| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MASSMAN/TRAYLOR BRO/IHI INC JT VENT |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-I |
removal of existing sidewalk, floorbeam end, railing,
other metalwork and components |
lump |
LUMP |
4,000,000.00 |
4,000,000.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
300,000.00 |
300,000.00 |
|
|
|
|
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
5,568   |
LNFT |
1.00 |
5,568.00 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
2   |
EACH |
100,000.00 |
200,000.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
67,000,000.00 |
67,000,000.00 |
|
|
|
|
|
|
| 730-09 |
electrical system
|
lump |
LUMP |
600,000.00 |
600,000.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
1,000,000.00 |
1,000,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
1,000,000.00 |
1,000,000.00 |
|
|
|
|
|
|
| 807-06-A |
structural metalwork (mill materials)
|
lump |
LUMP |
27,000,000.00 |
27,000,000.00 |
|
|
|
|
|
|
| 807-06-B |
structural metalwork (fabrication)
|
lump |
LUMP |
72,000,000.00 |
72,000,000.00 |
|
|
|
|
|
|
| 807-06-C |
structural metalwork (delivery and erection)
|
lump |
LUMP |
209,776,000.00 |
209,776,000.00 |
|
|
|
|
|
|
| S-101 |
cleaning, painting, waste disposal/recycling of
existing bridge metalwork faying surfaces at widening mem. connections |
lump |
LUMP |
8,000,000.00 |
8,000,000.00 |
|
|
|
|
|
|
| S-103 |
modified standard temporary precast barrier (15' unit)
|
376   |
each |
7,000.00 |
2,632,000.00 |
|
|
|
|
|
|
| S-104 |
variable message unit
|
18   |
each |
20,000.00 |
360,000.00 |
|
|
|
|
|
|
| S-106 |
construction engineering
|
lump |
lump |
10,000,000.00 |
10,000,000.00 |
|
|
|
|
|
|
| S-107 |
truss monitoring
|
lump |
lump |
9,000,000.00 |
9,000,000.00 |
|
|
|
|
|
|
| S-108 |
steel barrier railing
|
10,332.00 |
LNFT |
1,000.00 |
10,332,000.00 |
|
|
|
|
|
|
| S-109 |
anchor bolt replacement
|
35   |
each |
2,000.00 |
70,000.00 |
|
|
|
|
|
|
| S-110 |
maintenance of traffic
|
lump |
lump |
1,000,000.00 |
1,000,000.00 |
|
|
|
|
|
|
| S-111 |
traffic assistance
|
36   |
mon |
100,000.00 |
3,600,000.00 |
|
|
|
|
|
|
| S-112 |
construction screening
|
lump |
lump |
8,000,000.00 |
8,000,000.00 |
|
|
|
|
|
|
| S-113 |
pier jacking
|
lump |
lump |
500,000.00 |
500,000.00 |
|
|
|
|
|
|
| S-114 |
web-enabled camera system
|
2   |
each |
300,000.00 |
600,000.00 |
|
|
|
|
|
|
| S-115 |
field office
|
lump |
LUMP |
300,000.00 |
300,000.00 |
|
|
|
|
|
|
| S-116 |
tug boat assistance
|
2,190   |
DAY |
7,000.00 |
15,330,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
452,605,568.00 |
|
|
|
|
|
|
| | NUMBER OF DAYS BID AT $25,000 PER DAY. |
|
|
1460 |
36,500,000.00 |
|
|
|
|
|
|
| | TOTAL BID |
|
|
|
489,105,568.00 |
|
|
|
|
|
|
|