| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - BARRIERE CONSTRUCTION CO., LLC. |
- 3 - BOH BROS. CONSTRUCTION CO., LLC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
10   |
SQYD |
210.00 |
2,100.00 |
20.00 |
200.00 |
20.00 |
200.00 |
|
|
| 202-02-H |
removal of guard rail
|
438   |
LNFT |
4.50 |
1,971.00 |
4.00 |
1,752.00 |
4.00 |
1,752.00 |
|
|
| 202-02-I |
removal of asphalt drives
|
10   |
EACH |
275.00 |
2,750.00 |
300.00 |
3,000.00 |
15.00 |
150.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
1,597   |
CUYD |
15.00 |
23,955.00 |
14.00 |
22,358.00 |
15.00 |
23,955.00 |
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
2,322   |
CUYD |
15.00 |
34,830.00 |
14.00 |
32,508.00 |
18.00 |
41,796.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
200   |
EACH |
21.00 |
4,200.00 |
12.00 |
2,400.00 |
10.00 |
2,000.00 |
|
|
| 204-06 |
temporary silt fencing
|
4,000   |
LNFT |
3.00 |
12,000.00 |
2.00 |
8,000.00 |
1.50 |
6,000.00 |
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
82,976   |
SQYD |
5.00 |
414,880.00 |
5.60 |
464,665.60 |
6.50 |
539,344.00 |
|
|
| 308-02 |
removal of existing patches
|
1,710   |
SQYD |
8.00 |
13,680.00 |
1.00 |
1,710.00 |
6.00 |
10,260.00 |
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
10.00 |
5,000.00 |
32.00 |
16,000.00 |
15.00 |
7,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
15,336.5 |
TON |
57.00 |
874,180.50 |
62.00 |
950,863.00 |
80.00 |
1,226,920.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,224.9 |
TON |
110.00 |
134,739.00 |
62.00 |
75,943.80 |
100.00 |
122,490.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
66,224   |
SQYD |
1.40 |
92,713.60 |
0.01 |
662.24 |
1.00 |
66,224.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,759   |
CUYD |
0.10 |
- 275.90 |
1.00 |
- 2,759.00 |
10.00 |
- 27,590.00 |
|
|
| 704-03 |
blocked out guard rail
|
300.0 |
LNFT |
19.00 |
5,700.00 |
20.00 |
6,000.00 |
17.00 |
5,100.00 |
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
75.0 |
LNFT |
50.00 |
3,750.00 |
50.00 |
3,750.00 |
50.00 |
3,750.00 |
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
60.00 |
6,000.00 |
60.00 |
6,000.00 |
60.00 |
6,000.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,200.00 |
17,600.00 |
2,400.00 |
19,200.00 |
2,000.00 |
16,000.00 |
|
|
| 707-04 |
asphaltic curb
|
80.0 |
LNFT |
24.00 |
1,920.00 |
44.00 |
3,520.00 |
20.00 |
1,600.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
8,000.00 |
8,000.00 |
25,000.00 |
25,000.00 |
50,000.00 |
50,000.00 |
|
|
| 713-03-A |
temporary pavement markings (4" width)
|
450   |
LNFT |
0.16 |
72.00 |
0.20 |
90.00 |
0.10 |
45.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
300   |
LNFT |
0.34 |
102.00 |
0.40 |
120.00 |
0.20 |
60.00 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
99   |
LNFT |
1.00 |
99.00 |
1.00 |
99.00 |
0.60 |
59.40 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
19.530 |
MILE |
135.00 |
2,636.55 |
5.00 |
97.65 |
10.00 |
195.30 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
15.264 |
MILE |
330.00 |
5,037.12 |
5.00 |
76.32 |
10.00 |
152.64 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
45.918 |
MILE |
660.00 |
30,305.88 |
10.00 |
459.18 |
20.00 |
918.36 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
3   |
EACH |
77.00 |
231.00 |
50.00 |
150.00 |
10.00 |
30.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
3   |
EACH |
77.00 |
231.00 |
50.00 |
150.00 |
10.00 |
30.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
125,000.00 |
125,000.00 |
190,000.00 |
190,000.00 |
200,000.00 |
200,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
70   |
EACH |
82.00 |
5,740.00 |
80.00 |
5,600.00 |
75.00 |
5,250.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
955   |
EACH |
5.00 |
4,775.00 |
6.00 |
5,730.00 |
6.00 |
5,730.00 |
|
|
| 732-01-A |
plastic pavement striping (4" width)
|
150   |
LNFT |
0.55 |
82.50 |
1.00 |
150.00 |
0.50 |
75.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
100   |
LNFT |
1.10 |
110.00 |
2.00 |
200.00 |
1.00 |
100.00 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
33   |
LNFT |
3.30 |
108.90 |
7.00 |
231.00 |
4.00 |
132.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
15.306 |
MILE |
2,500.00 |
38,265.00 |
2,700.00 |
41,326.20 |
2,600.00 |
39,795.60 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
5.088 |
MILE |
880.00 |
4,477.44 |
800.00 |
4,070.40 |
800.00 |
4,070.40 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
1   |
EACH |
165.00 |
165.00 |
250.00 |
250.00 |
200.00 |
200.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
1   |
EACH |
165.00 |
165.00 |
300.00 |
300.00 |
250.00 |
250.00 |
|
|
| 735-01 |
mailboxes
|
100   |
EACH |
13.00 |
1,300.00 |
1.00 |
100.00 |
1.00 |
100.00 |
|
|
| 735-02 |
mailbox supports (single)
|
100   |
EACH |
175.00 |
17,500.00 |
130.00 |
13,000.00 |
130.00 |
13,000.00 |
|
|
| 739-01 |
hydro-seeding
|
4.15 |
ACRE |
990.00 |
4,108.50 |
1,000.00 |
4,150.00 |
1,000.00 |
4,150.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
13,000.00 |
13,000.00 |
30,000.00 |
30,000.00 |
6,000.00 |
6,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
37,000.00 |
37,000.00 |
6,000.00 |
6,000.00 |
|
|
| S-001 |
saw cutting of concrete/asphalt driveways and turnouts
(full depth) |
591   |
LNFT |
10.00 |
5,910.00 |
6.00 |
3,546.00 |
5.00 |
2,955.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,929,115.09 |
|
1,977,669.39 |
|
2,392,749.70 |
|
|
|