Letting of 5/30/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-58-0017
Parish: LAFOURCHE
Routes:
Description: CLOVELLY NO. 2 BRIDGE
Type Const: grading, class ii base course, superpave asphaltic concrete pavement, concrete
slab span bridge, and related work.
Estimated Construction Cost: $568,896.75
 
RankLicenseBidderConstruction Bid
1 45210 CERES ENVIRONMENTAL SERVICES,INC. $832,880.05
 
Item Number Item Description Quantity Unit of Measure - 1 -
CERES ENVIRONMENTAL SERVICES,INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 61,000.00 61,000.00            
202-02-A-01 removal of bridge (sta. 105+00 to 105+56.39; 56.39' x
15' timber structure)
1      EACH 13,000.00 13,000.00            
203-06 excavation & embankment lump      LUMP 17,000.00 17,000.00            
204-02 temporary hay or straw bales 10      EACH 26.00 260.00            
204-03 temporary slope drains 100      LNFT 60.00 6,000.00            
204-05-A temporary sediment check dams (hay) 4      EACH 365.00 1,460.00            
204-06 temporary silt fencing 140      LNFT 4.00 560.00            
302-01 class ii base course 355.4    CUYD 90.00 31,986.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
31      CUYD 90.00 2,790.00            
502-01 superpave asphaltic concrete 282.2    TON 160.00 45,152.00            
713-01 temporary signs & barricades lump      LUMP 12,000.00 12,000.00            
716-01-A mulch (vegetative) 0.20   ACRE 5,800.00 1,160.00            
717-01 seeding 7      LB 62.00 434.00            
718-01 fertilizer 241      LB 7.05 1,699.05            
727-01 mobilization lump      LUMP 115,000.00 115,000.00            
729-16-C object marker assembly (type 3) 4      EACH 85.00 340.00            
729-19-B dead end road installations(type b) 1      EACH 95.00 95.00            
740-01 construction layout lump      LUMP 39,000.00 39,000.00            
744-01 traffic control management lump      LUMP 9,000.00 9,000.00            
803-03 steel sheet pile wall 3,572      SQFT 52.00 185,744.00            
804-01-B precast concrete piles (14") 1,710      LNFT 70.00 119,700.00            
804-12 loading permanent piles 1      EACH 12,500.00 12,500.00            
805-10-A bridge superstructure & substructure (24' clr. rdwy.@
90 degree crossing)
4      SPAN 32,000.00 128,000.00            
S-101 concrete approach slabs (24' clr. rdwy.)(w/tapered
concrete barrier rails)
2      EACH 14,500.00 29,000.00            
                       
 CONTRACTOR TOTAL       832,880.05            