Letting of 5/30/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 004-08-0032
Parish: ST MARY
Routes: LA 182
Description: E. C/L OF PATTERSON - CSLM 9.37
Type Const: cold planing, class ii base course, superpave asphaltic concrete overlay, pavement
patching, pavement widening and related work.
Estimated Construction Cost: $958,935.92
 
RankLicenseBidderConstruction Bid
1 04089 H & S CONSTRUCTION CO., INC. $1,133,022.55
2 06276 BARRIERE CONSTRUCTION CO., LLC $1,157,359.00
3 06487 HUEY STOCKSTILL, INC. $1,534,956.20
 
Item Number Item Description Quantity Unit of Measure - 1 -
H & S CONSTRUCTION CO., INC.
- 2 -
BARRIERE CONSTRUCTION CO., LLC
- 3 -
HUEY STOCKSTILL, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks and drives 1,075      SQYD 13.00 13,975.00 15.00 16,125.00 17.00 18,275.00    
202-02-K removal of existing railroad crossing lump      LUMP 5,600.00 5,600.00 30,000.00 30,000.00 14,000.00 14,000.00    
203-08 borrow (vehicular measurement) 100      CUYD 18.00 1,800.00 45.00 4,500.00 11.00 1,100.00    
204-02 temporary hay or straw bales 35      EACH 18.00 630.00 4.00 140.00 10.00 350.00    
204-05-A temporary sediment check dams (hay) 7      EACH 40.00 280.00 125.00 875.00 140.00 980.00    
302-02-A class ii base course (6" thick) 1,007      SQYD 42.00 42,294.00 20.00 20,140.00 35.00 35,245.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
227      CUYD 34.00 7,718.00 75.00 17,025.00 100.00 22,700.00    
502-01 superpave asphaltic concrete 5,436.7    TON 78.00 424,062.60 80.00 434,936.00 90.00 489,303.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
676.8    TON 120.00 81,216.00 100.00 67,680.00 160.00 108,288.00    
509-01 cold planing asphaltic pavement 31,717      SQYD 2.35 74,534.95 3.00 95,151.00 4.00 126,868.00    
509-02 contractor retained reclaimed asphaltic pavement - 1,269      CUYD 0.01 - 12.69 1.00 - 1,269.00 6.00 - 7,614.00    
706-02-C concrete drive (6" thick) 50.0    SQYD 85.00 4,250.00 60.00 3,000.00 100.00 5,000.00    
713-01 temporary signs & barricades lump      LUMP 35,000.00 35,000.00 30,000.00 30,000.00 25,000.00 25,000.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
4.325  MILE 485.44 2,099.53 60.00 259.50 200.00 865.00    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
2.304  MILE 358.00 824.83 100.00 230.40 400.00 921.60    
713-05-A temporary pavement markings (solid line)(4" width) 14.135  MILE 633.00 8,947.46 200.00 2,827.00 800.00 11,308.00    
722-02 project site laboratory (equipped) 1      EACH 8,500.00 8,500.00 10,000.00 10,000.00 5,000.00 5,000.00    
724-01-B pavement patching (12" minimum thickness) 1,200      SQYD 131.00 157,200.00 60.00 72,000.00 200.00 240,000.00    
724-02 pavement widening 1,956.5    SQYD 52.00 101,738.00 55.00 107,607.50 50.00 97,825.00    
727-01 mobilization lump      LUMP 50,000.00 50,000.00 110,000.00 110,000.00 75,000.00 75,000.00    
729-16-B object marker assembly (type 2) 14      EACH 66.00 924.00 60.00 840.00 65.00 910.00    
731-02 reflectorized raised pavement markers 311      EACH 5.61 1,744.71 5.00 1,555.00 6.00 1,866.00    
732-02-A plastic pavement striping (solid line) (4" width) 7.068  MILE 2,695.00 19,048.26 2,500.00 17,670.00 2,500.00 17,670.00    
732-03-A plastic pavement striping (broken line)(4" width) 1.152  MILE 798.00 919.30 800.00 921.60 800.00 921.60    
735-01 mailboxes 155      EACH 10.00 1,550.00 1.00 155.00 10.00 1,550.00    
735-02 mailbox supports (single) 39      EACH 143.00 5,577.00 130.00 5,070.00 140.00 5,460.00    
735-03 mailbox supports (double) 6      EACH 220.00 1,320.00 200.00 1,200.00 200.00 1,200.00    
735-04 mailbox supports (multiple) 28      EACH 374.00 10,472.00 350.00 9,800.00 350.00 9,800.00    
740-01 construction layout lump      LUMP 8,500.00 8,500.00 10,000.00 10,000.00 20,000.00 20,000.00    
744-01 traffic control management lump      LUMP 25,000.00 25,000.00 20,000.00 20,000.00 50,000.00 50,000.00    
S-001 preparing shoulders lump      LUMP 25,000.00 25,000.00 60,000.00 60,000.00 140,000.00 140,000.00    
S-002 full depth sawcutting of existing portland cement
concrete drives
8,920      INFT 1.38 12,309.60 1.00 8,920.00 1.70 15,164.00    
                       
 CONTRACTOR TOTAL       1,133,022.55   1,157,359.00   1,534,956.20    