| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - BARBER BROS. CONTRACTING CO., L.L.C |
- 4 - BARRIERE CONSTRUCTION CO., LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-A |
removal of bridges (str.8322904961)
|
1   |
EACH |
6,600.00 |
6,600.00 |
10,000.00 |
10,000.00 |
6,000.00 |
6,000.00 |
10,000.00 |
10,000.00 |
| 202-02-H |
removal of guard rail
|
820   |
LNFT |
3.50 |
2,870.00 |
5.00 |
4,100.00 |
5.00 |
4,100.00 |
13.00 |
10,660.00 |
| 203-08 |
borrow (vehicular measurement)
|
985   |
CUYD |
13.00 |
12,805.00 |
5.00 |
4,925.00 |
25.00 |
24,625.00 |
22.00 |
21,670.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
5,101   |
CUYD |
10.00 |
51,010.00 |
5.00 |
25,505.00 |
18.00 |
91,818.00 |
22.00 |
112,222.00 |
| 204-02 |
temporary hay or straw bales
|
35   |
EACH |
33.00 |
1,155.00 |
15.00 |
525.00 |
25.00 |
875.00 |
17.00 |
595.00 |
| 204-06 |
temporary silt fencing
|
66,106   |
LNFT |
2.00 |
132,212.00 |
1.30 |
85,937.80 |
1.00 |
66,106.00 |
1.40 |
92,548.40 |
| 303-02 |
removal of existing patches
|
2,200   |
SQYD |
20.00 |
44,000.00 |
2.00 |
4,400.00 |
15.00 |
33,000.00 |
9.00 |
19,800.00 |
| 502-01 |
superpave asphaltic concrete
|
18,446.5 |
TON |
58.00 |
1,069,897.00 |
60.00 |
1,106,790.00 |
68.00 |
1,254,362.00 |
83.00 |
1,531,059.50 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,208.6 |
TON |
110.00 |
242,946.00 |
60.00 |
132,516.00 |
100.00 |
220,860.00 |
83.00 |
183,313.80 |
| 509-01 |
cold planing asphaltic pavement
|
74,257   |
SQYD |
1.50 |
111,385.50 |
2.00 |
148,514.00 |
2.00 |
148,514.00 |
3.50 |
259,899.50 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 3,093   |
CUYD |
0.10 |
- 309.30 |
0.01 |
- 30.93 |
0.00 |
0.00 |
5.00 |
- 15,465.00 |
| 701-01-I/K |
cross drain pipe (24" rcp/pcp or 30" cmp)
|
300   |
LNFT |
160.00 |
48,000.00 |
275.00 |
82,500.00 |
260.00 |
78,000.00 |
180.00 |
54,000.00 |
| 701-01-K/M |
cross drain pipe (30" rcp/pcp or 36" cmp)
|
148   |
LNFT |
190.00 |
28,120.00 |
280.00 |
41,440.00 |
275.00 |
40,700.00 |
220.00 |
32,560.00 |
| 701-01-O/P |
cross drain pipe (48" rcp/pcp or 54" cmp)
|
52   |
LNFT |
260.00 |
13,520.00 |
375.00 |
19,500.00 |
360.00 |
18,720.00 |
300.00 |
15,600.00 |
| 701-02-E |
cross drain pipe arch (30" equiv. rcpa)
|
8   |
LNFT |
220.00 |
1,760.00 |
300.00 |
2,400.00 |
300.00 |
2,400.00 |
250.00 |
2,000.00 |
| 701-02-L/N |
cross drain pipe arch (72" equiv. rcpa or 84" equiv.
cmpa) |
200   |
LNFT |
500.00 |
100,000.00 |
700.00 |
140,000.00 |
650.00 |
130,000.00 |
550.00 |
110,000.00 |
| 701-05-K |
side drain pipe (30")
|
90   |
LNFT |
110.00 |
9,900.00 |
100.00 |
9,000.00 |
90.00 |
8,100.00 |
130.00 |
11,700.00 |
| 701-05-M |
side drain pipe (36")
|
190   |
LNFT |
140.00 |
26,600.00 |
120.00 |
22,800.00 |
100.00 |
19,000.00 |
150.00 |
28,500.00 |
| 701-05-O |
side drain pipe (48")
|
100   |
LNFT |
165.00 |
16,500.00 |
130.00 |
13,000.00 |
120.00 |
12,000.00 |
180.00 |
18,000.00 |
| 701-05-P |
side drain pipe (54")
|
125   |
LNFT |
140.00 |
17,500.00 |
150.00 |
18,750.00 |
150.00 |
18,750.00 |
220.00 |
27,500.00 |
| 701-06-I |
side drain pipe arch (54" equiv.)
|
125   |
LNFT |
200.00 |
25,000.00 |
160.00 |
20,000.00 |
160.00 |
20,000.00 |
230.00 |
28,750.00 |
| 701-15 |
concrete collar
|
1   |
EACH |
1,650.00 |
1,650.00 |
600.00 |
600.00 |
600.00 |
600.00 |
2,000.00 |
2,000.00 |
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
440.1 |
LNFT |
35.00 |
15,403.50 |
33.00 |
14,523.30 |
40.00 |
17,604.00 |
60.00 |
26,406.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
240.0 |
LNFT |
40.00 |
9,600.00 |
37.00 |
8,880.00 |
45.00 |
10,800.00 |
50.00 |
12,000.00 |
| 704-01-D |
guard rail (double thrie beam)(6'-3" post spacing)
|
66.0 |
LNFT |
37.00 |
2,442.00 |
35.00 |
2,310.00 |
40.00 |
2,640.00 |
60.00 |
3,960.00 |
| 704-03 |
blocked out guard rail
|
362.6 |
LNFT |
20.00 |
7,252.00 |
18.00 |
6,526.80 |
25.00 |
9,065.00 |
25.00 |
9,065.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
87.5 |
LNFT |
58.00 |
5,075.00 |
54.00 |
4,725.00 |
60.00 |
5,250.00 |
68.00 |
5,950.00 |
| 704-11-A |
guard rail end treatment (flared)
|
14   |
EACH |
2,000.00 |
28,000.00 |
1,900.00 |
26,600.00 |
2,500.00 |
35,000.00 |
2,500.00 |
35,000.00 |
| 707-04 |
asphaltic curb
|
80.0 |
LNFT |
30.00 |
2,400.00 |
60.00 |
4,800.00 |
50.00 |
4,000.00 |
60.00 |
4,800.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,500.00 |
9,500.00 |
100,000.00 |
100,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
50,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
36   |
LNFT |
0.70 |
25.20 |
0.50 |
18.00 |
2.00 |
72.00 |
1.00 |
36.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
18.780 |
MILE |
150.00 |
2,817.00 |
500.00 |
9,390.00 |
350.00 |
6,573.00 |
190.00 |
3,568.20 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.590 |
MILE |
330.00 |
2,504.70 |
10.00 |
75.90 |
400.00 |
3,036.00 |
330.00 |
2,504.70 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
64.650 |
MILE |
660.00 |
42,669.00 |
100.00 |
6,465.00 |
700.00 |
45,255.00 |
600.00 |
38,790.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
12,000.00 |
12,000.00 |
5,000.00 |
5,000.00 |
8,000.00 |
8,000.00 |
5,000.00 |
5,000.00 |
| 726-01 |
bedding material
|
237.6 |
CUYD |
88.00 |
20,908.80 |
60.00 |
14,256.00 |
65.00 |
15,444.00 |
90.00 |
21,384.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
210,000.00 |
210,000.00 |
109,000.00 |
109,000.00 |
50,000.00 |
50,000.00 |
390,000.00 |
390,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
58   |
EACH |
85.44 |
4,955.52 |
75.00 |
4,350.00 |
85.00 |
4,930.00 |
90.00 |
5,220.00 |
| 731-02 |
reflectorized raised pavement markers
|
827   |
EACH |
5.00 |
4,135.00 |
7.00 |
5,789.00 |
6.00 |
4,962.00 |
6.00 |
4,962.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
12   |
LNFT |
3.30 |
39.60 |
4.00 |
48.00 |
5.00 |
60.00 |
8.00 |
96.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
21.550 |
MILE |
2,500.00 |
53,875.00 |
2,900.00 |
62,495.00 |
3,000.00 |
64,650.00 |
3,000.00 |
64,650.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.530 |
MILE |
900.00 |
2,277.00 |
1,000.00 |
2,530.00 |
900.00 |
2,277.00 |
900.00 |
2,277.00 |
| 735-01 |
mailboxes
|
280   |
EACH |
1.10 |
308.00 |
1.00 |
280.00 |
2.00 |
560.00 |
7.00 |
1,960.00 |
| 735-02 |
mailbox supports (single)
|
280   |
EACH |
140.00 |
39,200.00 |
130.00 |
36,400.00 |
120.00 |
33,600.00 |
150.00 |
42,000.00 |
| 739-01 |
hydro-seeding
|
4.00 |
ACRE |
1,000.00 |
4,000.00 |
1,000.00 |
4,000.00 |
1,200.00 |
4,800.00 |
1,300.00 |
5,200.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
80,700.00 |
80,700.00 |
30,000.00 |
30,000.00 |
70,000.00 |
70,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
30,000.00 |
30,000.00 |
95,000.00 |
95,000.00 |
30,000.00 |
30,000.00 |
100,000.00 |
100,000.00 |
| 805-01-A |
class a concrete (pipe headwalls)
|
87.72 |
CUYD |
1,400.00 |
122,808.00 |
1,400.00 |
122,808.00 |
1,500.00 |
131,580.00 |
1,500.00 |
131,580.00 |
| 806-01 |
deformed reinforcing steel
|
5,074   |
LB |
2.00 |
10,148.00 |
2.25 |
11,416.50 |
2.50 |
12,685.00 |
2.50 |
12,685.00 |
| S-001 |
cement treated base course (12 in depth)
|
99,056   |
SQYD |
5.40 |
534,902.40 |
7.00 |
693,392.00 |
7.00 |
693,392.00 |
7.60 |
752,825.60 |
| S-002 |
u-channel post installation
|
110   |
EACH |
55.00 |
6,050.00 |
50.00 |
5,500.00 |
60.00 |
6,600.00 |
100.00 |
11,000.00 |
| S-003 |
cleaning existing ditches
|
3,000   |
LNFT |
9.00 |
27,000.00 |
12.00 |
36,000.00 |
12.00 |
36,000.00 |
9.00 |
27,000.00 |
| S-004 |
special anchor section
|
2   |
EACH |
1,100.00 |
2,200.00 |
1,200.00 |
2,400.00 |
1,500.00 |
3,000.00 |
1,000.00 |
2,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,205,616.92 |
|
3,368,850.37 |
|
3,520,365.00 |
|
4,398,832.70 |
|