Letting of 5/30/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 861-11-0006
Parish: W BATON ROUGE
Routes: LA 984
Description: JCT. LA 620 - JCT. LA 983
Type Const: grading, cold planing asphaltic concrete pavement, superpave asphaltic concrete
pavement, cement treated base course, lime treatment, and related work.
Estimated Construction Cost: $1,754,557.44
 
RankLicenseBidderConstruction Bid
1 00046 BARBER BROS. CONTRACTING CO., L.L.C $1,445,078.60
2 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $1,504,836.48
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARBER BROS. CONTRACTING CO., L.L.C
- 2 -
F.G. SULLIVAN, JR. CONTRACTOR LLC

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 135      SQYD 25.00 3,375.00 12.00 1,620.00        
202-02-H removal of guard rail 331      LNFT 6.00 1,986.00 8.00 2,648.00        
203-07 borrow (vehicular meas.) 2,964      CUYD 1.00 2,964.00 8.00 23,712.00        
203-07-A borrow (vehicular meas.)(selected soils) 1,408      CUYD 1.00 1,408.00 8.00 11,264.00        
204-05-A temporary sediment check dams (hay) 8      EACH 150.00 1,200.00 100.00 800.00        
204-06 temporary silt fencing 3,960      LNFT 1.00 3,960.00 1.25 4,950.00        
304-01 lime 44.82   TON 140.00 6,274.80 100.00 4,482.00        
304-03-D lime treatment (type c) (12" thick) 633      SQYD 2.00 1,266.00 5.00 3,165.00        
304-04-D lime treatment (type d) (12" thick) 1,266      SQYD 4.00 5,064.00 5.00 6,330.00        
308-01-A in-place cement treated base course (12" thick) 50,654      SQYD 7.50 379,905.00 5.00 253,270.00        
401-02 aggregate surface course (adjusted vehicular
measurement)
225      CUYD 75.00 16,875.00 40.00 9,000.00        
502-01 superpave asphaltic concrete 10,759.4    TON 65.00 699,361.00 60.00 645,564.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
582.2    TON 100.00 58,220.00 120.00 69,864.00        
509-01 cold planing asphaltic pavement 34,934      SQYD 2.00 69,868.00 3.00 104,802.00        
509-02 contractor retained reclaimed asphaltic pavement - 1,092      CUYD 0.00 0.00 0.01 - 10.92        
704-01-B guard rail (single thrie beam)(6'-3" post spacing) 160.0    LNFT 35.00 5,600.00 50.00 8,000.00        
704-03 blocked out guard rail 275.2    LNFT 25.00 6,880.00 20.00 5,504.00        
704-08-B guard rail end transition (double thrie beam) 92.7    LNFT 65.00 6,025.50 60.00 5,562.00        
704-11-B guard rail end treatment (tangent) 2      EACH 3,000.00 6,000.00 2,600.00 5,200.00        
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00 149,500.00 149,500.00        
713-02-E temporary pavement markings (24" width) 25      LNFT 2.00 50.00 0.50 12.50        
713-03-A temporary pavement markings (broken line)(4" width)(4'
length)
9.000  MILE 350.00 3,150.00 500.00 4,500.00        
713-03-B temporary pavement markings (broken line)(4" width)
(10' length)
8.829  MILE 400.00 3,531.60 10.00 88.29        
713-04-A temporary pavement markings (solid line)(4" width) 12.171  MILE 700.00 8,519.70 10.00 121.71        
722-01 project site laboratory 1      EACH 3,000.00 3,000.00 5,000.00 5,000.00        
727-01 mobilization lump      LUMP 40,000.00 40,000.00 74,900.00 74,900.00        
729-16-B object marker assembly (type 2) 12      EACH 75.00 900.00 60.00 720.00        
729-16-C object marker assembly (type 3) 4      EACH 85.00 340.00 75.00 300.00        
731-02 reflectorized raised pavement markers 397      EACH 6.00 2,382.00 7.00 2,779.00        
732-01-E plastic pavement striping (24" width) 25      LNFT 5.00 125.00 4.00 100.00        
732-02-A plastic pavement striping (solid line) (4" width) 6.057  MILE 3,000.00 18,171.00 2,700.00 16,353.90        
732-03-A plastic pavement striping (broken line)(4" width) 2.943  MILE 1,000.00 2,943.00 1,000.00 2,943.00        
735-01 mailboxes 37      EACH 2.00 74.00 6.00 222.00        
735-02 mailbox supports (single) 35      EACH 150.00 5,250.00 130.00 4,550.00        
735-03 mailbox supports (double) 1      EACH 200.00 200.00 180.00 180.00        
739-01 hydro-seeding 3.64   ACRE 1,500.00 5,460.00 1,000.00 3,640.00        
740-01 construction layout lump      LUMP 10,000.00 10,000.00 59,600.00 59,600.00        
S-001 special anchor section 2      EACH 3,000.00 6,000.00 1,000.00 2,000.00        
S-002 saw cutting driveways (6" deep) 250      LNFT 15.00 3,750.00 20.00 5,000.00        
S-003 rumble strips (ground-in)(t-intersection) 1      EACH 5,000.00 5,000.00 6,600.00 6,600.00        
                       
 CONTRACTOR TOTAL       1,445,078.60   1,504,836.48        