| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - JAMES CONSTRUCTION GROUP LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
- 3 - KIEWIT LOUISIANA CO |
O.L. SIMS CO. INC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
800,000.00 |
800,000.00 |
200,000.00 |
200,000.00 |
200,000.00 |
200,000.00 |
400,000.00 |
400,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
20,000.00 |
20,000.00 |
30,000.00 |
30,000.00 |
35,000.00 |
35,000.00 |
31,590.00 |
31,590.00 |
| 202-02-A-01 |
removal of bridge (sta. 136+48.95; 28' x 1462' steel
girder bridge) |
1   |
EACH |
300,000.00 |
300,000.00 |
1,000,000.00 |
1,000,000.00 |
553,000.00 |
553,000.00 |
212,026.00 |
212,026.00 |
| 202-02-A-02 |
removal of bridge (sta. 136+55.11; 24' x 1453' steel
truss bridge) |
1   |
EACH |
540,000.00 |
540,000.00 |
2,500,000.00 |
2,500,000.00 |
553,000.00 |
553,000.00 |
339,361.00 |
339,361.00 |
| 202-02-A-03 |
removal of bridge (sta. 158+67.22; 28' x 540' steel
girder bridge) |
1   |
EACH |
100,000.00 |
100,000.00 |
600,000.00 |
600,000.00 |
430,000.00 |
430,000.00 |
77,145.00 |
77,145.00 |
| 202-02-A-04 |
removal of bridge (sta. 158+43.11; 24' x 540' concrete
deck girder bridge) |
1   |
EACH |
190,000.00 |
190,000.00 |
600,000.00 |
600,000.00 |
430,000.00 |
430,000.00 |
87,260.00 |
87,260.00 |
| 202-02-D |
removal of concrete walks & drives
|
1,595   |
SQYD |
8.00 |
12,760.00 |
14.00 |
22,330.00 |
38.00 |
60,610.00 |
16.38 |
26,126.10 |
| 202-02-G |
removal of surfacing & stabilized base
|
31,331.2 |
SQYD |
4.50 |
140,990.40 |
5.00 |
156,656.00 |
26.00 |
814,611.20 |
11.70 |
366,575.04 |
| 202-02-H |
removal of guard rail
|
1,000   |
LNFT |
6.00 |
6,000.00 |
4.40 |
4,400.00 |
17.00 |
17,000.00 |
4.70 |
4,700.00 |
| 202-02-01 |
removal of brick veneer residence (lt. of sta. 167+00;
75'x 30') |
1   |
EACH |
15,000.00 |
15,000.00 |
14,000.00 |
14,000.00 |
63,000.00 |
63,000.00 |
14,040.00 |
14,040.00 |
| 203-01 |
general excavation
|
7,284   |
CUYD |
10.00 |
72,840.00 |
7.00 |
50,988.00 |
18.00 |
131,112.00 |
12.87 |
93,745.08 |
| 203-02 |
drainage excavation
|
89,610   |
CUYD |
5.50 |
492,855.00 |
10.00 |
896,100.00 |
11.00 |
985,710.00 |
11.70 |
1,048,437.00 |
| 203-04 |
embankment
|
55,995   |
CUYD |
19.00 |
1,063,905.00 |
16.00 |
895,920.00 |
35.00 |
1,959,825.00 |
24.57 |
1,375,797.15 |
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
150.00 |
1,200.00 |
110.00 |
880.00 |
210.00 |
1,680.00 |
292.50 |
2,340.00 |
| 204-06 |
temporary silt fencing
|
1,978   |
LNFT |
2.00 |
3,956.00 |
2.00 |
3,956.00 |
315.00 |
623,070.00 |
6.00 |
11,868.00 |
| 204-07 |
temporary stone construction entrance
|
2   |
EACH |
3,500.00 |
7,000.00 |
5,800.00 |
11,600.00 |
525.00 |
1,050.00 |
5,850.00 |
11,700.00 |
| 302-02-C |
class ii base course (10" thick)
|
23,468.0 |
SQYD |
20.00 |
469,360.00 |
31.35 |
735,721.80 |
20.00 |
469,360.00 |
37.50 |
880,050.00 |
| 304-01 |
lime
|
137.34 |
TON |
150.00 |
20,601.00 |
170.00 |
23,347.80 |
42.00 |
5,768.28 |
5.85 |
803.44 |
| 304-04-E |
lime treatment (type d) (15" thick)
|
687   |
SQYD |
30.00 |
20,610.00 |
10.00 |
6,870.00 |
43.00 |
29,541.00 |
17.55 |
12,056.85 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
45   |
CUYD |
80.00 |
3,600.00 |
150.00 |
6,750.00 |
105.00 |
4,725.00 |
117.00 |
5,265.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,500.0 |
CUYD |
80.00 |
120,000.00 |
70.00 |
105,000.00 |
100.00 |
150,000.00 |
76.05 |
114,075.00 |
| 502-01 |
superpave asphaltic concrete
|
12,289.6 |
TON |
105.00 |
1,290,408.00 |
115.00 |
1,413,304.00 |
110.00 |
1,351,856.00 |
127.53 |
1,567,292.69 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,186.9 |
TON |
140.00 |
166,166.00 |
154.00 |
182,782.60 |
150.00 |
178,035.00 |
187.20 |
222,187.68 |
| 509-01 |
cold planing asphaltic pavement
|
2,258   |
SQYD |
2.50 |
5,645.00 |
2.60 |
5,870.80 |
4.00 |
9,032.00 |
11.70 |
26,418.60 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 188   |
CUYD |
0.01 |
- 1.88 |
1.00 |
- 188.00 |
2.00 |
- 376.00 |
11.70 |
- 2,199.60 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
64   |
LNFT |
120.00 |
7,680.00 |
130.00 |
8,320.00 |
250.00 |
16,000.00 |
163.80 |
10,483.20 |
| 701-05-G |
side drain pipe (18")
|
600   |
LNFT |
80.00 |
48,000.00 |
90.00 |
54,000.00 |
226.00 |
135,600.00 |
58.50 |
35,100.00 |
| 701-05-G-01 |
side drain pipe (18")(erosion)
|
80   |
LNFT |
70.00 |
5,600.00 |
90.00 |
7,200.00 |
227.00 |
18,160.00 |
58.50 |
4,680.00 |
| 701-05-I |
side drain pipe (24")
|
80   |
LNFT |
100.00 |
8,000.00 |
110.00 |
8,800.00 |
250.00 |
20,000.00 |
70.20 |
5,616.00 |
| 701-06-D |
side drain pipe arch (24" equiv.)
|
148   |
LNFT |
100.00 |
14,800.00 |
110.00 |
16,280.00 |
250.00 |
37,000.00 |
105.30 |
15,584.40 |
| 701-10-G |
reinforced concrete pipe (extension)(18")
|
44   |
LNFT |
110.00 |
4,840.00 |
120.00 |
5,280.00 |
280.00 |
12,320.00 |
210.60 |
9,266.40 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
38   |
LNFT |
140.00 |
5,320.00 |
155.00 |
5,890.00 |
305.00 |
11,590.00 |
292.50 |
11,115.00 |
| 701-15 |
concrete collar
|
4   |
EACH |
1,400.00 |
5,600.00 |
1,500.00 |
6,000.00 |
490.00 |
1,960.00 |
585.00 |
2,340.00 |
| 702-03-A |
catch basins (cb-01)
|
7   |
EACH |
3,600.00 |
25,200.00 |
4,000.00 |
28,000.00 |
9,000.00 |
63,000.00 |
3,744.00 |
26,208.00 |
| 704-03 |
blocked out guard rail
|
1,100.0 |
LNFT |
18.00 |
19,800.00 |
20.00 |
22,000.00 |
18.00 |
19,800.00 |
21.00 |
23,100.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
55.00 |
5,500.00 |
61.00 |
6,100.00 |
1,650.00 |
165,000.00 |
64.35 |
6,435.00 |
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,000.00 |
4,000.00 |
2,400.00 |
4,800.00 |
2,300.00 |
4,600.00 |
2,574.00 |
5,148.00 |
| 704-11-C |
guard rail end treatment (bi-directional)
|
2   |
EACH |
4,100.00 |
8,200.00 |
6,050.00 |
12,100.00 |
2,800.00 |
5,600.00 |
6,435.00 |
12,870.00 |
| 705-02 |
combination mesh & barbed wire fence
|
368   |
LNFT |
6.50 |
2,392.00 |
9.50 |
3,496.00 |
10.00 |
3,680.00 |
10.00 |
3,680.00 |
| 708-01 |
right-of-way monument
|
23   |
EACH |
150.00 |
3,450.00 |
500.00 |
11,500.00 |
1,050.00 |
24,150.00 |
433.00 |
9,959.00 |
| 708-02 |
right-of-way monument witness post
|
23   |
EACH |
150.00 |
3,450.00 |
500.00 |
11,500.00 |
1,050.00 |
24,150.00 |
435.00 |
10,005.00 |
| 711-01-F |
riprap (250 lb, 30" thick)
|
6,524   |
SQYD |
110.00 |
717,640.00 |
120.00 |
782,880.00 |
110.00 |
717,640.00 |
128.70 |
839,638.80 |
| 711-04 |
geotextile fabric
|
6,524   |
SQYD |
2.80 |
18,267.20 |
3.00 |
19,572.00 |
5.00 |
32,620.00 |
3.28 |
21,398.72 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
49,000.00 |
49,000.00 |
210,000.00 |
210,000.00 |
140,000.00 |
140,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
1.672 |
MILE |
10,000.00 |
16,720.00 |
400.00 |
668.80 |
420.00 |
702.24 |
351.00 |
586.87 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
3.344 |
MILE |
5,000.00 |
16,720.00 |
880.00 |
2,942.72 |
840.00 |
2,808.96 |
930.15 |
3,110.42 |
| 713-09 |
temporary precast concrete barrier (department
furnished) |
160   |
EACH |
400.00 |
64,000.00 |
200.00 |
32,000.00 |
750.00 |
120,000.00 |
585.00 |
93,600.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
20,000.00 |
20,000.00 |
46,000.00 |
46,000.00 |
2,500.00 |
2,500.00 |
23,400.00 |
23,400.00 |
| 725-02 |
temporary detour roads
|
21,529.6 |
SQYD |
54.00 |
1,162,598.40 |
51.00 |
1,098,009.60 |
45.00 |
968,832.00 |
65.52 |
1,410,619.39 |
| 726-01 |
bedding material
|
16.9 |
CUYD |
80.00 |
1,352.00 |
180.00 |
3,042.00 |
76.00 |
1,284.40 |
93.60 |
1,581.84 |
| 727-01 |
mobilization
|
lump |
LUMP |
2,925,000.00 |
2,925,000.00 |
4,300,000.00 |
4,300,000.00 |
4,600,000.00 |
4,600,000.00 |
1,170,000.00 |
1,170,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
80.00 |
320.00 |
42.00 |
168.00 |
87.75 |
351.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
1,044   |
EACH |
13.00 |
13,572.00 |
13.00 |
13,572.00 |
5.00 |
5,220.00 |
15.21 |
15,879.24 |
| 731-02 |
reflectorized raised pavement markers
|
306   |
EACH |
5.50 |
1,683.00 |
7.00 |
2,142.00 |
6.00 |
1,836.00 |
6.14 |
1,878.84 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
4.564 |
MILE |
2,400.00 |
10,953.60 |
2,800.00 |
12,779.20 |
3,000.00 |
13,692.00 |
3,054.00 |
13,938.46 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.282 |
MILE |
1,000.00 |
2,282.00 |
900.00 |
2,053.80 |
1,050.00 |
2,396.10 |
865.80 |
1,975.76 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
195.00 |
195.00 |
200.00 |
200.00 |
185.00 |
185.00 |
228.15 |
228.15 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
210.00 |
210.00 |
200.00 |
200.00 |
185.00 |
185.00 |
263.25 |
263.25 |
| 735-01 |
mailboxes
|
19   |
EACH |
10.00 |
190.00 |
10.00 |
190.00 |
130.00 |
2,470.00 |
10.00 |
190.00 |
| 735-02 |
mailbox supports (single)
|
10   |
EACH |
150.00 |
1,500.00 |
170.00 |
1,700.00 |
160.00 |
1,600.00 |
182.00 |
1,820.00 |
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
225.00 |
225.00 |
300.00 |
300.00 |
210.00 |
210.00 |
305.00 |
305.00 |
| 739-01 |
hydro-seeding
|
4.38 |
ACRE |
2,500.00 |
10,950.00 |
1,900.00 |
8,322.00 |
840.00 |
3,679.20 |
1,638.00 |
7,174.44 |
| 740-01 |
construction layout
|
lump |
LUMP |
400,000.00 |
400,000.00 |
750,000.00 |
750,000.00 |
400,000.00 |
400,000.00 |
700,000.00 |
700,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
30,000.00 |
30,000.00 |
40,000.00 |
40,000.00 |
105,000.00 |
105,000.00 |
100,000.00 |
100,000.00 |
| 804-01-B |
precast concrete piles (14")
|
600   |
LNFT |
38.00 |
22,800.00 |
45.00 |
27,000.00 |
175.00 |
105,000.00 |
54.80 |
32,880.00 |
| 804-01-C |
precast concrete piles (16")
|
3,200   |
LNFT |
39.00 |
124,800.00 |
70.00 |
224,000.00 |
130.00 |
416,000.00 |
45.15 |
144,480.00 |
| 804-01-H |
precast concrete piles (36")
|
17,792   |
LNFT |
240.00 |
4,270,080.00 |
315.00 |
5,604,480.00 |
215.00 |
3,825,280.00 |
124.60 |
2,216,883.20 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
5,000.00 |
10,000.00 |
60,000.00 |
120,000.00 |
100,000.00 |
200,000.00 |
20,000.00 |
40,000.00 |
| 804-13-H |
precast concrete indicator piles (36")
|
3   |
EACH |
25,000.00 |
75,000.00 |
75,600.00 |
226,800.00 |
30,000.00 |
90,000.00 |
16,000.00 |
48,000.00 |
| 804-17 |
dynamic monitoring
|
9   |
EACH |
1,500.00 |
13,500.00 |
3,500.00 |
31,500.00 |
10,000.00 |
90,000.00 |
4,000.00 |
36,000.00 |
| 805-01-F |
class a concrete (bents)
|
1,120.20 |
CUYD |
600.00 |
672,120.00 |
2,500.00 |
2,800,500.00 |
850.00 |
952,170.00 |
655.00 |
733,731.00 |
| 805-03 |
class aa concrete
|
6,585.64 |
CUYD |
550.00 |
3,622,102.00 |
1,100.00 |
7,244,204.00 |
850.00 |
5,597,794.00 |
600.00 |
3,951,384.00 |
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
34,512.0 |
LNFT |
150.00 |
5,176,800.00 |
200.00 |
6,902,400.00 |
160.00 |
5,521,920.00 |
137.19 |
4,734,701.28 |
| 805-11 |
strip seal joints
|
880.00 |
LNFT |
125.00 |
110,000.00 |
150.00 |
132,000.00 |
220.00 |
193,600.00 |
150.00 |
132,000.00 |
| 805-12-Y-01 |
reinforced concrete box culverts extension (3' x 3')
|
23.0 |
LNFT |
850.00 |
19,550.00 |
900.00 |
20,700.00 |
1,800.00 |
41,400.00 |
994.50 |
22,873.50 |
| 806-01 |
deformed reinforcing steel
|
1,786,107   |
LB |
0.77 |
1,375,302.39 |
0.80 |
1,428,885.60 |
0.64 |
1,143,108.48 |
0.82 |
1,464,607.74 |
| 807-06 |
structural metalwork
|
lump |
LUMP |
21,000.00 |
21,000.00 |
100,000.00 |
100,000.00 |
55,000.00 |
55,000.00 |
41,245.00 |
41,245.00 |
| 810-01 |
concrete railing (barrier)
|
11,722.10 |
LNFT |
40.00 |
468,884.00 |
50.00 |
586,105.00 |
64.00 |
750,214.40 |
60.00 |
703,326.00 |
| 813-01 |
concrete approach slabs
|
709.64 |
SQYD |
185.00 |
131,283.40 |
190.00 |
134,831.60 |
270.00 |
191,602.80 |
181.35 |
128,693.21 |
| S-001 |
rumble strips (ground-in)
|
2.0 |
MILE |
1,750.00 |
3,500.00 |
2,800.00 |
5,600.00 |
2,100.00 |
4,200.00 |
3,217.50 |
6,435.00 |
| S-002 |
impact attenuators (construction zone)
|
9   |
EACH |
20,000.00 |
180,000.00 |
20,000.00 |
180,000.00 |
16,000.00 |
144,000.00 |
23,700.00 |
213,300.00 |
| S-003 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
1,500   |
LNFT |
3.50 |
5,250.00 |
5.00 |
7,500.00 |
6.00 |
9,000.00 |
5.85 |
8,775.00 |
| S-004 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
960   |
LNFT |
3.50 |
3,360.00 |
5.00 |
4,800.00 |
6.00 |
5,760.00 |
5.85 |
5,616.00 |
| S-005 |
sawcuts in asphaltic concrete lifts
|
2,460   |
LNFT |
1.00 |
2,460.00 |
2.50 |
6,150.00 |
6.00 |
14,760.00 |
1.76 |
4,329.60 |
| S-006 |
dynamic message sign unit
|
4   |
EACH |
5,000.00 |
20,000.00 |
27,000.00 |
108,000.00 |
140,000.00 |
560,000.00 |
2,550.00 |
10,200.00 |
| S-101 |
haul road
|
lump |
LUMP |
1,325,000.00 |
1,325,000.00 |
610,000.00 |
610,000.00 |
9,239,142.00 |
9,239,142.00 |
234,000.00 |
234,000.00 |
| S-102 |
dynamic analysis
|
9   |
EACH |
1,000.00 |
9,000.00 |
3,000.00 |
27,000.00 |
2,200.00 |
19,800.00 |
900.00 |
8,100.00 |
| S-103 |
deck patching
|
300.0 |
SQFT |
250.00 |
75,000.00 |
170.00 |
51,000.00 |
160.00 |
48,000.00 |
73.22 |
21,966.00 |
| S-104 |
temporary lane closure for deck patching
|
20   |
EACH |
3,000.00 |
60,000.00 |
2,600.00 |
52,000.00 |
1,050.00 |
21,000.00 |
3,400.00 |
68,000.00 |
| S-105 |
haul road reconstruction
|
4,500   |
SQYD |
40.00 |
180,000.00 |
21.00 |
94,500.00 |
30.00 |
135,000.00 |
29.25 |
131,625.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
29,525,876.51 |
|
43,573,405.32 |
|
46,186,000.06 |
|
IRREGULAR |
| | NUMBER OF DAYS BID AT $3,000 PER DAY. |
|
|
1057 |
3,171,000.00 |
1100 |
3,300,000.00 |
|
2,550,000.00 |
1000 |
3,000,000.00 |
| | TOTAL BID |
|
|
|
32,696,876.51 |
|
46,873,405.32 |
|
48,736,000.06 |
|
IRREGULAR |
|