Letting of 5/30/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 428-03-0012
Parish: ST CHARLES
Routes: LA 3127
Description: LA 3127 (JCT. LA 3141 - C.S.L.M. 10.13)
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete overlay,
and related work.
Estimated Construction Cost: $2,442,119.75
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $1,849,114.00
2 06487 HUEY STOCKSTILL, INC. $2,095,290.35
3 02179 BOH BROS. CONSTRUCTION CO., LLC. $2,310,221.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
HUEY STOCKSTILL, INC.
- 3 -
BOH BROS. CONSTRUCTION CO., LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
203-07 borrow (vehicular measurement) 1,200      CUYD 10.00 12,000.00 28.00 33,600.00 15.00 18,000.00    
502-01 superpave asphaltic concrete 18,687.5    TON 62.00 1,158,625.00 76.00 1,420,250.00 80.00 1,495,000.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
130.0    TON 100.00 13,000.00 76.00 9,880.00 80.00 10,400.00    
509-01 cold planing asphaltic pavement 203,653      SQYD 1.00 203,653.00 1.55 315,662.15 2.00 407,306.00    
509-02 contractor retained reclaimed asphaltic pavement - 8,486      CUYD 10.00 - 84,860.00 10.00 - 84,860.00 10.00 - 84,860.00    
510-01-B pavement patching (12" minimum thickness) 2,000      SQYD 66.00 132,000.00 100.00 200,000.00 60.00 120,000.00    
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 30,000.00 30,000.00 45,000.00 45,000.00    
713-03-A temporary pavement markings (broken line) (4" width)
(4' length)
14.440  MILE 100.00 1,444.00 300.00 4,332.00 25.00 361.00    
713-03-B temporary pavement markings (broken line) (4" width)
(10' length)
14.440  MILE 400.00 5,776.00 10.00 144.40 25.00 361.00    
713-04-A temporary pavement markings (solid line) (4" width) 28.880  MILE 600.00 17,328.00 10.00 288.80 50.00 1,444.00    
727-01 mobilization lump      LUMP 165,000.00 165,000.00 60,000.00 60,000.00 200,000.00 200,000.00    
731-02 reflectorized raised pavement markers 2,030      EACH 5.00 10,150.00 5.50 11,165.00 5.25 10,657.50    
732-01-C plastic pavement striping (8" width) 600      LNFT 1.00 600.00 1.00 600.00 1.00 600.00    
732-02-A plastic pavement striping (solid line) (4" width) 28.880  MILE 2,800.00 80,864.00 2,700.00 77,976.00 2,500.00 72,200.00    
732-03-A plastic pavement striping (broken line) (4" width) 14.440  MILE 850.00 12,274.00 800.00 11,552.00 800.00 11,552.00    
732-04-A plastic pavement legends & symbols (arrow) 3      EACH 200.00 600.00 200.00 600.00 200.00 600.00    
732-04-C plastic pavement legends & symbols (only) 3      EACH 220.00 660.00 200.00 600.00 200.00 600.00    
740-01 construction layout lump      LUMP 20,000.00 20,000.00 3,500.00 3,500.00 1,000.00 1,000.00    
                       
 CONTRACTOR TOTAL       1,849,114.00   2,095,290.35   2,310,221.50    