| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - FORBY CONTRACTING, INC. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - PRAIRIE CONTRACTORS INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
360   |
LNFT |
10.00 |
3,600.00 |
15.00 |
5,400.00 |
20.00 |
7,200.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
309   |
CUYD |
25.00 |
7,725.00 |
15.00 |
4,635.00 |
25.00 |
7,725.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
4,786.9 |
TON |
103.00 |
493,050.70 |
99.00 |
473,903.10 |
115.00 |
550,493.50 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
255.0 |
TON |
150.00 |
38,250.00 |
120.00 |
30,600.00 |
150.00 |
38,250.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
17,786   |
SQYD |
2.00 |
35,572.00 |
3.00 |
53,358.00 |
2.90 |
51,579.40 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 495   |
CUYD |
1.00 |
- 495.00 |
0.01 |
- 4.95 |
0.01 |
- 4.95 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
100   |
SQYD |
200.00 |
20,000.00 |
94.00 |
9,400.00 |
200.00 |
20,000.00 |
|
|
| 510-02 |
pavement widening
|
50.0 |
SQYD |
225.00 |
11,250.00 |
135.00 |
6,750.00 |
225.00 |
11,250.00 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
25,146   |
LNFT |
1.50 |
37,719.00 |
2.00 |
50,292.00 |
1.50 |
37,719.00 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
22,057   |
LNFT |
1.75 |
38,599.75 |
2.40 |
52,936.80 |
1.75 |
38,599.75 |
|
|
| 602-03 |
cleaning and sealing random cracks
|
1,281   |
LNFT |
2.50 |
3,202.50 |
3.60 |
4,611.60 |
2.50 |
3,202.50 |
|
|
| 602-05-K-01 |
full depth patching of jointed conc pvmt (10" thick)
(16.0 sq yds & under) |
283.9 |
SQYD |
135.00 |
38,326.50 |
185.00 |
52,521.50 |
150.00 |
42,585.00 |
|
|
| 602-05-K-02 |
full depth patching of jointed conc pvmt (10" thick)
(16.1-48.0 sq yds) |
210.2 |
SQYD |
125.00 |
26,275.00 |
175.00 |
36,785.00 |
150.00 |
31,530.00 |
|
|
| 602-05-K-03 |
full depth patching of jointed conc pvmt (10" thick)
(48.1 sq yds & over) |
725.9 |
SQYD |
120.00 |
87,108.00 |
165.00 |
119,773.50 |
125.00 |
90,737.50 |
|
|
| 602-08 |
grinding concrete pavement
|
1,111.1 |
SQYD |
18.00 |
19,999.80 |
11.00 |
12,222.10 |
10.00 |
11,111.00 |
|
|
| 602-10 |
longitudinal shoulder joints
|
3,407   |
LNFT |
1.35 |
4,599.45 |
3.00 |
10,221.00 |
2.00 |
6,814.00 |
|
|
| 704-03 |
blocked out guard rail
|
237.6 |
LNFT |
17.25 |
4,098.60 |
28.00 |
6,652.80 |
17.25 |
4,098.60 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
50.0 |
LNFT |
55.00 |
2,750.00 |
50.00 |
2,500.00 |
55.00 |
2,750.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,000.00 |
4,000.00 |
1,700.00 |
3,400.00 |
2,000.00 |
4,000.00 |
|
|
| 707-01 |
concrete curb
|
300.0 |
LNFT |
12.00 |
3,600.00 |
30.00 |
9,000.00 |
60.00 |
18,000.00 |
|
|
| 707-03 |
combination concrete curb & gutter
|
150.0 |
LNFT |
49.00 |
7,350.00 |
50.00 |
7,500.00 |
75.00 |
11,250.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
100,000.00 |
100,000.00 |
115,000.00 |
115,000.00 |
|
|
| 713-02-C |
temporary pavement markings (8" width)
|
2,022   |
LNFT |
0.30 |
606.60 |
0.40 |
808.80 |
0.20 |
404.40 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.818 |
MILE |
500.00 |
2,909.00 |
300.00 |
1,745.40 |
400.00 |
2,327.20 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.909 |
MILE |
275.00 |
799.98 |
350.00 |
1,018.15 |
300.00 |
872.70 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
5.223 |
MILE |
495.00 |
2,585.39 |
590.00 |
3,081.57 |
1.00 |
5.22 |
|
|
| 713-05-A |
temporary pavement legends and symbols (arrow)
|
1   |
EACH |
50.00 |
50.00 |
60.00 |
60.00 |
50.00 |
50.00 |
|
|
| 713-05-C |
temporary pavement legends and symbols (only)
|
1   |
EACH |
50.00 |
50.00 |
60.00 |
60.00 |
50.00 |
50.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
140,000.00 |
140,000.00 |
120,000.00 |
120,000.00 |
180,000.00 |
180,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
75.00 |
300.00 |
85.00 |
340.00 |
75.00 |
300.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,651   |
EACH |
5.10 |
8,420.10 |
6.00 |
9,906.00 |
4.75 |
7,842.25 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
2,022   |
LNFT |
0.85 |
1,718.70 |
1.00 |
2,022.00 |
1.00 |
2,022.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.223 |
MILE |
2,490.00 |
13,005.27 |
3,000.00 |
15,669.00 |
2,300.00 |
12,012.90 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.909 |
MILE |
780.00 |
2,269.02 |
900.00 |
2,618.10 |
750.00 |
2,181.75 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
175.00 |
175.00 |
200.00 |
200.00 |
150.00 |
150.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
195.00 |
195.00 |
230.00 |
230.00 |
150.00 |
150.00 |
|
|
| 732-05 |
removal of existing markings
|
1.495 |
MILE |
5,725.00 |
8,558.88 |
6,700.00 |
10,016.50 |
4,000.00 |
5,980.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
30,000.00 |
30,000.00 |
3,000.00 |
3,000.00 |
|
|
| S-001 |
rumble strips (ground-in)
|
2.0 |
MILE |
1,475.00 |
2,950.00 |
1,700.00 |
3,400.00 |
6,000.00 |
12,000.00 |
|
|
| S-002 |
raising and/or under-sealing concrete slabs
|
2,000   |
LBS |
6.00 |
12,000.00 |
5.50 |
11,000.00 |
10.00 |
20,000.00 |
|
|
| S-003 |
ultra-thin hmac wearing course system
|
36,530   |
SQYD |
8.50 |
310,505.00 |
9.00 |
328,770.00 |
10.00 |
365,300.00 |
|
|
| S-004 |
dynamic message sign unit
|
2   |
EACH |
10,000.00 |
20,000.00 |
15,000.00 |
30,000.00 |
7,000.00 |
14,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,473,679.24 |
|
1,623,402.97 |
|
1,732,538.72 |
|
|
|