Letting of 5/30/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 852-15-0004
Parish: ST TAMMANY
Routes: LA 1081
Description: S. JCT. LA 437 - N. JCT. LA 437
Type Const: grading, in-place cement treated base course, cold planing asphaltic pavement, superpave
asphaltic concrete overlay and related work.
Estimated Construction Cost: $2,335,256.14
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,929,115.09
2 06276 BARRIERE CONSTRUCTION CO., LLC. $1,977,669.39
3 02179 BOH BROS. CONSTRUCTION CO., LLC. $2,392,749.70
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
BARRIERE CONSTRUCTION CO., LLC.
- 3 -
BOH BROS. CONSTRUCTION CO., LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 10      SQYD 210.00 2,100.00 20.00 200.00 20.00 200.00    
202-02-H removal of guard rail 438      LNFT 4.50 1,971.00 4.00 1,752.00 4.00 1,752.00    
202-02-I removal of asphalt drives 10      EACH 275.00 2,750.00 300.00 3,000.00 15.00 150.00    
203-08 borrow (vehicular measurement) 1,597      CUYD 15.00 23,955.00 14.00 22,358.00 15.00 23,955.00    
203-08-A borrow (vehicular meas.)(selected soils) 2,322      CUYD 15.00 34,830.00 14.00 32,508.00 18.00 41,796.00    
204-02 temporary hay or straw bales 200      EACH 21.00 4,200.00 12.00 2,400.00 10.00 2,000.00    
204-06 temporary silt fencing 4,000      LNFT 3.00 12,000.00 2.00 8,000.00 1.50 6,000.00    
308-01-A in-place cement treated base course (12" thick) 82,976      SQYD 5.00 414,880.00 5.60 464,665.60 6.50 539,344.00    
308-02 removal of existing patches 1,710      SQYD 8.00 13,680.00 1.00 1,710.00 6.00 10,260.00    
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 10.00 5,000.00 32.00 16,000.00 15.00 7,500.00    
502-01 superpave asphaltic concrete 15,336.5    TON 57.00 874,180.50 62.00 950,863.00 80.00 1,226,920.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,224.9    TON 110.00 134,739.00 62.00 75,943.80 100.00 122,490.00    
509-01 cold planing asphaltic pavement 66,224      SQYD 1.40 92,713.60 0.01 662.24 1.00 66,224.00    
509-02 contractor retained reclaimed asphaltic pavement - 2,759      CUYD 0.10 - 275.90 1.00 - 2,759.00 10.00 - 27,590.00    
704-03 blocked out guard rail 300.0    LNFT 19.00 5,700.00 20.00 6,000.00 17.00 5,100.00    
704-07-A guard rail bridge attachments (single thrie beam) 75.0    LNFT 50.00 3,750.00 50.00 3,750.00 50.00 3,750.00    
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 60.00 6,000.00 60.00 6,000.00 60.00 6,000.00    
704-11-A guard rail end treatment (flared) 8      EACH 2,200.00 17,600.00 2,400.00 19,200.00 2,000.00 16,000.00    
707-04 asphaltic curb 80.0    LNFT 24.00 1,920.00 44.00 3,520.00 20.00 1,600.00    
713-01 temporary signs & barricades lump      LUMP 8,000.00 8,000.00 25,000.00 25,000.00 50,000.00 50,000.00    
713-03-A temporary pavement markings (4" width) 450      LNFT 0.16 72.00 0.20 90.00 0.10 45.00    
713-03-C temporary pavement markings (8" width) 300      LNFT 0.34 102.00 0.40 120.00 0.20 60.00    
713-03-E temporary pavement markings (24" width) 99      LNFT 1.00 99.00 1.00 99.00 0.60 59.40    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
19.530  MILE 135.00 2,636.55 5.00 97.65 10.00 195.30    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
15.264  MILE 330.00 5,037.12 5.00 76.32 10.00 152.64    
713-05-A temporary pavement markings (solid line)(4" width) 45.918  MILE 660.00 30,305.88 10.00 459.18 20.00 918.36    
713-06-A temporary pavement legends and symbols (arrow) 3      EACH 77.00 231.00 50.00 150.00 10.00 30.00    
713-06-C temporary pavement legends and symbols (only) 3      EACH 77.00 231.00 50.00 150.00 10.00 30.00    
727-01 mobilization lump      LUMP 125,000.00 125,000.00 190,000.00 190,000.00 200,000.00 200,000.00    
729-16-C object marker assembly (type 3) 70      EACH 82.00 5,740.00 80.00 5,600.00 75.00 5,250.00    
731-02 reflectorized raised pavement markers 955      EACH 5.00 4,775.00 6.00 5,730.00 6.00 5,730.00    
732-01-A plastic pavement striping (4" width) 150      LNFT 0.55 82.50 1.00 150.00 0.50 75.00    
732-01-C plastic pavement striping (8" width) 100      LNFT 1.10 110.00 2.00 200.00 1.00 100.00    
732-01-E plastic pavement striping (24" width) 33      LNFT 3.30 108.90 7.00 231.00 4.00 132.00    
732-02-A plastic pavement striping (solid line) (4" width) 15.306  MILE 2,500.00 38,265.00 2,700.00 41,326.20 2,600.00 39,795.60    
732-03-A plastic pavement striping (broken line)(4" width) 5.088  MILE 880.00 4,477.44 800.00 4,070.40 800.00 4,070.40    
732-04-A plastic pavement legends & symbols (arrow) 1      EACH 165.00 165.00 250.00 250.00 200.00 200.00    
732-04-C plastic pavement legends & symbols (only) 1      EACH 165.00 165.00 300.00 300.00 250.00 250.00    
735-01 mailboxes 100      EACH 13.00 1,300.00 1.00 100.00 1.00 100.00    
735-02 mailbox supports (single) 100      EACH 175.00 17,500.00 130.00 13,000.00 130.00 13,000.00    
739-01 hydro-seeding 4.15   ACRE 990.00 4,108.50 1,000.00 4,150.00 1,000.00 4,150.00    
740-01 construction layout lump      LUMP 13,000.00 13,000.00 30,000.00 30,000.00 6,000.00 6,000.00    
744-01 traffic control management lump      LUMP 10,000.00 10,000.00 37,000.00 37,000.00 6,000.00 6,000.00    
S-001 saw cutting of concrete/asphalt driveways and turnouts
(full depth)
591      LNFT 10.00 5,910.00 6.00 3,546.00 5.00 2,955.00    
                       
 CONTRACTOR TOTAL       1,929,115.09   1,977,669.39   2,392,749.70    