |
2,600.00 |
600.00 |
2,400.00 |
650.00 |
2,600.00 |
600.00 |
2,400.00 |
| 736-06 |
signal service
|
1   |
EACH |
1,650.00 |
1,650.00 |
1,500.00 |
1,500.00 |
1,700.00 |
1,700.00 |
1,500.00 |
1,500.00 |
| 736-08 |
signal controller
|
1   |
EACH |
22,000.00 |
22,000.00 |
20,000.00 |
20,000.00 |
21,000.00 |
21,000.00 |
20,000.00 |
20,000.00 |
| 736-10-A |
underground junction box (type e)
|
5   |
EACH |
550.00 |
2,750.00 |
500.00 |
2,500.00 |
600.00 |
3,000.00 |
500.00 |
2,500.00 |
| 736-10-B |
underground junction box (type h)
|
1   |
EACH |
1,300.00 |
1,300.00 |
1,200.00 |
1,200.00 |
1,300.00 |
1,300.00 |
1,200.00 |
1,200.00 |
| 736-11-A |
conduit (2" pvc)
|
790   |
LNFT |
9.00 |
7,110.00 |
8.00 |
6,320.00 |
10.00 |
7,900.00 |
8.00 |
6,320.00 |
| 736-11-B |
conduit (3" pvc)
|
35   |
LNFT |
11.00 |
385.00 |
10.00 |
350.00 |
11.00 |
385.00 |
10.00 |
350.00 |
| 736-12-A |
conductor (3c, #6 awg, 600v, service)
|
335   |
LNFT |
5.50 |
1,842.50 |
5.00 |
1,675.00 |
5.50 |
1,842.50 |
5.00 |
1,675.00 |
| 736-12-B |
conductor (6c, #14 awg, 600v)
|
170   |
LNFT |
2.20 |
374.00 |
2.00 |
340.00 |
2.00 |
340.00 |
2.00 |
340.00 |
| 736-12-C |
conductor (10c, #14 awg, 600v)
|
1,450   |
LNFT |
3.30 |
4,785.00 |
3.00 |
4,350.00 |
3.50 |
5,075.00 |
3.00 |
4,350.00 |
| 739-01 |
hydro-seeding
|
47.05 |
ACRE |
1,000.00 |
47,050.00 |
850.00 |
39,992.50 |
950.00 |
44,697.50 |
850.00 |
39,992.50 |
| 739-01-A |
hydro-seeding (us forest service)
|
291.40 |
ACRE |
1,000.00 |
291,400.00 |
960.00 |
279,744.00 |
950.00 |
276,830.00 |
960.00 |
279,744.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
300,000.00 |
300,000.00 |
350,000.00 |
350,000.00 |
250,000.00 |
250,000.00 |
369,000.00 |
369,000.00 |
| 740-02 |
utility oversight and coordination
|
lump |
LUMP |
35,000.00 |
35,000.00 |
35,000.00 |
35,000.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
| 802-01 |
structural excavation
|
34.2 |
CUYD |
33.00 |
1,128.60 |
150.00 |
5,130.00 |
50.00 |
1,710.00 |
25.00 |
855.00 |
| 804-01-B |
precast concrete piles (14")
|
3,110   |
LNFT |
72.00 |
223,920.00 |
60.00 |
186,600.00 |
44.00 |
136,840.00 |
54.00 |
167,940.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
2,200.00 |
4,400.00 |
8,000.00 |
16,000.00 |
100.00 |
200.00 |
5,300.00 |
10,600.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
24.98 |
CUYD |
1,500.00 |
37,470.00 |
1,235.00 |
30,850.30 |
1,800.00 |
44,964.00 |
1,500.00 |
37,470.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
82.72 |
CUYD |
1,300.00 |
107,536.00 |
1,235.00 |
102,159.20 |
1,900.00 |
157,168.00 |
1,500.00 |
124,080.00 |
| 805-01-F |
class a concrete (bents)
|
89.54 |
CUYD |
1,100.00 |
98,494.00 |
970.00 |
86,853.80 |
950.00 |
85,063.00 |
700.00 |
62,678.00 |
| 805-03 |
class aa concrete
|
315.75 |
CUYD |
650.00 |
205,237.50 |
740.00 |
233,655.00 |
600.00 |
189,450.00 |
765.00 |
241,548.75 |
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
609.0 |
LNFT |
300.00 |
182,700.00 |
272.00 |
165,648.00 |
290.00 |
176,610.00 |
450.00 |
274,050.00 |
| 805-12-E-01 |
reinforced concrete box culverts (4'x 4')
(cast-in-place only) |
260.0 |
LNFT |
300.00 |
78,000.00 |
267.00 |
69,420.00 |
275.00 |
71,500.00 |
650.00 |
169,000.00 |
| 805-12-I-01 |
reinforced concrete box culverts (5'x 5')
(cast-in-place only) |
580.0 |
LNFT |
450.00 |
261,000.00 |
390.00 |
226,200.00 |
300.00 |
174,000.00 |
750.00 |
435,000.00 |
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
118.0 |
LNFT |
515.00 |
60,770.00 |
435.00 |
51,330.00 |
600.00 |
70,800.00 |
750.00 |
88,500.00 |
| 805-12-M-01 |
reinforced concrete box culverts (6'x 6')
(cast-in-place only) |
1,015.0 |
LNFT |
515.00 |
522,725.00 |
430.00 |
436,450.00 |
525.00 |
532,875.00 |
950.00 |
964,250.00 |
| 805-12-Y |
reinforced concrete box culverts (2'x 2')
|
205.0 |
LNFT |
270.00 |
55,350.00 |
350.00 |
71,750.00 |
470.00 |
96,350.00 |
300.00 |
61,500.00 |
| 805-12-Z |
reinforced concrete box culverts (3'x 3')
|
66.0 |
LNFT |
560.00 |
36,960.00 |
640.00 |
42,240.00 |
750.00 |
49,500.00 |
350.00 |
23,100.00 |
| 805-12-Z-01 |
reinforced concrete box culverts (3'x 4')
|
43.0 |
LNFT |
400.00 |
17,200.00 |
500.00 |
21,500.00 |
700.00 |
30,100.00 |
400.00 |
17,200.00 |
| 806-01 |
deformed reinforcing steel
|
84,638   |
LB |
1.10 |
93,101.80 |
0.85 |
71,942.30 |
0.98 |
82,945.24 |
0.90 |
76,174.20 |
| 810-01 |
concrete railing (32" barrier)
|
360.00 |
LNFT |
75.00 |
27,000.00 |
100.00 |
36,000.00 |
60.00 |
21,600.00 |
55.00 |
19,800.00 |
| 813-01 |
concrete approach slabs
|
728.88 |
SQYD |
225.00 |
163,998.00 |
200.00 |
145,776.00 |
200.00 |
145,776.00 |
190.00 |
138,487.20 |
| S-001 |
full depth sawcutting
|
10,463   |
LNFT |
6.50 |
68,009.50 |
7.50 |
78,472.50 |
2.00 |
20,926.00 |
4.00 |
41,852.00 |
| S-002 |
removal of s. p. no. 023-04-0017 transition road
|
lump |
LUMP |
13,000.00 |
13,000.00 |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
500.00 |
500.00 |
| S-003 |
rumble strips (ground-in)
|
29.5 |
MILE |
525.00 |
15,487.50 |
528.00 |
15,576.00 |
625.00 |
18,437.50 |
520.00 |
15,340.00 |
| S-004 |
open graded friction course (low volume traffic
applications) |
222   |
TON |
130.00 |
28,860.00 |
134.00 |
29,748.00 |
150.00 |
33,300.00 |
185.00 |
41,070.00 |
| S-101 |
retroreflective sheeting panels
|
lump |
LUMP |
3,300.00 |
3,300.00 |
5,000.00 |
5,000.00 |
2,400.00 |
2,400.00 |
1,000.00 |
1,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
34,547,716.96 |
|
34,905,798.70 |
|
36,767,360.67 |
|
36,842,509.38 |
| | NUMBER OF DAYS BID AT $4,200 PER DAY. |
|
|
|
3,360,000.00 |
|
3,360,000.00 |
|
3,360,000.00 |
|
2,730,000.00 |
| | TOTAL BID |
|
|
|
37,907,716.96 |
|
38,265,798.70 |
|
40,127,360.67 |
|
39,572,509.38 |
|