| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - DENTON-JAMES LLC |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-C |
removal of portland cement concrete pavement
|
3,284   |
SQYD |
16.00 |
52,544.00 |
|
|
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
950.0 |
LNFT |
7.00 |
6,650.00 |
|
|
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
240,000.00 |
240,000.00 |
|
|
|
|
|
|
| 302-02-D-01 |
class ii base course (12" thick) crushed stone
|
3,284.2 |
SQYD |
40.00 |
131,368.00 |
|
|
|
|
|
|
| 601-01-O |
portland cement concrete pavement (12" thick)
|
3,284.2 |
SQYD |
100.00 |
328,420.00 |
|
|
|
|
|
|
| 702-04-A |
adjusting manholes
|
4   |
EACH |
1,500.00 |
6,000.00 |
|
|
|
|
|
|
| 702-04-B |
adjusting catch basins
|
8   |
EACH |
2,500.00 |
20,000.00 |
|
|
|
|
|
|
| 703-03 |
perforated pipe underdrains
|
3,060   |
LNFT |
8.00 |
24,480.00 |
|
|
|
|
|
|
| 703-04 |
nonperforated pipe underdrains
|
60   |
LNFT |
100.00 |
6,000.00 |
|
|
|
|
|
|
| 707-01 |
concrete curb
|
950.0 |
LNFT |
14.00 |
13,300.00 |
|
|
|
|
|
|
| 711-04 |
geotextile fabric
|
1,205   |
SQYD |
3.00 |
3,615.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
24   |
LNFT |
2.40 |
57.60 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
0.560 |
MILE |
1,300.00 |
728.00 |
|
|
|
|
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
1   |
EACH |
300.00 |
300.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
110,000.00 |
110,000.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
19   |
EACH |
7.00 |
133.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
24   |
LNFT |
5.00 |
120.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.560 |
MILE |
3,000.00 |
1,680.00 |
|
|
|
|
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
1   |
EACH |
650.00 |
650.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
3,000.00 |
3,000.00 |
|
|
|
|
|
|
| 805-06 |
class r concrete
|
547.33 |
CUYD |
300.00 |
164,199.00 |
|
|
|
|
|
|
| S-001 |
manhole (base flange)
|
2   |
EACH |
3,000.00 |
6,000.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,159,244.60 |
|
|
|
|
|
|
|