| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
- 3 - HUEY STOCKSTILL, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks and drives
|
1,075   |
SQYD |
13.00 |
13,975.00 |
15.00 |
16,125.00 |
17.00 |
18,275.00 |
|
|
| 202-02-K |
removal of existing railroad crossing
|
lump |
LUMP |
5,600.00 |
5,600.00 |
30,000.00 |
30,000.00 |
14,000.00 |
14,000.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
100   |
CUYD |
18.00 |
1,800.00 |
45.00 |
4,500.00 |
11.00 |
1,100.00 |
|
|
| 204-02 |
temporary hay or straw bales
|
35   |
EACH |
18.00 |
630.00 |
4.00 |
140.00 |
10.00 |
350.00 |
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
7   |
EACH |
40.00 |
280.00 |
125.00 |
875.00 |
140.00 |
980.00 |
|
|
| 302-02-A |
class ii base course (6" thick)
|
1,007   |
SQYD |
42.00 |
42,294.00 |
20.00 |
20,140.00 |
35.00 |
35,245.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
227   |
CUYD |
34.00 |
7,718.00 |
75.00 |
17,025.00 |
100.00 |
22,700.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
5,436.7 |
TON |
78.00 |
424,062.60 |
80.00 |
434,936.00 |
90.00 |
489,303.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
676.8 |
TON |
120.00 |
81,216.00 |
100.00 |
67,680.00 |
160.00 |
108,288.00 |
|
|
| 509-01 |
cold planing asphaltic pavement
|
31,717   |
SQYD |
2.35 |
74,534.95 |
3.00 |
95,151.00 |
4.00 |
126,868.00 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,269   |
CUYD |
0.01 |
- 12.69 |
1.00 |
- 1,269.00 |
6.00 |
- 7,614.00 |
|
|
| 706-02-C |
concrete drive (6" thick)
|
50.0 |
SQYD |
85.00 |
4,250.00 |
60.00 |
3,000.00 |
100.00 |
5,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
35,000.00 |
35,000.00 |
30,000.00 |
30,000.00 |
25,000.00 |
25,000.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
4.325 |
MILE |
485.44 |
2,099.53 |
60.00 |
259.50 |
200.00 |
865.00 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.304 |
MILE |
358.00 |
824.83 |
100.00 |
230.40 |
400.00 |
921.60 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
14.135 |
MILE |
633.00 |
8,947.46 |
200.00 |
2,827.00 |
800.00 |
11,308.00 |
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
8,500.00 |
8,500.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
1,200   |
SQYD |
131.00 |
157,200.00 |
60.00 |
72,000.00 |
200.00 |
240,000.00 |
|
|
| 724-02 |
pavement widening
|
1,956.5 |
SQYD |
52.00 |
101,738.00 |
55.00 |
107,607.50 |
50.00 |
97,825.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
50,000.00 |
50,000.00 |
110,000.00 |
110,000.00 |
75,000.00 |
75,000.00 |
|
|
| 729-16-B |
object marker assembly (type 2)
|
14   |
EACH |
66.00 |
924.00 |
60.00 |
840.00 |
65.00 |
910.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
311   |
EACH |
5.61 |
1,744.71 |
5.00 |
1,555.00 |
6.00 |
1,866.00 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
7.068 |
MILE |
2,695.00 |
19,048.26 |
2,500.00 |
17,670.00 |
2,500.00 |
17,670.00 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.152 |
MILE |
798.00 |
919.30 |
800.00 |
921.60 |
800.00 |
921.60 |
|
|
| 735-01 |
mailboxes
|
155   |
EACH |
10.00 |
1,550.00 |
1.00 |
155.00 |
10.00 |
1,550.00 |
|
|
| 735-02 |
mailbox supports (single)
|
39   |
EACH |
143.00 |
5,577.00 |
130.00 |
5,070.00 |
140.00 |
5,460.00 |
|
|
| 735-03 |
mailbox supports (double)
|
6   |
EACH |
220.00 |
1,320.00 |
200.00 |
1,200.00 |
200.00 |
1,200.00 |
|
|
| 735-04 |
mailbox supports (multiple)
|
28   |
EACH |
374.00 |
10,472.00 |
350.00 |
9,800.00 |
350.00 |
9,800.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
8,500.00 |
8,500.00 |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
50,000.00 |
50,000.00 |
|
|
| S-001 |
preparing shoulders
|
lump |
LUMP |
25,000.00 |
25,000.00 |
60,000.00 |
60,000.00 |
140,000.00 |
140,000.00 |
|
|
| S-002 |
full depth sawcutting of existing portland cement
concrete drives |
8,920   |
INFT |
1.38 |
12,309.60 |
1.00 |
8,920.00 |
1.70 |
15,164.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,133,022.55 |
|
1,157,359.00 |
|
1,534,956.20 |
|
|
|