Lead Project: 450-10-0142
Parish: E BATON ROUGE
Routes: I-10
Description: I-10 WESTBOUND RAMP TO MISSISSIPPI BRIDGE(COLLISION REPAIRS)
Type Const: repair concrete deck, curb and barrier, clean and paint steel girders, install new
light pole, and related work.
Estimated Construction Cost: $294,285.00
 
RankLicenseBidderConstruction Bid
1 26435 C.E.C., INC. $294,516.50
2 45210 CERES ENVIRONMENTAL SERVICES,INC. $438,314.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
C.E.C., INC.
- 2 -
CERES ENVIRONMENTAL SERVICES,INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
713-01 temporary signs and barricades lump      LUMP 25,000.00 25,000.00 107,000.00 107,000.00        
727-01 mobilization lump      LUMP 14,000.00 14,000.00 75,000.00 75,000.00        
731-02 reflectorized raised pavement markers 4      EACH 10.00 40.00 20.00 80.00        
732-02-A plastic pavement striping (solid line)(4"width) 0.009  MILE 6,000.00 54.00 7,200.00 64.80        
732-03-A plastic pavement striping (broke line)(4" width) 0.009  MILE 2,500.00 22.50 7,200.00 64.80        
744-01 traffic control management lump      LUMP 2,000.00 2,000.00 53,000.00 53,000.00        
805-01-D class a concrete (footing) 1.00   CUYD 4,000.00 4,000.00 2,500.00 2,500.00        
806-01 deformed reinforcing steel 15      LB 10.00 150.00 4.00 60.00        
807-06 structural metalwork lump      LUMP 5,000.00 5,000.00 30,000.00 30,000.00        
S-101 aluminum railing 500      LNFT 140.00 70,000.00 90.00 45,000.00        
S-102 clean and paint steel girders 155      LNFT 150.00 23,250.00 64.00 9,920.00        
S-103 clean and repair concrete 65      SQYD 1,600.00 104,000.00 225.00 14,625.00        
S-104 truck mounted impact attenuator (construction zone) 1      EACH 9,000.00 9,000.00 15,000.00 15,000.00        
S-105 dynamic message sign unit 8      EACH 3,500.00 28,000.00 9,000.00 72,000.00        
S-106 install new light pole 1      EACH 10,000.00 10,000.00 14,000.00 14,000.00        
                       
 CONTRACTOR TOTAL       294,516.50   438,314.60        