| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - RCS CONTRACTORS, INC. |
- 2 - CERES ENVIRONMENTAL SERVICES,INC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
4,500.00 |
4,500.00 |
45,000.00 |
45,000.00 |
|
|
|
|
| 202-02-B-01 |
removal of concrete box culvert (sta 10+85;5'x3'x30')
|
1   |
EACH |
4,000.00 |
4,000.00 |
29,000.00 |
29,000.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
166.2 |
SQYD |
5.50 |
914.10 |
12.00 |
1,994.40 |
|
|
|
|
| 202-02-01 |
removal of metal pipe (sta 10+80;30" cmp x 35')
|
1   |
EACH |
1,000.00 |
1,000.00 |
1,800.00 |
1,800.00 |
|
|
|
|
| 202-02-02 |
removal of concrete pipe (sta 10+76;24" equiv. rcpa x
35') |
1   |
EACH |
1,000.00 |
1,000.00 |
1,800.00 |
1,800.00 |
|
|
|
|
| 203-02 |
drainage excavation
|
47   |
CUYD |
10.00 |
470.00 |
38.00 |
1,786.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
423   |
CUYD |
20.00 |
8,460.00 |
32.00 |
13,536.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
7   |
EACH |
20.00 |
140.00 |
16.00 |
112.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
400   |
LNFT |
1.00 |
400.00 |
4.00 |
1,600.00 |
|
|
|
|
| 302-02-D-01 |
class ii base course (12" thick)(stone or recycled pcc
only) |
170.0 |
SQYD |
57.75 |
9,817.50 |
36.00 |
6,120.00 |
|
|
|
|
| 401-01 |
aggregate surface course (net section)
|
10.1 |
CUYD |
87.00 |
878.70 |
80.00 |
808.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
32.0 |
TON |
440.00 |
14,080.00 |
285.00 |
9,120.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
4.9 |
TON |
440.00 |
2,156.00 |
355.00 |
1,739.50 |
|
|
|
|
| 701-05-I |
side drain pipe (24" rcp)
|
180   |
LNFT |
64.00 |
11,520.00 |
120.00 |
21,600.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
18,500.00 |
18,500.00 |
11,000.00 |
11,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.039 |
MILE |
FREE |
FREE |
7,100.00 |
276.90 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
0.039 |
MILE |
FREE |
FREE |
5,900.00 |
230.10 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
0.116 |
MILE |
FREE |
FREE |
55,400.00 |
6,426.40 |
|
|
|
|
| 726-01 |
bedding material
|
201.1 |
CUYD |
85.00 |
17,093.50 |
70.00 |
14,077.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
32,755.00 |
32,755.00 |
55,000.00 |
55,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
3   |
EACH |
30.00 |
90.00 |
14.00 |
42.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.039 |
MILE |
12,500.00 |
487.50 |
15,500.00 |
604.50 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.013 |
MILE |
2,000.00 |
26.00 |
2,400.00 |
31.20 |
|
|
|
|
| 739-01 |
hydro-seeding
|
0.07 |
ACRE |
13,000.00 |
910.00 |
8,000.00 |
560.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
4,500.00 |
4,500.00 |
14,000.00 |
14,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
5,300.00 |
5,300.00 |
18,000.00 |
18,000.00 |
|
|
|
|
| 805-12-H-01 |
reinforced concrete box culverts (7'x 4')(precast only)
|
234.0 |
LNFT |
840.00 |
196,560.00 |
1,000.00 |
234,000.00 |
|
|
|
|
| S-001 |
dynamic message sign unit
|
2   |
EACH |
2,000.00 |
4,000.00 |
5,300.00 |
10,600.00 |
|
|
|
|
| S-002 |
cleaning existing ditches
|
16   |
LNFT |
50.00 |
800.00 |
40.00 |
640.00 |
|
|
|
|
| S-003 |
saw cutting asphaltic concrete pavement (6" deep)
|
44   |
LNFT |
5.00 |
220.00 |
46.00 |
2,024.00 |
|
|
|
|
| S-004 |
temporary base course (3 1/2" thick)
|
170.0 |
SQYD |
50.00 |
8,500.00 |
11.00 |
1,870.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
349,078.30 |
|
505,398.00 |
|
|
|
|
|