DBE GOAL FED
Lead Project: 013-05-0044
Parish: E BATON ROUGE, LIVINGSTON
Routes: US 190
Description: AMITE RIVER BRIDGE AND APPROACHES
Type Const: grading, drainage struct, cold planing acp, class ii bc, lime treatment, s'pave
acp, precast prestressed concrete girder span bridges, removal of old bridges & related work.
Estimated Construction Cost: $29,564,393.39
Maximum Number of Days Allowed for Construction: 1100
Calculated Daily User Cost: $3,000.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 34567 JAMES CONSTRUCTION GROUP LLC $29,525,876.51 1057 $32,696,876.51
2 02179 BOH BROS. CONSTRUCTION CO., LLC. $43,573,405.32 1100 $46,873,405.32
3 47347 KIEWIT LOUISIANA CO $46,186,000.06 850 $48,736,000.06
 02032 O.L. SIMS CO. INC IRREGULAR 1000 IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
JAMES CONSTRUCTION GROUP LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.
- 3 -
KIEWIT LOUISIANA CO

O.L. SIMS CO. INC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 800,000.00 800,000.00 200,000.00 200,000.00 200,000.00 200,000.00 400,000.00 400,000.00
202-01 removal of structures & obstructions lump      LUMP 20,000.00 20,000.00 30,000.00 30,000.00 35,000.00 35,000.00 31,590.00 31,590.00
202-02-A-01 removal of bridge (sta. 136+48.95; 28' x 1462' steel
girder bridge)
1      EACH 300,000.00 300,000.00 1,000,000.00 1,000,000.00 553,000.00 553,000.00 212,026.00 212,026.00
202-02-A-02 removal of bridge (sta. 136+55.11; 24' x 1453' steel
truss bridge)
1      EACH 540,000.00 540,000.00 2,500,000.00 2,500,000.00 553,000.00 553,000.00 339,361.00 339,361.00
202-02-A-03 removal of bridge (sta. 158+67.22; 28' x 540' steel
girder bridge)
1      EACH 100,000.00 100,000.00 600,000.00 600,000.00 430,000.00 430,000.00 77,145.00 77,145.00
202-02-A-04 removal of bridge (sta. 158+43.11; 24' x 540' concrete
deck girder bridge)
1      EACH 190,000.00 190,000.00 600,000.00 600,000.00 430,000.00 430,000.00 87,260.00 87,260.00
202-02-D removal of concrete walks & drives 1,595      SQYD 8.00 12,760.00 14.00 22,330.00 38.00 60,610.00 16.38 26,126.10
202-02-G removal of surfacing & stabilized base 31,331.2    SQYD 4.50 140,990.40 5.00 156,656.00 26.00 814,611.20 11.70 366,575.04
202-02-H removal of guard rail 1,000      LNFT 6.00 6,000.00 4.40 4,400.00 17.00 17,000.00 4.70 4,700.00
202-02-01 removal of brick veneer residence (lt. of sta. 167+00;
75'x 30')
1      EACH 15,000.00 15,000.00 14,000.00 14,000.00 63,000.00 63,000.00 14,040.00 14,040.00
203-01 general excavation 7,284      CUYD 10.00 72,840.00 7.00 50,988.00 18.00 131,112.00 12.87 93,745.08
203-02 drainage excavation 89,610      CUYD 5.50 492,855.00 10.00 896,100.00 11.00 985,710.00 11.70 1,048,437.00
203-04 embankment 55,995      CUYD 19.00 1,063,905.00 16.00 895,920.00 35.00 1,959,825.00 24.57 1,375,797.15
204-05-A temporary sediment check dams (hay) 8      EACH 150.00 1,200.00 110.00 880.00 210.00 1,680.00 292.50 2,340.00
204-06 temporary silt fencing 1,978      LNFT 2.00 3,956.00 2.00 3,956.00 315.00 623,070.00 6.00 11,868.00
204-07 temporary stone construction entrance 2      EACH 3,500.00 7,000.00 5,800.00 11,600.00 525.00 1,050.00 5,850.00 11,700.00
302-02-C class ii base course (10" thick) 23,468.0    SQYD 20.00 469,360.00 31.35 735,721.80 20.00 469,360.00 37.50 880,050.00
304-01 lime 137.34   TON 150.00 20,601.00 170.00 23,347.80 42.00 5,768.28 5.85 803.44
304-04-E lime treatment (type d) (15" thick) 687      SQYD 30.00 20,610.00 10.00 6,870.00 43.00 29,541.00 17.55 12,056.85
401-02 aggregate surface course (adjusted vehicular
measurement)
45      CUYD 80.00 3,600.00 150.00 6,750.00 105.00 4,725.00 117.00 5,265.00
402-01 traffic maintenance aggregate (vehicular measurement) 1,500.0    CUYD 80.00 120,000.00 70.00 105,000.00 100.00 150,000.00 76.05 114,075.00
502-01 superpave asphaltic concrete 12,289.6    TON 105.00 1,290,408.00 115.00 1,413,304.00 110.00 1,351,856.00 127.53 1,567,292.69
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,186.9    TON 140.00 166,166.00 154.00 182,782.60 150.00 178,035.00 187.20 222,187.68
509-01 cold planing asphaltic pavement 2,258      SQYD 2.50 5,645.00 2.60 5,870.80 4.00 9,032.00 11.70 26,418.60
509-02 contractor retained reclaimed asphaltic pavement - 188      CUYD 0.01 - 1.88 1.00 - 188.00 2.00 - 376.00 11.70 - 2,199.60
701-01-I cross drain pipe (24" rcp/pcp) 64      LNFT 120.00 7,680.00 130.00 8,320.00 250.00 16,000.00 163.80 10,483.20
701-05-G side drain pipe (18") 600      LNFT 80.00 48,000.00 90.00 54,000.00 226.00 135,600.00 58.50 35,100.00
701-05-G-01 side drain pipe (18")(erosion) 80      LNFT 70.00 5,600.00 90.00 7,200.00 227.00 18,160.00 58.50 4,680.00
701-05-I side drain pipe (24") 80      LNFT 100.00 8,000.00 110.00 8,800.00 250.00 20,000.00 70.20 5,616.00
701-06-D side drain pipe arch (24" equiv.) 148      LNFT 100.00 14,800.00 110.00 16,280.00 250.00 37,000.00 105.30 15,584.40
701-10-G reinforced concrete pipe (extension)(18") 44      LNFT 110.00 4,840.00 120.00 5,280.00 280.00 12,320.00 210.60 9,266.40
701-10-I reinforced concrete pipe (extension)(24") 38      LNFT 140.00 5,320.00 155.00 5,890.00 305.00 11,590.00 292.50 11,115.00
701-15 concrete collar 4      EACH 1,400.00 5,600.00 1,500.00 6,000.00 490.00 1,960.00 585.00 2,340.00
702-03-A catch basins (cb-01) 7      EACH 3,600.00 25,200.00 4,000.00 28,000.00 9,000.00 63,000.00 3,744.00 26,208.00
704-03 blocked out guard rail 1,100.0    LNFT 18.00 19,800.00 20.00 22,000.00 18.00 19,800.00 21.00 23,100.00
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 55.00 5,500.00 61.00 6,100.00 1,650.00 165,000.00 64.35 6,435.00
704-11-A guard rail end treatment (flared) 2      EACH 2,000.00 4,000.00 2,400.00 4,800.00 2,300.00 4,600.00 2,574.00 5,148.00
704-11-C guard rail end treatment (bi-directional) 2      EACH 4,100.00 8,200.00 6,050.00 12,100.00 2,800.00 5,600.00 6,435.00 12,870.00
705-02 combination mesh & barbed wire fence 368      LNFT 6.50 2,392.00 9.50 3,496.00 10.00 3,680.00 10.00 3,680.00
708-01 right-of-way monument 23      EACH 150.00 3,450.00 500.00 11,500.00 1,050.00 24,150.00 433.00 9,959.00
708-02 right-of-way monument witness post 23      EACH 150.00 3,450.00 500.00 11,500.00 1,050.00 24,150.00 435.00 10,005.00
711-01-F riprap (250 lb, 30" thick) 6,524      SQYD 110.00 717,640.00 120.00 782,880.00 110.00 717,640.00 128.70 839,638.80
711-04 geotextile fabric 6,524      SQYD 2.80 18,267.20 3.00 19,572.00 5.00 32,620.00 3.28 21,398.72
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 49,000.00 49,000.00 210,000.00 210,000.00 140,000.00 140,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
1.672  MILE 10,000.00 16,720.00 400.00 668.80 420.00 702.24 351.00 586.87
713-05-A temporary pavement markings (solid line)(4" width) 3.344  MILE 5,000.00 16,720.00 880.00 2,942.72 840.00 2,808.96 930.15 3,110.42
713-09 temporary precast concrete barrier (department
furnished)
160      EACH 400.00 64,000.00 200.00 32,000.00 750.00 120,000.00 585.00 93,600.00
722-01 project site laboratory 1      EACH 20,000.00 20,000.00 46,000.00 46,000.00 2,500.00 2,500.00 23,400.00 23,400.00
725-02 temporary detour roads 21,529.6    SQYD 54.00 1,162,598.40 51.00 1,098,009.60 45.00 968,832.00 65.52 1,410,619.39
726-01 bedding material 16.9    CUYD 80.00 1,352.00 180.00 3,042.00 76.00 1,284.40 93.60 1,581.84
727-01 mobilization lump      LUMP 2,925,000.00 2,925,000.00 4,300,000.00 4,300,000.00 4,600,000.00 4,600,000.00 1,170,000.00 1,170,000.00
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 80.00 320.00 42.00 168.00 87.75 351.00
731-01 nonreflectorized raised pavement markers 1,044      EACH 13.00 13,572.00 13.00 13,572.00 5.00 5,220.00 15.21 15,879.24
731-02 reflectorized raised pavement markers 306      EACH 5.50 1,683.00 7.00 2,142.00 6.00 1,836.00 6.14 1,878.84
732-02-A plastic pavement striping (solid line) (4" width) 4.564  MILE 2,400.00 10,953.60 2,800.00 12,779.20 3,000.00 13,692.00 3,054.00 13,938.46
732-03-A plastic pavement striping (broken line)(4" width) 2.282  MILE 1,000.00 2,282.00 900.00 2,053.80 1,050.00 2,396.10 865.80 1,975.76
732-04-A plastic pavement legends & symbols (arrow) 1      EACH 195.00 195.00 200.00 200.00 185.00 185.00 228.15 228.15
732-04-C plastic pavement legends & symbols (only) 1      EACH 210.00 210.00 200.00 200.00 185.00 185.00 263.25 263.25
735-01 mailboxes 19      EACH 10.00 190.00 10.00 190.00 130.00 2,470.00 10.00 190.00
735-02 mailbox supports (single) 10      EACH 150.00 1,500.00 170.00 1,700.00 160.00 1,600.00 182.00 1,820.00
735-03 mailbox supports (double) 1      EACH 225.00 225.00 300.00 300.00 210.00 210.00 305.00 305.00
739-01 hydro-seeding 4.38   ACRE 2,500.00 10,950.00 1,900.00 8,322.00 840.00 3,679.20 1,638.00 7,174.44
740-01 construction layout lump      LUMP 400,000.00 400,000.00 750,000.00 750,000.00 400,000.00 400,000.00 700,000.00 700,000.00
744-01 traffic control management lump      LUMP 30,000.00 30,000.00 40,000.00 40,000.00 105,000.00 105,000.00 100,000.00 100,000.00
804-01-B precast concrete piles (14") 600      LNFT 38.00 22,800.00 45.00 27,000.00 175.00 105,000.00 54.80 32,880.00
804-01-C precast concrete piles (16") 3,200      LNFT 39.00 124,800.00 70.00 224,000.00 130.00 416,000.00 45.15 144,480.00
804-01-H precast concrete piles (36") 17,792      LNFT 240.00 4,270,080.00 315.00 5,604,480.00 215.00 3,825,280.00 124.60 2,216,883.20
804-12 loading permanent piles 2      EACH 5,000.00 10,000.00 60,000.00 120,000.00 100,000.00 200,000.00 20,000.00 40,000.00
804-13-H precast concrete indicator piles (36") 3      EACH 25,000.00 75,000.00 75,600.00 226,800.00 30,000.00 90,000.00 16,000.00 48,000.00
804-17 dynamic monitoring 9      EACH 1,500.00 13,500.00 3,500.00 31,500.00 10,000.00 90,000.00 4,000.00 36,000.00
805-01-F class a concrete (bents) 1,120.20   CUYD 600.00 672,120.00 2,500.00 2,800,500.00 850.00 952,170.00 655.00 733,731.00
805-03 class aa concrete 6,585.64   CUYD 550.00 3,622,102.00 1,100.00 7,244,204.00 850.00 5,597,794.00 600.00 3,951,384.00
805-08-D precast-prestressed concrete girders (type iv) 34,512.0    LNFT 150.00 5,176,800.00 200.00 6,902,400.00 160.00 5,521,920.00 137.19 4,734,701.28
805-11 strip seal joints 880.00   LNFT 125.00 110,000.00 150.00 132,000.00 220.00 193,600.00 150.00 132,000.00
805-12-Y-01 reinforced concrete box culverts extension (3' x 3') 23.0    LNFT 850.00 19,550.00 900.00 20,700.00 1,800.00 41,400.00 994.50 22,873.50
806-01 deformed reinforcing steel 1,786,107      LB 0.77 1,375,302.39 0.80 1,428,885.60 0.64 1,143,108.48 0.82 1,464,607.74
807-06 structural metalwork lump      LUMP 21,000.00 21,000.00 100,000.00 100,000.00 55,000.00 55,000.00 41,245.00 41,245.00
810-01 concrete railing (barrier) 11,722.10   LNFT 40.00 468,884.00 50.00 586,105.00 64.00 750,214.40 60.00 703,326.00
813-01 concrete approach slabs 709.64   SQYD 185.00 131,283.40 190.00 134,831.60 270.00 191,602.80 181.35 128,693.21
S-001 rumble strips (ground-in) 2.0    MILE 1,750.00 3,500.00 2,800.00 5,600.00 2,100.00 4,200.00 3,217.50 6,435.00
S-002 impact attenuators (construction zone) 9      EACH 20,000.00 180,000.00 20,000.00 180,000.00 16,000.00 144,000.00 23,700.00 213,300.00
S-003 sawing and sealing longitudinal joints in asphaltic
concrete overlay
1,500      LNFT 3.50 5,250.00 5.00 7,500.00 6.00 9,000.00 5.85 8,775.00
S-004 sawing and sealing transverse joints in asphaltic
concrete overlay
960      LNFT 3.50 3,360.00 5.00 4,800.00 6.00 5,760.00 5.85 5,616.00
S-005 sawcuts in asphaltic concrete lifts 2,460      LNFT 1.00 2,460.00 2.50 6,150.00 6.00 14,760.00 1.76 4,329.60
S-006 dynamic message sign unit 4      EACH 5,000.00 20,000.00 27,000.00 108,000.00 140,000.00 560,000.00 2,550.00 10,200.00
S-101 haul road lump      LUMP 1,325,000.00 1,325,000.00 610,000.00 610,000.00 9,239,142.00 9,239,142.00 234,000.00 234,000.00
S-102 dynamic analysis 9      EACH 1,000.00 9,000.00 3,000.00 27,000.00 2,200.00 19,800.00 900.00 8,100.00
S-103 deck patching 300.0    SQFT 250.00 75,000.00 170.00 51,000.00 160.00 48,000.00 73.22 21,966.00
S-104 temporary lane closure for deck patching 20      EACH 3,000.00 60,000.00 2,600.00 52,000.00 1,050.00 21,000.00 3,400.00 68,000.00
S-105 haul road reconstruction 4,500      SQYD 40.00 180,000.00 21.00 94,500.00 30.00 135,000.00 29.25 131,625.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       29,525,876.51   43,573,405.32   46,186,000.06   IRREGULAR
 NUMBER OF DAYS BID AT $3,000 PER DAY.     1057 3,171,000.00 1100 3,300,000.00   2,550,000.00 1000 3,000,000.00
 TOTAL BID       32,696,876.51   46,873,405.32   48,736,000.06   IRREGULAR