Letting of 5/30/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 713-16-0109
Parish: DESOTO
Routes:
Description: DAW ROAD BRIDGE OVER SIPHORIEN BAYOU
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, and related work.
Estimated Construction Cost: $211,886.50
 
RankLicenseBidderConstruction Bid
1 40615 SPECIALTY TRACKHOE & DOZER SERV.INC $164,630.00
2 44111 CONSTRUCTING SOLUTIONS LLC $175,224.50
3 12135 BLOUNT BROS. CONSTRUCTION, INC. $212,163.00
4 36374 BEST-YET BUILDERS, LLC $225,241.50
5 18546 C W & W CONTRACTORS, INC. $249,327.50
6 32044 QUALITY DESIGN & CONSTRUCTION, INC. $251,040.40
 
Item Number Item Description Quantity Unit of Measure - 1 -
SPECIALTY TRACKHOE & DOZER SERV.INC
- 2 -
CONSTRUCTING SOLUTIONS LLC
- 3 -
BLOUNT BROS. CONSTRUCTION, INC.
- 4 -
BEST-YET BUILDERS, LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 4,000.00 4,000.00 7,000.00 7,000.00 10,000.00 10,000.00 5,000.00 5,000.00
202-02-I removal of tank car (sta.105+08, 113" dia. x 41' long) lump      lump 3,000.00 3,000.00 10,000.00 10,000.00 15,000.00 15,000.00 3,500.00 3,500.00
203-06 excavation & embankment lump      LUMP 13,000.00 13,000.00 10,000.00 10,000.00 15,000.00 15,000.00 10,000.00 10,000.00
204-02 temporary hay or straw bales 15      EACH 15.00 225.00 20.00 300.00 20.00 300.00 12.00 180.00
204-05-A temporary sediment check dams (hay) 4      EACH 150.00 600.00 150.00 600.00 250.00 1,000.00 175.00 700.00
204-06 temporary silt fencing 600      LNFT 2.00 1,200.00 3.00 1,800.00 3.00 1,800.00 2.75 1,650.00
302-01 class ii base course 117.9    CUYD 80.00 9,432.00 85.00 10,021.50 70.00 8,253.00 55.00 6,484.50
401-02 aggregate surface course (adjusted vehicular
measurement)
15      CUYD 100.00 1,500.00 100.00 1,500.00 60.00 900.00 50.00 750.00
502-01 superpave asphaltic concrete 91.3    TON 150.00 13,695.00 150.00 13,695.00 100.00 9,130.00 100.00 9,130.00
701-01-W/Y cross drain pipe (96" rcp or 108" cmp) 204      LNFT 280.00 57,120.00 325.00 66,300.00 350.00 71,400.00 650.00 132,600.00
705-01 barbed wire fence 100      LNFT 12.00 1,200.00 10.00 1,000.00 10.00 1,000.00 22.00 2,200.00
712-02-A sacked concrete revetment(slope protection & headwalls) 204      SQYD 88.00 17,952.00 75.00 15,300.00 80.00 16,320.00 95.00 19,380.00
713-01 temporary signs & barricades lump      LUMP 8,000.00 8,000.00 7,500.00 7,500.00 10,000.00 10,000.00 5,000.00 5,000.00
716-01-A mulch (vegetative) 0.12   ACRE 5,000.00 600.00 4,000.00 480.00 1,000.00 120.00 1,150.00 138.00
717-01 seeding 6      LB 40.00 240.00 60.00 360.00 10.00 60.00 7.00 42.00
718-01 fertilizer 122      LB 1.00 122.00 5.00 610.00 1.00 122.00 1.00 122.00
726-01 bedding material 189.3    CUYD 80.00 15,144.00 60.00 11,358.00 60.00 11,358.00 50.00 9,465.00
727-01 mobilization lump      LUMP 10,000.00 10,000.00 10,000.00 10,000.00 15,000.00 15,000.00 10,000.00 10,000.00
729-16-B object marker assembly (type 2) 4      EACH 150.00 600.00 100.00 400.00 100.00 400.00 100.00 400.00
740-01 construction layout lump      LUMP 4,000.00 4,000.00 5,000.00 5,000.00 15,000.00 15,000.00 5,000.00 5,000.00
S-001 placement of existing large rock lump      LUMP 3,000.00 3,000.00 2,000.00 2,000.00 10,000.00 10,000.00 3,500.00 3,500.00
                       
 CONTRACTOR TOTAL       164,630.00   175,224.50   212,163.00   225,241.50
 
Item Number Item Description Quantity Unit of Measure - 5 -
C W & W CONTRACTORS, INC.
- 6 -
QUALITY DESIGN & CONSTRUCTION, INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 5,000.00 5,000.00 6,100.00 6,100.00        
202-02-I removal of tank car (sta.105+08, 113" dia. x 41' long) lump      lump 10,000.00 10,000.00 7,100.00 7,100.00        
203-06 excavation & embankment lump      LUMP 27,000.00 27,000.00 8,200.00 8,200.00        
204-02 temporary hay or straw bales 15      EACH 1.00 15.00 14.00 210.00        
204-05-A temporary sediment check dams (hay) 4      EACH 100.00 400.00 180.00 720.00        
204-06 temporary silt fencing 600      LNFT 3.00 1,800.00 2.00 1,200.00        
302-01 class ii base course 117.9    CUYD 100.00 11,790.00 131.00 15,444.90        
401-02 aggregate surface course (adjusted vehicular
measurement)
15      CUYD 100.00 1,500.00 125.00 1,875.00        
502-01 superpave asphaltic concrete 91.3    TON 225.00 20,542.50 265.00 24,194.50        
701-01-W/Y cross drain pipe (96" rcp or 108" cmp) 204      LNFT 475.00 96,900.00 550.00 112,200.00        
705-01 barbed wire fence 100      LNFT 15.00 1,500.00 7.50 750.00        
712-02-A sacked concrete revetment(slope protection & headwalls) 204      SQYD 90.00 18,360.00 69.00 14,076.00        
713-01 temporary signs & barricades lump      LUMP 6,000.00 6,000.00 11,300.00 11,300.00        
716-01-A mulch (vegetative) 0.12   ACRE 5,000.00 600.00 6,000.00 720.00        
717-01 seeding 6      LB 80.00 480.00 11.00 66.00        
718-01 fertilizer 122      LB 5.00 610.00 3.20 390.40        
726-01 bedding material 189.3    CUYD 100.00 18,930.00 152.00 28,773.60        
727-01 mobilization lump      LUMP 20,000.00 20,000.00 8,000.00 8,000.00        
729-16-B object marker assembly (type 2) 4      EACH 100.00 400.00 80.00 320.00        
740-01 construction layout lump      LUMP 5,000.00 5,000.00 5,600.00 5,600.00        
S-001 placement of existing large rock lump      LUMP 2,500.00 2,500.00 3,800.00 3,800.00        
                       
 CONTRACTOR TOTAL       249,327.50   251,040.40        