Letting of 5/30/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 855-08-0048
Parish: TERREBONNE
Routes: LA 661
Description: LA 661, HOUMA NAVIGATIONAL CANAL - LA 3040
Type Const: cleaning and resealing joints in pccp, superpave asph conc overlay, pavement patching,
pavement widening and related work.
Estimated Construction Cost: $1,909,179.35
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $1,656,322.90
2 06487 HUEY STOCKSTILL, INC. $1,677,194.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
HUEY STOCKSTILL, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-C removal of portland cement concrete pavement 320      SQYD 20.00 6,400.00 30.00 9,600.00        
202-02-F removal of concrete combination curb & gutter 400.0    LNFT 10.00 4,000.00 4.00 1,600.00        
202-02-H removal of guard rail 135      LNFT 10.00 1,350.00 7.00 945.00        
202-03 relocation of existing signs 60      EACH 25.00 1,500.00 70.00 4,200.00        
203-08 borrow (vehicular measurement) 750      CUYD 10.00 7,500.00 13.00 9,750.00        
502-01 superpave asphaltic concrete 11,440.0    TON 76.00 869,440.00 66.00 755,040.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,227.3    TON 76.00 93,274.80 95.00 116,593.50        
602-02-A cleaning and resealing existing longitudinal pavement
joints
11,000      LNFT 1.25 13,750.00 0.90 9,900.00        
602-02-B cleaning and resealing existing transverse pavement
joints
16,000      LNFT 1.50 24,000.00 0.90 14,400.00        
602-03 cleaning and sealing random cracks 2,500      LNFT 2.50 6,250.00 3.00 7,500.00        
702-04-A adjusting manholes 6      EACH 100.00 600.00 500.00 3,000.00        
702-04-B adjusting catch basins 3      EACH 3,000.00 9,000.00 1,000.00 3,000.00        
704-01-B guard rail (single thrie beam) (6'-3" post spacing) 75.0    LNFT 100.00 7,500.00 100.00 7,500.00        
704-03 blocked out guard rail 6.3    LNFT 20.00 126.00 35.00 220.50        
704-11-B guard rail end treatment (tangent) 1      EACH 2,500.00 2,500.00 4,000.00 4,000.00        
707-03 combination concrete curb & gutter 150.0    LNFT 40.00 6,000.00 40.00 6,000.00        
712-02 sacked concrete revetment 40      SQYD 100.00 4,000.00 70.00 2,800.00        
713-01 temporary signs & barricades lump      LUMP 85,000.00 85,000.00 110,000.00 110,000.00        
713-03-C temporary pavement markings (8" width) 311      LNFT 0.10 31.10 0.10 31.10        
713-03-E temporary pavement markings (24" width) 519      LNFT 1.00 519.00 0.50 259.50        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
2.020  MILE 200.00 404.00 200.00 404.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
2.020  MILE 100.00 202.00 10.00 20.20        
713-05-A temporary pavement markings (solid line)(4" width) 8.080  MILE 100.00 808.00 500.00 4,040.00        
713-06-A temporary pavement legends and symbols (arrow) 6      EACH 50.00 300.00 50.00 300.00        
724-01-B pavement patching (12" minimum thickness) 1,500      SQYD 45.00 67,500.00 75.00 112,500.00        
724-02 pavement widening 2,123.7    SQYD 45.00 95,566.50 40.00 84,948.00        
724-03 pavement joint repair 25.0    TON 20.00 500.00 75.00 1,875.00        
727-01 mobilization lump      LUMP 160,000.00 160,000.00 160,000.00 160,000.00        
729-16-C object marker assembly(type 3) 2      EACH 90.00 180.00 100.00 200.00        
729-19-C dead end road installation (type c) 3      EACH 1,000.00 3,000.00 700.00 2,100.00        
731-02 reflectorized raised pavement markers 645      EACH 6.00 3,870.00 5.50 3,547.50        
732-01-C plastic pavement striping (8" width) 311      LNFT 1.00 311.00 1.00 311.00        
732-01-E plastic pavement striping (24" width) 519      LNFT 4.50 2,335.50 4.00 2,076.00        
732-02-A plastic pavement striping (solid line) (4" width) 8.080  MILE 25.00 202.00 2,800.00 22,624.00        
732-04-A plastic pavement legends & symbols (arrow) 3      EACH 250.00 750.00 200.00 600.00        
732-04-C plastic pavement legends & symbols (only) 3      EACH 250.00 750.00 250.00 750.00        
732-05 removal of existing markings 0.106  MILE 8,000.00 848.00 7,000.00 742.00        
735-01 mailboxes 73      EACH 7.00 511.00 5.00 365.00        
735-02 mailbox supports (single) 60      EACH 150.00 9,000.00 135.00 8,100.00        
735-03 mailbox supports (double) 5      EACH 175.00 875.00 185.00 925.00        
735-04 mailbox supports (multiple) 1      EACH 250.00 250.00 300.00 300.00        
736-09 loop detector 1,500      LNFT 13.00 19,500.00 11.00 16,500.00        
740-01 construction layout lump      LUMP 20,000.00 20,000.00 25,000.00 25,000.00        
744-01 traffic control management lump      LUMP 11,000.00 11,000.00 68,000.00 68,000.00        
S-001 surface preparation 3,369      SQYD 3.00 10,107.00 1.50 5,053.50        
S-002 special guard rail anchor section 1      EACH 1,200.00 1,200.00 1,000.00 1,000.00        
S-003 saw cutting 9,612      INFT 1.00 9,612.00 1.10 10,573.20        
S-922 sawing and sealing longitudinal joints in asphaltic
concrete overlay
22,000      LNFT 1.30 28,600.00 1.20 26,400.00        
S-923 sawing and sealing transverse joints in asphaltic
concrete overlay
32,000      LNFT 1.20 38,400.00 0.60 19,200.00        
S-927 sawcuts in asphaltic concrete lifts 27,000      LNFT 1.00 27,000.00 1.20 32,400.00        
                       
 CONTRACTOR TOTAL       1,656,322.90   1,677,194.00        