| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - KIEWIT LOUISIANA CO |
- 2 - AMERICAN CONTRACTING & SERVICES,INC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
260,000.00 |
260,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
20,000.00 |
20,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
800,000.00 |
800,000.00 |
890,000.00 |
890,000.00 |
|
|
|
|
| 730-09 |
electrical system
|
lump |
LUMP |
1,950,000.00 |
1,950,000.00 |
1,675,000.00 |
1,675,000.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.020 |
MILE |
250,000.00 |
5,000.00 |
4,000.00 |
80.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line) (4" width)
|
0.010 |
MILE |
1,600.00 |
16.00 |
2,000.00 |
20.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
108,000.00 |
108,000.00 |
450,000.00 |
450,000.00 |
|
|
|
|
| 804-02-A |
treated timber piles (noncoastal treatment)
|
1,500   |
LNFT |
105.00 |
157,500.00 |
300.00 |
450,000.00 |
|
|
|
|
| 805-03 |
class aa concrete
|
22.40 |
CUYD |
5,075.00 |
113,680.00 |
10,000.00 |
224,000.00 |
|
|
|
|
| 805-09 |
expansion joint seal
|
280.00 |
LNFT |
5.25 |
1,470.00 |
200.00 |
56,000.00 |
|
|
|
|
| 805-11 |
strip seal joints
|
332.00 |
LNFT |
400.00 |
132,800.00 |
1,250.00 |
415,000.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
4,344   |
LB |
3.60 |
15,638.40 |
5.00 |
21,720.00 |
|
|
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
2,100,000.00 |
2,100,000.00 |
1,280,000.00 |
1,280,000.00 |
|
|
|
|
| 812-01-A |
treated timber (land and fresh water)
|
5.41 |
MFBM |
45,000.00 |
243,450.00 |
50,000.00 |
270,500.00 |
|
|
|
|
| S-100 |
architectual rehabilitation of all four bridge houses
|
lump |
lump |
568,000.00 |
568,000.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| S-101 |
patching of spalled concrete areas
|
21   |
each |
12,490.00 |
262,290.00 |
35,000.00 |
735,000.00 |
|
|
|
|
| S-102-A |
clean, dispose, inspect, and paint existing rivets
|
2,000   |
each |
30.00 |
60,000.00 |
75.00 |
150,000.00 |
|
|
|
|
| S-102-B |
remove & replace existing rivets with bolts
|
718   |
each |
279.00 |
200,322.00 |
160.00 |
114,880.00 |
|
|
|
|
| S-103 |
repair concrete girder cracks
|
43   |
each |
4,000.00 |
172,000.00 |
1,600.00 |
68,800.00 |
|
|
|
|
| S-104 |
seal steel span control joints
|
960.00 |
LNFT |
5.40 |
5,184.00 |
35.00 |
33,600.00 |
|
|
|
|
| S-105 |
cleaning and painting basqule lateral connections
|
96   |
SQFT |
1,440.00 |
138,240.00 |
90.00 |
8,640.00 |
|
|
|
|
| S-106 |
re-drill existing critical drain holes
|
360   |
EACH |
65.00 |
23,400.00 |
200.00 |
72,000.00 |
|
|
|
|
| S-107-A |
remove steel span joints and concrete
|
8   |
EACH |
20,000.00 |
160,000.00 |
15,000.00 |
120,000.00 |
|
|
|
|
| S-107-B |
remove steel span sidewalk joints and concrete
|
12   |
EACH |
4,000.00 |
48,000.00 |
8,000.00 |
96,000.00 |
|
|
|
|
| S-108 |
bearing stiffener removal
|
6   |
EACH |
400.00 |
2,400.00 |
1,500.00 |
9,000.00 |
|
|
|
|
| S-109 |
pile cap crack repair
|
lump |
LUMP |
40,000.00 |
40,000.00 |
12,000.00 |
12,000.00 |
|
|
|
|
| S-110 |
walkway lighting rehabilitation
|
lump |
LUMP |
375,000.00 |
375,000.00 |
350,000.00 |
350,000.00 |
|
|
|
|
| S-111 |
cleaning, washing, and sanitizing main pier interiors
|
lump |
LUMP |
210,000.00 |
210,000.00 |
235,000.00 |
235,000.00 |
|
|
|
|
| S-112 |
submarine cable
|
lump |
LUMP |
640,000.00 |
640,000.00 |
500,000.00 |
500,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
8,812,390.40 |
|
8,937,240.00 |
|
|
|
|
|