| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - PRAIRIE CONTRACTORS INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
332   |
LNFT |
10.00 |
3,320.00 |
20.00 |
6,640.00 |
15.00 |
4,980.00 |
|
|
| 203-07 |
borrow (vehicular measurement)
|
500   |
CUYD |
21.00 |
10,500.00 |
25.00 |
12,500.00 |
20.00 |
10,000.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,179   |
CUYD |
50.00 |
108,950.00 |
85.00 |
185,215.00 |
100.00 |
217,900.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
5,798.2 |
TON |
85.00 |
492,847.00 |
85.00 |
492,847.00 |
85.00 |
492,847.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
104.5 |
TON |
160.00 |
16,720.00 |
125.00 |
13,062.50 |
180.00 |
18,810.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
916   |
SQYD |
10.00 |
9,160.00 |
33.00 |
30,228.00 |
7.50 |
6,870.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 23   |
CUYD |
0.10 |
- 2.30 |
0.01 |
- 0.23 |
0.01 |
- 0.23 |
|
|
| 510-01-B |
pavement patching (12" minimum thickness)
|
500   |
SQYD |
120.00 |
60,000.00 |
100.00 |
50,000.00 |
75.00 |
37,500.00 |
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
174   |
LNFT |
15.00 |
2,610.00 |
20.00 |
3,480.00 |
3.00 |
522.00 |
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
96   |
LNFT |
15.00 |
1,440.00 |
20.00 |
1,920.00 |
4.00 |
384.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
100.0 |
LNFT |
40.00 |
4,000.00 |
40.00 |
4,000.00 |
40.00 |
4,000.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
116.0 |
LNFT |
55.00 |
6,380.00 |
50.00 |
5,800.00 |
55.00 |
6,380.00 |
|
|
| 704-03 |
blocked out guard rail
|
125.0 |
LNFT |
20.00 |
2,500.00 |
20.00 |
2,500.00 |
20.00 |
2,500.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,200.00 |
8,800.00 |
2,000.00 |
8,000.00 |
2,300.00 |
9,200.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
4,200.00 |
4,200.00 |
25,000.00 |
25,000.00 |
18,000.00 |
18,000.00 |
|
|
| 713-03-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
2.780 |
MILE |
350.00 |
973.00 |
1,000.00 |
2,780.00 |
400.00 |
1,112.00 |
|
|
| 713-03-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.640 |
MILE |
900.00 |
2,376.00 |
1.00 |
2.64 |
1.00 |
2.64 |
|
|
| 713-04-A |
temporary pavement markings (solid line)(4" width)
|
0.128 |
MILE |
1,700.00 |
217.60 |
1.00 |
0.13 |
1.00 |
0.13 |
|
|
| 717-01 |
seeding
|
49   |
LB |
11.00 |
539.00 |
15.00 |
735.00 |
14.00 |
686.00 |
|
|
| 718-01 |
fertilizer
|
810   |
LB |
0.90 |
729.00 |
1.00 |
810.00 |
3.50 |
2,835.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
85,000.00 |
85,000.00 |
25,000.00 |
25,000.00 |
45,000.00 |
45,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
36   |
EACH |
66.00 |
2,376.00 |
60.00 |
2,160.00 |
70.00 |
2,520.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
78.00 |
312.00 |
80.00 |
320.00 |
80.00 |
320.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
367   |
EACH |
9.00 |
3,303.00 |
6.00 |
2,202.00 |
6.00 |
2,202.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.128 |
MILE |
5,000.00 |
640.00 |
3,000.00 |
384.00 |
3,500.00 |
448.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.640 |
MILE |
1,400.00 |
3,696.00 |
900.00 |
2,376.00 |
950.00 |
2,508.00 |
|
|
| 735-01 |
mailboxes
|
6   |
EACH |
1.25 |
7.50 |
1.00 |
6.00 |
5.00 |
30.00 |
|
|
| 735-02 |
mailbox supports (single)
|
6   |
EACH |
160.00 |
960.00 |
150.00 |
900.00 |
170.00 |
1,020.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
11,000.00 |
11,000.00 |
100.00 |
100.00 |
9,500.00 |
9,500.00 |
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
14,000.00 |
14,000.00 |
30,000.00 |
30,000.00 |
15,000.00 |
15,000.00 |
|
|
| S-127 |
sawcuts in asphaltic concrete lifts
|
270   |
LNFT |
7.00 |
1,890.00 |
10.00 |
2,700.00 |
4.00 |
1,080.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
859,443.80 |
|
911,668.04 |
|
914,156.54 |
|
|
|