| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 2 - GILCHRIST CONSTRUCTION CO. LLC |
- 3 - H & S CONSTRUCTION CO., INC. |
- 4 - PRAIRIE CONTRACTORS INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
1,740   |
LNFT |
4.00 |
6,960.00 |
15.00 |
26,100.00 |
1.50 |
2,610.00 |
15.00 |
26,100.00 |
| 202-02-I |
removal of hmac patching
|
500   |
SQYD |
6.50 |
3,250.00 |
15.00 |
7,500.00 |
17.00 |
8,500.00 |
25.00 |
12,500.00 |
| 203-08 |
borrow (vehicular measurement)
|
382   |
CUYD |
25.00 |
9,550.00 |
25.00 |
9,550.00 |
14.00 |
5,348.00 |
15.00 |
5,730.00 |
| 302-02-E-01 |
class ii base course (4" thick) (crushed stone)
|
20,611.1 |
SQYD |
12.25 |
252,485.98 |
12.00 |
247,333.20 |
15.00 |
309,166.50 |
12.50 |
257,638.75 |
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
21,436   |
SQYD |
7.50 |
160,770.00 |
6.50 |
139,334.00 |
6.00 |
128,616.00 |
6.50 |
139,334.00 |
| 304-01 |
lime
|
280.48 |
TON |
145.00 |
40,669.60 |
145.00 |
40,669.60 |
169.00 |
47,401.12 |
140.00 |
39,267.20 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
22,260   |
SQYD |
3.25 |
72,345.00 |
1.70 |
37,842.00 |
3.00 |
66,780.00 |
3.75 |
83,475.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
6,244   |
CUYD |
45.00 |
280,980.00 |
92.00 |
574,448.00 |
35.00 |
218,540.00 |
47.00 |
293,468.00 |
| 502-01 |
superpave asphaltic concrete
|
23,520.1 |
TON |
68.00 |
1,599,366.80 |
78.00 |
1,834,567.80 |
80.00 |
1,881,608.00 |
89.50 |
2,105,048.95 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
315.0 |
TON |
120.00 |
37,800.00 |
180.00 |
56,700.00 |
139.00 |
43,785.00 |
150.00 |
47,250.00 |
| 509-01 |
cold planing asphaltic pavement
|
107,078   |
SQYD |
2.00 |
214,156.00 |
0.75 |
80,308.50 |
2.35 |
251,633.30 |
1.60 |
171,324.80 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 4,623   |
CUYD |
0.10 |
- 462.30 |
0.01 |
- 46.23 |
0.01 |
- 46.23 |
0.01 |
- 46.23 |
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
100   |
LNFT |
15.00 |
1,500.00 |
2.50 |
250.00 |
14.85 |
1,485.00 |
15.00 |
1,500.00 |
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
120   |
LNFT |
15.00 |
1,800.00 |
2.50 |
300.00 |
14.85 |
1,782.00 |
15.00 |
1,800.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
600.0 |
LNFT |
33.00 |
19,800.00 |
30.00 |
18,000.00 |
44.00 |
26,400.00 |
40.00 |
24,000.00 |
| 704-03 |
blocked out guard rail
|
475.0 |
LNFT |
19.00 |
9,025.00 |
15.00 |
7,125.00 |
23.10 |
10,972.50 |
20.00 |
9,500.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
57.00 |
11,400.00 |
58.00 |
11,600.00 |
60.50 |
12,100.00 |
55.00 |
11,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,200.00 |
17,600.00 |
2,000.00 |
16,000.00 |
2,200.00 |
17,600.00 |
2,000.00 |
16,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
9,000.00 |
9,000.00 |
12,000.00 |
12,000.00 |
40,000.00 |
40,000.00 |
50,000.00 |
50,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
72   |
LNFT |
0.66 |
47.52 |
1.00 |
72.00 |
1.05 |
75.60 |
1.00 |
72.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
22.440 |
MILE |
165.00 |
3,702.60 |
400.00 |
8,976.00 |
450.00 |
10,098.00 |
400.00 |
8,976.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
22.677 |
MILE |
300.00 |
6,803.10 |
1.00 |
22.68 |
434.50 |
9,853.16 |
1.00 |
22.68 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
47.352 |
MILE |
600.00 |
28,411.20 |
1.00 |
47.35 |
577.50 |
27,345.78 |
1.00 |
47.35 |
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
6   |
EACH |
220.00 |
1,320.00 |
1.00 |
6.00 |
220.00 |
1,320.00 |
1.00 |
6.00 |
| 717-01 |
seeding
|
9   |
LB |
28.00 |
252.00 |
15.00 |
135.00 |
35.00 |
315.00 |
30.00 |
270.00 |
| 718-01 |
fertilizer
|
150   |
LB |
6.00 |
900.00 |
5.00 |
750.00 |
2.00 |
300.00 |
10.00 |
1,500.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
8,000.00 |
8,000.00 |
25,000.00 |
25,000.00 |
9,500.00 |
9,500.00 |
3,500.00 |
3,500.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,500   |
SQYD |
100.00 |
150,000.00 |
68.00 |
102,000.00 |
105.00 |
157,500.00 |
100.00 |
150,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
200,000.00 |
200,000.00 |
125,000.00 |
125,000.00 |
200,000.00 |
200,000.00 |
250,000.00 |
250,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
9   |
EACH |
66.00 |
594.00 |
65.00 |
585.00 |
60.50 |
544.50 |
60.00 |
540.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
82.00 |
656.00 |
80.00 |
640.00 |
82.50 |
660.00 |
80.00 |
640.00 |
| 731-02 |
reflectorized raised pavement markers
|
989   |
EACH |
5.00 |
4,945.00 |
6.00 |
5,934.00 |
5.78 |
5,716.42 |
6.00 |
5,934.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
24   |
LNFT |
3.30 |
79.20 |
4.00 |
96.00 |
4.35 |
104.40 |
4.00 |
96.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
15.784 |
MILE |
2,500.00 |
39,460.00 |
2,800.00 |
44,195.20 |
2,915.00 |
46,010.36 |
2,500.00 |
39,460.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
7.559 |
MILE |
900.00 |
6,803.10 |
800.00 |
6,047.20 |
869.00 |
6,568.77 |
1,000.00 |
7,559.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
450.00 |
900.00 |
500.00 |
1,000.00 |
495.00 |
990.00 |
500.00 |
1,000.00 |
| 735-01 |
mailboxes
|
10   |
EACH |
11.00 |
110.00 |
1.00 |
10.00 |
11.00 |
110.00 |
2.00 |
20.00 |
| 735-02 |
mailbox supports (single)
|
10   |
EACH |
1,656.00 |
16,560.00 |
150.00 |
1,500.00 |
44.00 |
440.00 |
200.00 |
2,000.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
7,500.00 |
7,500.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
100.00 |
100.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
17,000.00 |
17,000.00 |
125,000.00 |
125,000.00 |
75,000.00 |
75,000.00 |
100.00 |
100.00 |
| S-127 |
sawcuts in asphaltic concrete lifts
|
220   |
LNFT |
7.00 |
1,540.00 |
3.00 |
660.00 |
7.15 |
1,573.00 |
8.00 |
1,760.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,243,579.80 |
|
3,592,258.30 |
|
3,648,306.18 |
|
3,768,493.50 |
|