Letting of 5/30/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 203-02-0021
Parish: EVANGELINE
Routes: LA 29
Description: W. JCT. LA 95 - S. JCT. LA 104
Type Const: cold planing asphaltic concrete, superpave asphaltic concrete overlay, pavement
patching, pavement widening and related work
Estimated Construction Cost: $2,669,655.64
 
RankLicenseBidderConstruction Bid
1 34356 PRAIRIE CONTRACTORS INC. $2,339,288.71
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,360,445.30
3 12312 GILCHRIST CONSTRUCTION CO. LLC $2,515,302.19
4 04089 H & S CONSTRUCTION CO., INC. $2,868,839.31
 
Item Number Item Description Quantity Unit of Measure - 1 -
PRAIRIE CONTRACTORS INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
H & S CONSTRUCTION CO., INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks and drives 70      SQYD 50.00 3,500.00 34.00 2,380.00 30.00 2,100.00 27.50 1,925.00
202-02-I removal of headwalls 2      EACH 1,000.00 2,000.00 2,400.00 4,800.00 4,200.00 8,400.00 3,300.00 6,600.00
202-02-J removal of catch basins 1      EACH 1,000.00 1,000.00 1,700.00 1,700.00 4,200.00 4,200.00 1,100.00 1,100.00
202-02-K removal of 30" rcp cross drain (end joints) 16      LNFT 40.00 640.00 300.00 4,800.00 140.00 2,240.00 55.00 880.00
203-08 borrow (vehicular meas.) 100      CUYD 25.00 2,500.00 43.00 4,300.00 26.00 2,600.00 19.30 1,930.00
204-02 temporary hay or straw bales 14      EACH 100.00 1,400.00 50.00 700.00 15.00 210.00 20.00 280.00
204-05-A temporary sediment check dams (hay) 50      EACH 200.00 10,000.00 100.00 5,000.00 165.00 8,250.00 120.00 6,000.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,995      CUYD 30.00 59,850.00 22.00 43,890.00 92.00 183,540.00 45.00 89,775.00
502-01 superpave asphaltic concrete 14,369.6    TON 85.50 1,228,600.80 82.00 1,178,307.20 83.00 1,192,676.80 85.00 1,221,416.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,010.0    TON 55.00 55,550.00 150.00 151,500.00 150.00 151,500.00 120.00 121,200.00
509-01 cold planing asphaltic pavement 55,097      SQYD 1.85 101,929.45 2.00 110,194.00 1.25 68,871.25 2.50 137,742.50
509-02 contractor retained reclaimed asphaltic pavement - 2,296      CUYD 0.01 - 22.96 0.10 - 229.60 0.01 - 22.96 0.01 - 22.96
701-03-G storm drain pipe (18" rcp/pcp) 32      LNFT 250.00 8,000.00 220.00 7,040.00 230.00 7,360.00 148.50 4,752.00
701-08 relaying pipe 16      LNFT 250.00 4,000.00 220.00 3,520.00 240.00 3,840.00 93.50 1,496.00
701-10-K reinforced concrete pipe (extension)(30") 16      LNFT 250.00 4,000.00 250.00 4,000.00 250.00 4,000.00 275.00 4,400.00
701-15 concrete collar 6      EACH 1,300.00 7,800.00 1,500.00 9,000.00 1,400.00 8,400.00 1,650.00 9,900.00
702-03-A catch basins (cb-01) 1      EACH 5,000.00 5,000.00 4,500.00 4,500.00 4,000.00 4,000.00 4,950.00 4,950.00
702-03-B catch basins (cb-02) 1      EACH 6,000.00 6,000.00 5,500.00 5,500.00 5,200.00 5,200.00 7,150.00 7,150.00
706-02-C concrete drive (6" thick) 10.0    SQYD 200.00 2,000.00 120.00 1,200.00 125.00 1,250.00 175.00 1,750.00
713-01 temporary signs & barricades lump      LUMP 50,000.00 50,000.00 8,000.00 8,000.00 25,000.00 25,000.00 38,500.00 38,500.00
713-03-E temporary pavement markings (24" width) 96      LNFT 1.00 96.00 0.75 72.00 0.91 87.36 0.88 84.48
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
9.360  MILE 1,400.00 13,104.00 220.00 2,059.20 300.00 2,808.00 531.00 4,970.16
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
7.624  MILE 1.00 7.62 325.00 2,477.80 1.00 7.62 434.50 3,312.63
713-05-A temporary pavement markings (solid line)(4" width) 26.296  MILE 1.00 26.30 650.00 17,092.40 1.00 26.30 753.50 19,814.04
713-06-E temporary pavement legends and symbols (school
crossing)
4      EACH 1.00 4.00 330.00 1,320.00 1.00 4.00 220.00 880.00
724-01-C pavement patching (15" minimum thickness) 100      SQYD 150.00 15,000.00 250.00 25,000.00 140.00 14,000.00 145.00 14,500.00
724-02 pavement widening 12,232.5    SQYD 45.00 550,462.50 40.00 489,300.00 46.00 562,695.00 65.00 795,112.50
726-01 bedding material 26.9    CUYD 110.00 2,959.00 125.00 3,362.50 115.00 3,093.50 104.50 2,811.05
727-01 mobilization lump      LUMP 150,000.00 150,000.00 200,000.00 200,000.00 85,000.00 85,000.00 200,000.00 200,000.00
729-16-B object marker assembly (type 2) 6      EACH 60.00 360.00 60.00 360.00 65.00 390.00 75.00 450.00
731-02 reflectorized raised pavement markers 631      EACH 6.00 3,786.00 5.00 3,155.00 6.00 3,786.00 5.61 3,539.91
732-01-E plastic pavement striping (24" width) 48      LNFT 4.00 192.00 3.50 168.00 4.50 216.00 4.29 205.92
732-02-A plastic pavement striping (solid line) (4" width) 13.148  MILE 2,500.00 32,870.00 2,500.00 32,870.00 3,000.00 39,444.00 2,920.50 38,398.73
732-03-A plastic pavement striping (broken line)(4" width) 3.812  MILE 1,000.00 3,812.00 900.00 3,430.80 860.00 3,278.32 816.20 3,111.35
732-04-E plastic pavement legends & symbols (school crossing) 2      EACH 600.00 1,200.00 550.00 1,100.00 490.00 980.00 467.50 935.00
732-05 removal of existing markings 0.027  MILE 6,000.00 162.00 5,500.00 148.50 23,000.00 621.00 25,000.00 675.00
735-01 mailboxes 50      EACH 2.00 100.00 1.25 62.50 5.00 250.00 11.00 550.00
735-02 mailbox supports (single) 45      EACH 130.00 5,850.00 135.00 6,075.00 140.00 6,300.00 275.00 12,375.00
735-03 mailbox supports (double) 7      EACH 200.00 1,400.00 200.00 1,400.00 190.00 1,330.00 330.00 2,310.00
735-04 mailbox supports (multiple) 1      EACH 350.00 350.00 250.00 250.00 270.00 270.00 440.00 440.00
740-01 construction layout lump      LUMP 100.00 100.00 8,000.00 8,000.00 25,000.00 25,000.00 35,000.00 35,000.00
744-01 traffic control management lump      LUMP 100.00 100.00 10,000.00 10,000.00 80,000.00 80,000.00 65,000.00 65,000.00
S-001 full depth sawcutting of existing portland cement
concrete drives
1,200      INFT 3.00 3,600.00 2.20 2,640.00 1.75 2,100.00 2.20 2,640.00
                       
 CONTRACTOR TOTAL       2,339,288.71   2,360,445.30   2,515,302.19   2,868,839.31