Letting of 6/27/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 008-04-0059
Parish: ST LANDRY
Routes: US 190
Description: W. END ATCHAFALAYA RB - 0.32 MI W. LA 3174
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete overlay,
pavement patching, ultra thin hmac, and related work.
Estimated Construction Cost: $1,290,653.80
 
RankLicenseBidderConstruction Bid
1 21982 FORBY CONTRACTING, INC. $1,473,679.24
2 12312 GILCHRIST CONSTRUCTION CO. LLC $1,623,402.97
3 34356 PRAIRIE CONTRACTORS INC. $1,732,538.72
 
Item Number Item Description Quantity Unit of Measure - 1 -
FORBY CONTRACTING, INC.
- 2 -
GILCHRIST CONSTRUCTION CO. LLC
- 3 -
PRAIRIE CONTRACTORS INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-H removal of guard rail 360      LNFT 10.00 3,600.00 15.00 5,400.00 20.00 7,200.00    
203-07 borrow (vehicular measurement) 309      CUYD 25.00 7,725.00 15.00 4,635.00 25.00 7,725.00    
502-01 superpave asphaltic concrete 4,786.9    TON 103.00 493,050.70 99.00 473,903.10 115.00 550,493.50    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
255.0    TON 150.00 38,250.00 120.00 30,600.00 150.00 38,250.00    
509-01 cold planing asphaltic pavement 17,786      SQYD 2.00 35,572.00 3.00 53,358.00 2.90 51,579.40    
509-02 contractor retained reclaimed asphaltic pavement - 495      CUYD 1.00 - 495.00 0.01 - 4.95 0.01 - 4.95    
510-01-B pavement patching (12" minimum thickness) 100      SQYD 200.00 20,000.00 94.00 9,400.00 200.00 20,000.00    
510-02 pavement widening 50.0    SQYD 225.00 11,250.00 135.00 6,750.00 225.00 11,250.00    
602-02-A cleaning and resealing existing longitudinal pavement
joints
25,146      LNFT 1.50 37,719.00 2.00 50,292.00 1.50 37,719.00    
602-02-B cleaning and resealing existing transverse pavement
joints
22,057      LNFT 1.75 38,599.75 2.40 52,936.80 1.75 38,599.75    
602-03 cleaning and sealing random cracks 1,281      LNFT 2.50 3,202.50 3.60 4,611.60 2.50 3,202.50    
602-05-K-01 full depth patching of jointed conc pvmt (10" thick)
(16.0 sq yds & under)
283.9    SQYD 135.00 38,326.50 185.00 52,521.50 150.00 42,585.00    
602-05-K-02 full depth patching of jointed conc pvmt (10" thick)
(16.1-48.0 sq yds)
210.2    SQYD 125.00 26,275.00 175.00 36,785.00 150.00 31,530.00    
602-05-K-03 full depth patching of jointed conc pvmt (10" thick)
(48.1 sq yds & over)
725.9    SQYD 120.00 87,108.00 165.00 119,773.50 125.00 90,737.50    
602-08 grinding concrete pavement 1,111.1    SQYD 18.00 19,999.80 11.00 12,222.10 10.00 11,111.00    
602-10 longitudinal shoulder joints 3,407      LNFT 1.35 4,599.45 3.00 10,221.00 2.00 6,814.00    
704-03 blocked out guard rail 237.6    LNFT 17.25 4,098.60 28.00 6,652.80 17.25 4,098.60    
704-08-B guard rail transitions (double thrie beam) 50.0    LNFT 55.00 2,750.00 50.00 2,500.00 55.00 2,750.00    
704-11-A guard rail end treatment (flared) 2      EACH 2,000.00 4,000.00 1,700.00 3,400.00 2,000.00 4,000.00    
707-01 concrete curb 300.0    LNFT 12.00 3,600.00 30.00 9,000.00 60.00 18,000.00    
707-03 combination concrete curb & gutter 150.0    LNFT 49.00 7,350.00 50.00 7,500.00 75.00 11,250.00    
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00 100,000.00 100,000.00 115,000.00 115,000.00    
713-02-C temporary pavement markings (8" width) 2,022      LNFT 0.30 606.60 0.40 808.80 0.20 404.40    
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
5.818  MILE 500.00 2,909.00 300.00 1,745.40 400.00 2,327.20    
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
2.909  MILE 275.00 799.98 350.00 1,018.15 300.00 872.70    
713-04-A temporary pavement markings (solid line)(4" width) 5.223  MILE 495.00 2,585.39 590.00 3,081.57 1.00 5.22    
713-05-A temporary pavement legends and symbols (arrow) 1      EACH 50.00 50.00 60.00 60.00 50.00 50.00    
713-05-C temporary pavement legends and symbols (only) 1      EACH 50.00 50.00 60.00 60.00 50.00 50.00    
727-01 mobilization lump      LUMP 140,000.00 140,000.00 120,000.00 120,000.00 180,000.00 180,000.00    
729-16-C object marker assembly (type 3) 4      EACH 75.00 300.00 85.00 340.00 75.00 300.00    
731-02 reflectorized raised pavement markers 1,651      EACH 5.10 8,420.10 6.00 9,906.00 4.75 7,842.25    
732-01-C plastic pavement striping (8" width) 2,022      LNFT 0.85 1,718.70 1.00 2,022.00 1.00 2,022.00    
732-02-A plastic pavement striping (solid line) (4" width) 5.223  MILE 2,490.00 13,005.27 3,000.00 15,669.00 2,300.00 12,012.90    
732-03-A plastic pavement striping (broken line)(4" width) 2.909  MILE 780.00 2,269.02 900.00 2,618.10 750.00 2,181.75    
732-04-A plastic pavement legends & symbols (arrow) 1      EACH 175.00 175.00 200.00 200.00 150.00 150.00    
732-04-C plastic pavement legends & symbols (only) 1      EACH 195.00 195.00 230.00 230.00 150.00 150.00    
732-05 removal of existing markings 1.495  MILE 5,725.00 8,558.88 6,700.00 10,016.50 4,000.00 5,980.00    
740-01 construction layout lump      LUMP 10,000.00 10,000.00 30,000.00 30,000.00 3,000.00 3,000.00    
S-001 rumble strips (ground-in) 2.0    MILE 1,475.00 2,950.00 1,700.00 3,400.00 6,000.00 12,000.00    
S-002 raising and/or under-sealing concrete slabs 2,000      LBS 6.00 12,000.00 5.50 11,000.00 10.00 20,000.00    
S-003 ultra-thin hmac wearing course system 36,530      SQYD 8.50 310,505.00 9.00 328,770.00 10.00 365,300.00    
S-004 dynamic message sign unit 2      EACH 10,000.00 20,000.00 15,000.00 30,000.00 7,000.00 14,000.00    
                       
 CONTRACTOR TOTAL       1,473,679.24   1,623,402.97   1,732,538.72    