| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARBER BROS. CONTRACTING CO., L.L.C |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
135   |
SQYD |
25.00 |
3,375.00 |
12.00 |
1,620.00 |
|
|
|
|
| 202-02-H |
removal of guard rail
|
331   |
LNFT |
6.00 |
1,986.00 |
8.00 |
2,648.00 |
|
|
|
|
| 203-07 |
borrow (vehicular meas.)
|
2,964   |
CUYD |
1.00 |
2,964.00 |
8.00 |
23,712.00 |
|
|
|
|
| 203-07-A |
borrow (vehicular meas.)(selected soils)
|
1,408   |
CUYD |
1.00 |
1,408.00 |
8.00 |
11,264.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
8   |
EACH |
150.00 |
1,200.00 |
100.00 |
800.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
3,960   |
LNFT |
1.00 |
3,960.00 |
1.25 |
4,950.00 |
|
|
|
|
| 304-01 |
lime
|
44.82 |
TON |
140.00 |
6,274.80 |
100.00 |
4,482.00 |
|
|
|
|
| 304-03-D |
lime treatment (type c) (12" thick)
|
633   |
SQYD |
2.00 |
1,266.00 |
5.00 |
3,165.00 |
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,266   |
SQYD |
4.00 |
5,064.00 |
5.00 |
6,330.00 |
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
50,654   |
SQYD |
7.50 |
379,905.00 |
5.00 |
253,270.00 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
225   |
CUYD |
75.00 |
16,875.00 |
40.00 |
9,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
10,759.4 |
TON |
65.00 |
699,361.00 |
60.00 |
645,564.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
582.2 |
TON |
100.00 |
58,220.00 |
120.00 |
69,864.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
34,934   |
SQYD |
2.00 |
69,868.00 |
3.00 |
104,802.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,092   |
CUYD |
0.00 |
0.00 |
0.01 |
- 10.92 |
|
|
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
160.0 |
LNFT |
35.00 |
5,600.00 |
50.00 |
8,000.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
275.2 |
LNFT |
25.00 |
6,880.00 |
20.00 |
5,504.00 |
|
|
|
|
| 704-08-B |
guard rail end transition (double thrie beam)
|
92.7 |
LNFT |
65.00 |
6,025.50 |
60.00 |
5,562.00 |
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
3,000.00 |
6,000.00 |
2,600.00 |
5,200.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
149,500.00 |
149,500.00 |
|
|
|
|
| 713-02-E |
temporary pavement markings (24" width)
|
25   |
LNFT |
2.00 |
50.00 |
0.50 |
12.50 |
|
|
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
9.000 |
MILE |
350.00 |
3,150.00 |
500.00 |
4,500.00 |
|
|
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
8.829 |
MILE |
400.00 |
3,531.60 |
10.00 |
88.29 |
|
|
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
12.171 |
MILE |
700.00 |
8,519.70 |
10.00 |
121.71 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
3,000.00 |
3,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
40,000.00 |
40,000.00 |
74,900.00 |
74,900.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
12   |
EACH |
75.00 |
900.00 |
60.00 |
720.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
85.00 |
340.00 |
75.00 |
300.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
397   |
EACH |
6.00 |
2,382.00 |
7.00 |
2,779.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
25   |
LNFT |
5.00 |
125.00 |
4.00 |
100.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.057 |
MILE |
3,000.00 |
18,171.00 |
2,700.00 |
16,353.90 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.943 |
MILE |
1,000.00 |
2,943.00 |
1,000.00 |
2,943.00 |
|
|
|
|
| 735-01 |
mailboxes
|
37   |
EACH |
2.00 |
74.00 |
6.00 |
222.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
35   |
EACH |
150.00 |
5,250.00 |
130.00 |
4,550.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
200.00 |
200.00 |
180.00 |
180.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
3.64 |
ACRE |
1,500.00 |
5,460.00 |
1,000.00 |
3,640.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
10,000.00 |
10,000.00 |
59,600.00 |
59,600.00 |
|
|
|
|
| S-001 |
special anchor section
|
2   |
EACH |
3,000.00 |
6,000.00 |
1,000.00 |
2,000.00 |
|
|
|
|
| S-002 |
saw cutting driveways (6" deep)
|
250   |
LNFT |
15.00 |
3,750.00 |
20.00 |
5,000.00 |
|
|
|
|
| S-003 |
rumble strips (ground-in)(t-intersection)
|
1   |
EACH |
5,000.00 |
5,000.00 |
6,600.00 |
6,600.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,445,078.60 |
|
1,504,836.48 |
|
|
|
|
|