| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - CERES ENVIRONMENTAL SERVICES,INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
61,000.00 |
61,000.00 |
|
|
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 105+00 to 105+56.39; 56.39' x
15' timber structure) |
1   |
EACH |
13,000.00 |
13,000.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
17,000.00 |
17,000.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
10   |
EACH |
26.00 |
260.00 |
|
|
|
|
|
|
| 204-03 |
temporary slope drains
|
100   |
LNFT |
60.00 |
6,000.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
365.00 |
1,460.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
140   |
LNFT |
4.00 |
560.00 |
|
|
|
|
|
|
| 302-01 |
class ii base course
|
355.4 |
CUYD |
90.00 |
31,986.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
31   |
CUYD |
90.00 |
2,790.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
282.2 |
TON |
160.00 |
45,152.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
12,000.00 |
12,000.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.20 |
ACRE |
5,800.00 |
1,160.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
7   |
LB |
62.00 |
434.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
241   |
LB |
7.05 |
1,699.05 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
115,000.00 |
115,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
85.00 |
340.00 |
|
|
|
|
|
|
| 729-19-B |
dead end road installations(type b)
|
1   |
EACH |
95.00 |
95.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
39,000.00 |
39,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
9,000.00 |
9,000.00 |
|
|
|
|
|
|
| 803-03 |
steel sheet pile wall
|
3,572   |
SQFT |
52.00 |
185,744.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
1,710   |
LNFT |
70.00 |
119,700.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
1   |
EACH |
12,500.00 |
12,500.00 |
|
|
|
|
|
|
| 805-10-A |
bridge superstructure & substructure (24' clr. rdwy.@
90 degree crossing) |
4   |
SPAN |
32,000.00 |
128,000.00 |
|
|
|
|
|
|
| S-101 |
concrete approach slabs (24' clr. rdwy.)(w/tapered
concrete barrier rails) |
2   |
EACH |
14,500.00 |
29,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
832,880.05 |
|
|
|
|
|
|
|