| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PRAIRIE CONTRACTORS INC. |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - H & S CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks and drives
|
70   |
SQYD |
50.00 |
3,500.00 |
34.00 |
2,380.00 |
30.00 |
2,100.00 |
27.50 |
1,925.00 |
| 202-02-I |
removal of headwalls
|
2   |
EACH |
1,000.00 |
2,000.00 |
2,400.00 |
4,800.00 |
4,200.00 |
8,400.00 |
3,300.00 |
6,600.00 |
| 202-02-J |
removal of catch basins
|
1   |
EACH |
1,000.00 |
1,000.00 |
1,700.00 |
1,700.00 |
4,200.00 |
4,200.00 |
1,100.00 |
1,100.00 |
| 202-02-K |
removal of 30" rcp cross drain (end joints)
|
16   |
LNFT |
40.00 |
640.00 |
300.00 |
4,800.00 |
140.00 |
2,240.00 |
55.00 |
880.00 |
| 203-08 |
borrow (vehicular meas.)
|
100   |
CUYD |
25.00 |
2,500.00 |
43.00 |
4,300.00 |
26.00 |
2,600.00 |
19.30 |
1,930.00 |
| 204-02 |
temporary hay or straw bales
|
14   |
EACH |
100.00 |
1,400.00 |
50.00 |
700.00 |
15.00 |
210.00 |
20.00 |
280.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
50   |
EACH |
200.00 |
10,000.00 |
100.00 |
5,000.00 |
165.00 |
8,250.00 |
120.00 |
6,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,995   |
CUYD |
30.00 |
59,850.00 |
22.00 |
43,890.00 |
92.00 |
183,540.00 |
45.00 |
89,775.00 |
| 502-01 |
superpave asphaltic concrete
|
14,369.6 |
TON |
85.50 |
1,228,600.80 |
82.00 |
1,178,307.20 |
83.00 |
1,192,676.80 |
85.00 |
1,221,416.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,010.0 |
TON |
55.00 |
55,550.00 |
150.00 |
151,500.00 |
150.00 |
151,500.00 |
120.00 |
121,200.00 |
| 509-01 |
cold planing asphaltic pavement
|
55,097   |
SQYD |
1.85 |
101,929.45 |
2.00 |
110,194.00 |
1.25 |
68,871.25 |
2.50 |
137,742.50 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,296   |
CUYD |
0.01 |
- 22.96 |
0.10 |
- 229.60 |
0.01 |
- 22.96 |
0.01 |
- 22.96 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
32   |
LNFT |
250.00 |
8,000.00 |
220.00 |
7,040.00 |
230.00 |
7,360.00 |
148.50 |
4,752.00 |
| 701-08 |
relaying pipe
|
16   |
LNFT |
250.00 |
4,000.00 |
220.00 |
3,520.00 |
240.00 |
3,840.00 |
93.50 |
1,496.00 |
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
16   |
LNFT |
250.00 |
4,000.00 |
250.00 |
4,000.00 |
250.00 |
4,000.00 |
275.00 |
4,400.00 |
| 701-15 |
concrete collar
|
6   |
EACH |
1,300.00 |
7,800.00 |
1,500.00 |
9,000.00 |
1,400.00 |
8,400.00 |
1,650.00 |
9,900.00 |
| 702-03-A |
catch basins (cb-01)
|
1   |
EACH |
5,000.00 |
5,000.00 |
4,500.00 |
4,500.00 |
4,000.00 |
4,000.00 |
4,950.00 |
4,950.00 |
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
6,000.00 |
6,000.00 |
5,500.00 |
5,500.00 |
5,200.00 |
5,200.00 |
7,150.00 |
7,150.00 |
| 706-02-C |
concrete drive (6" thick)
|
10.0 |
SQYD |
200.00 |
2,000.00 |
120.00 |
1,200.00 |
125.00 |
1,250.00 |
175.00 |
1,750.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
50,000.00 |
50,000.00 |
8,000.00 |
8,000.00 |
25,000.00 |
25,000.00 |
38,500.00 |
38,500.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
96   |
LNFT |
1.00 |
96.00 |
0.75 |
72.00 |
0.91 |
87.36 |
0.88 |
84.48 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
9.360 |
MILE |
1,400.00 |
13,104.00 |
220.00 |
2,059.20 |
300.00 |
2,808.00 |
531.00 |
4,970.16 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
7.624 |
MILE |
1.00 |
7.62 |
325.00 |
2,477.80 |
1.00 |
7.62 |
434.50 |
3,312.63 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
26.296 |
MILE |
1.00 |
26.30 |
650.00 |
17,092.40 |
1.00 |
26.30 |
753.50 |
19,814.04 |
| 713-06-E |
temporary pavement legends and symbols (school
crossing) |
4   |
EACH |
1.00 |
4.00 |
330.00 |
1,320.00 |
1.00 |
4.00 |
220.00 |
880.00 |
| 724-01-C |
pavement patching (15" minimum thickness)
|
100   |
SQYD |
150.00 |
15,000.00 |
250.00 |
25,000.00 |
140.00 |
14,000.00 |
145.00 |
14,500.00 |
| 724-02 |
pavement widening
|
12,232.5 |
SQYD |
45.00 |
550,462.50 |
40.00 |
489,300.00 |
46.00 |
562,695.00 |
65.00 |
795,112.50 |
| 726-01 |
bedding material
|
26.9 |
CUYD |
110.00 |
2,959.00 |
125.00 |
3,362.50 |
115.00 |
3,093.50 |
104.50 |
2,811.05 |
| 727-01 |
mobilization
|
lump |
LUMP |
150,000.00 |
150,000.00 |
200,000.00 |
200,000.00 |
85,000.00 |
85,000.00 |
200,000.00 |
200,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
6   |
EACH |
60.00 |
360.00 |
60.00 |
360.00 |
65.00 |
390.00 |
75.00 |
450.00 |
| 731-02 |
reflectorized raised pavement markers
|
631   |
EACH |
6.00 |
3,786.00 |
5.00 |
3,155.00 |
6.00 |
3,786.00 |
5.61 |
3,539.91 |
| 732-01-E |
plastic pavement striping (24" width)
|
48   |
LNFT |
4.00 |
192.00 |
3.50 |
168.00 |
4.50 |
216.00 |
4.29 |
205.92 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.148 |
MILE |
2,500.00 |
32,870.00 |
2,500.00 |
32,870.00 |
3,000.00 |
39,444.00 |
2,920.50 |
38,398.73 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.812 |
MILE |
1,000.00 |
3,812.00 |
900.00 |
3,430.80 |
860.00 |
3,278.32 |
816.20 |
3,111.35 |
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
2   |
EACH |
600.00 |
1,200.00 |
550.00 |
1,100.00 |
490.00 |
980.00 |
467.50 |
935.00 |
| 732-05 |
removal of existing markings
|
0.027 |
MILE |
6,000.00 |
162.00 |
5,500.00 |
148.50 |
23,000.00 |
621.00 |
25,000.00 |
675.00 |
| 735-01 |
mailboxes
|
50   |
EACH |
2.00 |
100.00 |
1.25 |
62.50 |
5.00 |
250.00 |
11.00 |
550.00 |
| 735-02 |
mailbox supports (single)
|
45   |
EACH |
130.00 |
5,850.00 |
135.00 |
6,075.00 |
140.00 |
6,300.00 |
275.00 |
12,375.00 |
| 735-03 |
mailbox supports (double)
|
7   |
EACH |
200.00 |
1,400.00 |
200.00 |
1,400.00 |
190.00 |
1,330.00 |
330.00 |
2,310.00 |
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
350.00 |
350.00 |
250.00 |
250.00 |
270.00 |
270.00 |
440.00 |
440.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
100.00 |
100.00 |
8,000.00 |
8,000.00 |
25,000.00 |
25,000.00 |
35,000.00 |
35,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
100.00 |
100.00 |
10,000.00 |
10,000.00 |
80,000.00 |
80,000.00 |
65,000.00 |
65,000.00 |
| S-001 |
full depth sawcutting of existing portland cement
concrete drives |
1,200   |
INFT |
3.00 |
3,600.00 |
2.20 |
2,640.00 |
1.75 |
2,100.00 |
2.20 |
2,640.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,339,288.71 |
|
2,360,445.30 |
|
2,515,302.19 |
|
2,868,839.31 |
|