Go Back
 
Lead Project: 015-04-0039
Parish: GRANT, LASALLE
Routes: US 165
Description: GEORGETOWN- TULLOS
Type Const: drain struct, class ii bc, superpave acp (alt. a-1), pccp (alt. a-2), concrete slab
span bridges, prestressed concrete girder bridges and related work
Estimated Construction Cost: $43,652,436.84
Maximum Number of Days Allowed for Construction: 800
Calculated Daily User Cost: $3,200.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Life Cycle
Cost
Total Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $45,976,400.71 800 $1,643,900.00 $50,180,300.71
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $46,278,679.79 800 $1,643,900.00 $50,482,579.79
3 34567 JAMES CONSTRUCTION GROUP LLC $47,622,923.01 800 $688,300.00 $50,871,223.01
4 39462 DENTON-JAMES LLC $50,477,978.97 800 $688,300.00 $53,726,278.97
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
JAMES CONSTRUCTION GROUP LLC
- 4 -
DENTON-JAMES LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing and grubbing lump      lump 600,000.00 600,000.00 500,000.00 500,000.00 1,500,000.00 1,500,000.00 1,400,000.00 1,400,000.00
202-01 removal of structures & obstructions lump      lump 90,000.00 90,000.00 65,000.00 65,000.00 75,000.00 75,000.00 400,000.00 400,000.00
202-02-B-01 removal of concrete box culverts (sta. 13+339.40;
1524 m x 1219 m x 26.78 m)
1      ea 10,000.00 10,000.00 9,000.00 9,000.00 1,720.00 1,720.00 6,000.00 6,000.00
202-02-B-02 removal of concrete box culverts (sta. 14+772.41;
1829 m x 1829 m x 27.34 m)
1      ea 10,000.00 10,000.00 12,000.00 12,000.00 1,760.00 1,760.00 9,000.00 9,000.00
202-02-B-03 removal of concrete box culverts (sta. 17+669.95;
1219 m x 1219 m x 36.98 m)
1      ea 8,000.00 8,000.00 6,500.00 6,500.00 2,365.00 2,365.00 7,000.00 7,000.00
202-02-B-04 removal of concrete box culverts (sta. 19+339.61;
1219 m x 1219 m x 228.2 m)
1      ea 8,000.00 8,000.00 9,000.00 9,000.00 14,650.00 14,650.00 6,000.00 6,000.00
202-02-B-05 removal of concrete box culverts (sta. 19+496.63;
1524 m x 1524 m x 29.70 m)
1      ea 8,000.00 8,000.00 1,000.00 1,000.00 1,900.00 1,900.00 7,000.00 7,000.00
202-02-C removal of portland cement concrete pavement 23,060      sq m 7.50 172,950.00 11.00 253,660.00 2.00 46,120.00 8.00 184,480.00
202-02-D removal of concrete walks & drives 875      sq m 11.00 9,625.00 8.00 7,000.00 3.45 3,018.75 12.00 10,500.00
202-02-G removal of surfacing & stabilized base 30,904.3    sq m 5.50 169,973.65 3.50 108,165.05 2.00 61,808.60 5.00 154,521.50
202-02-H removal of guard rail 259      ln m 14.00 3,626.00 17.50 4,532.50 12.50 3,237.50 12.00 3,108.00
202-02-I removal of paved drains 1,420      sq m 8.00 11,360.00 9.00 12,780.00 10.00 14,200.00 11.00 15,620.00
202-02-01 removal of 6.4 m x 13.8 m concrete slab (rt. of sta.
10+883 on us 165)
1      ea 900.00 900.00 3,400.00 3,400.00 500.00 500.00 1.00 1.00
202-02-02 removal of 5.0 m x 16.8 m wood frame church (lt. of
sta. 11+320 on us 165) (contains non-friable
asbestos)
1      ea 1,800.00 1,800.00 3,400.00 3,400.00 3,250.00 3,250.00 1.00 1.00
202-02-03 removal of 11.1 m x 13.4 m wood frame residence (rt.
of sta. 11+706 on us 165)
1      ea 500.00 500.00 3,400.00 3,400.00 4,100.00 4,100.00 1.00 1.00
202-02-04 removal of 8.9 m x 16.5 m wood frame residence (rt. of
sta. 11+760 on us 165)
1      ea 4,000.00 4,000.00 3,400.00 3,400.00 4,050.00 4,050.00 1.00 1.00
202-02-05 removal of 3.0 m x 6.1 m wood frame garage (rt. of
sta. 11+764 on us 165)
1      ea 1,300.00 1,300.00 3,400.00 3,400.00 425.00 425.00 1.00 1.00
202-02-06 removal of 10.5 m x 18.6 m metal shed (rt. of sta.
11+876 on us 165)
1      ea 400.00 400.00 3,400.00 3,400.00 3,250.00 3,250.00 1.00 1.00
202-02-07 removal of 9.3 m x 9.5 m wood shed (rt. of sta.
11+900 on us 165)
1      ea 400.00 400.00 550.00 550.00 1,950.00 1,950.00 1.00 1.00
202-02-08 removal of 7.3 m x 7.4 m concrete block commercial
building (rt. of sta. 12+780 on us 165)
1      ea 1,200.00 1,200.00 3,400.00 3,400.00 1,800.00 1,800.00 1.00 1.00
202-02-09 removal of 14.8 m x 9.3 m wood frame residence on
blocks (rt. of sta. 12+ 790 on us 165)(cont.
non-friable asbestos)
1      ea 1,800.00 1,800.00 3,400.00 3,400.00 3,800.00 3,800.00 1.00 1.00
202-02-10 removal of 6.3 m x 2.5 m wood and metal storage shed
(rt. of sta. 12+790 on us 165)
1      ea 1,000.00 1,000.00 550.00 550.00 360.00 360.00 1.00 1.00
202-02-11 removal of 3.8 m x 8.5 m wood and metal shop (rt. of
sta. 12+940 on us 165)
1      ea 2,000.00 2,000.00 550.00 550.00 725.00 725.00 1.00 1.00
202-02-12 removal of 8.7 m x 9.2 m wood frame residence (rt. of
sta. 12+940 on us 165)(contains non-friable
asbestos)
1      ea 1,200.00 1,200.00 550.00 550.00 2,210.00 2,210.00 1.00 1.00
202-02-13 removal of 10.0 m x 21.4 m metal office building (rt.
of sta. 12+965 on us 165)
1      ea 7,000.00 7,000.00 3,400.00 3,400.00 7,075.00 7,075.00 1.00 1.00
202-02-14 removal of 3.9 m x 3.1 m metal shed on slab (rt. of
sta. 12+970 on us 165)
1      ea 800.00 800.00 550.00 550.00 200.00 200.00 1.00 1.00
202-02-15 removal of 13.6 m x 8.7 m wood frame residence (rt. of
sta. 12+970 on us 165)
1      ea 1,800.00 1,800.00 3,400.00 3,400.00 3,270.00 3,270.00 1.00 1.00
202-02-16 removal of 4.8 m x 6.7 m metal shed (rt. of sta.
13+000 on us 165)
1      ea 1,800.00 1,800.00 550.00 550.00 550.00 550.00 1.00 1.00
202-02-17 removal of 8.5 m x 9.3 m metal commercial building
(rt. of sta. 13+325 on us 165)
1      ea 1,400.00 1,400.00 2,600.00 2,600.00 2,650.00 2,650.00 1.00 1.00
202-02-18 removal of 10.3 m x 16.6 m brick building on slab (lt.
of sta. 39+270 on us 165)
1      ea 1,800.00 1,800.00 3,400.00 3,400.00 5,670.00 5,670.00 1.00 1.00
202-02-19 removal of 10.0 m x 13.2 m wood frame building on slab
(lt. of sta. 39+380 on us 165)
1      ea 1,800.00 1,800.00 3,400.00 3,400.00 3,650.00 3,650.00 1.00 1.00
202-02-20 removal of 3.1 m x 10.4 m metal building on slab (lt.
of sta. 39+420 on us 165)
1      ea 2,400.00 2,400.00 550.00 550.00 725.00 725.00 1.00 1.00
202-02-21 removal of 9.3 m x 18.3 m metal building on slab (lt.
of sta. 39+450 on us 165)
1      ea 3,600.00 3,600.00 2,700.00 2,700.00 3,760.00 3,760.00 1.00 1.00
202-02-22 removal of 6.1 m x 35.0 m brick building on concrete
slab (lt. of sta. 39+470 on us 165)
1      ea 7,000.00 7,000.00 2,700.00 2,700.00 1,300.00 1,300.00 1.00 1.00
202-02-23 removal of 11.7 m x 11.6 m brick building on slab (lt.
of sta. 39+590 on us 165)
1      ea 3,500.00 3,500.00 2,700.00 2,700.00 4,500.00 4,500.00 1.00 1.00
202-02-24 removal of 13.5 m x 17.8 m brick building on slab (lt.
of sta. 39+625 on us 165)(contains non-friable
asbestos)
1      ea 3,500.00 3,500.00 2,700.00 2,700.00 7,930.00 7,930.00 1.00 1.00
202-02-25 removal of 4.5 m x 6.2 m commercial building (rt. of
sta. 4+720 on la 500)
1      ea 3,500.00 3,500.00 3,400.00 3,400.00 910.00 910.00 1.00 1.00
202-02-26 removal of 4.5 m x 6.2 m concrete slab (rt. of sta.
4+770 on la 500)
1      ea 3,500.00 3,500.00 550.00 550.00 165.00 165.00 1.00 1.00
202-02-27 removal of 5.0 m x 15.2 m wood frame residence (lt. of
sta. 4+910 on la 500)
1      ea 1,400.00 1,400.00 1,700.00 1,700.00 2,100.00 2,100.00 1.00 1.00
202-02-28 removal of 9.0 m x 14.9 m wood frame residence on
concrete piers (lt. of sta. 5+210 on fifth street)
1      ea 3,500.00 3,500.00 2,700.00 2,700.00 3,700.00 3,700.00 1.00 1.00
202-02-29 removal of 10.5 m x 11.5 m wood frame residence on
piers (rt. of sta. 5+180 on jones street)
1      ea 1,800.00 1,800.00 2,700.00 2,700.00 3,320.00 3,320.00 1.00 1.00
202-02-30 removal of 3.7 m x 3.0 m wood frame shed on slab (rt.
of sta. 5+180 on jones street)
1      ea 750.00 750.00 550.00 550.00 250.00 250.00 1.00 1.00
202-02-31 removal of 3.0 m x 3.7 m metal shed (lt. of sta.
5+190 on jones street)
1      ea 750.00 750.00 550.00 550.00 200.00 200.00 1.00 1.00
202-02-32 removal of 3.0 m x 3.0 m wood frame greenhouse (lt. of
sta. 5+190 on jones street)
1      ea 750.00 750.00 275.00 275.00 200.00 200.00 1.00 1.00
202-02-33 removal of 7.9 m x 6.6 m wood frame residence on piers
(lt. of sta. 5+190 on jones street)
1      ea 1,800.00 1,800.00 2,700.00 2,700.00 1,440.00 1,440.00 1.00 1.00
202-02-34 removal of 7.9 m x 9.4 m wood frame shed on slab (lt.
of sta. 5+218 on jones street)
1      ea 1,800.00 1,800.00 550.00 550.00 2,050.00 2,050.00 1.00 1.00
202-02-35 removal of 16.8 m x 11.7 m wood frame residence on
piers (rt. of sta. 5+266 on jones street)
1      ea 1,800.00 1,800.00 2,700.00 2,700.00 5,420.00 5,420.00 1.00 1.00
202-02-36 removal of 9.5 m x 17.7 m wood frame residence on
piers (rt. of sta. 5+075 on la 500)(contains
non-friable asbestos)
1      ea 1,800.00 1,800.00 2,700.00 2,700.00 4,650.00 4,650.00 1.00 1.00
203-01 general excavation 243,840      cu m 6.80 1,658,112.00 4.85 1,182,624.00 3.60 877,824.00 6.50 1,584,960.00
203-02 drainage excavation 4,940      cu m 13.50 66,690.00 8.25 40,755.00 10.20 50,388.00 12.00 59,280.00
203-03 muck excavation 957      cu m 18.00 17,226.00 18.00 17,226.00 21.00 20,097.00 20.00 19,140.00
203-04 embankment 650,743      cu m 10.80 7,028,024.40 9.75 6,344,744.25 10.00 6,507,430.00 11.00 7,158,173.00
203-05 nonplastic embankment 8,241      cu m 126.00 1,038,366.00 100.00 824,100.00 81.00 667,521.00 90.00 741,690.00
204-02 temporary hay or straw bales 240      ea 30.00 7,200.00 20.00 4,800.00 13.50 3,240.00 10.00 2,400.00
204-05-A temporary sediment check dams (hay) 326      ea 150.00 48,900.00 175.00 57,050.00 108.00 35,208.00 130.00 42,380.00
204-05-B temporary sediment check dams (stone) 5      ea 750.00 3,750.00 1,300.00 6,500.00 185.00 925.00 1,000.00 5,000.00
204-06 temporary silt fencing 23,575      ln m 5.00 117,875.00 9.00 212,175.00 7.25 170,918.75 4.00 94,300.00
204-07 temporary stone construction entrance 3      ea 3,000.00 9,000.00 3,200.00 9,600.00 4,250.00 12,750.00 2,000.00 6,000.00
302-01-01 class ii base course (stone or recycled pccp) 2,964.7    cu m 125.00 370,587.50 120.00 355,764.00 135.00 400,234.50 140.00 415,058.00
304-01 lime 1,385.22   Mg 160.00 221,635.20 100.00 138,522.00 1.00 1,385.22 150.00 207,783.00
304-03-D lime treatment (type c) (300 mm thick) 91,615      sq m 1.20 109,938.00 1.00 91,615.00 6.10 558,851.50 2.80 256,522.00
305-01-D subgrade layer (300 mm thick) 183,232      sq m 9.50 1,740,704.00 12.25 2,244,592.00 8.75 1,603,280.00 11.00 2,015,552.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,010      cu m 148.00 149,480.00 122.00 123,220.00 120.00 121,200.00 75.00 75,750.00
402-01 traffic maintenance aggregate (vehicular measurement) 1,100.0    cu m 110.00 121,000.00 122.00 134,200.00 165.00 181,500.00 80.00 88,000.00
502-01-A-01 superpave asphaltic concrete drives, turnouts and
miscellaneous (side roads)
573.0    Mg 110.00 63,030.00 140.00 80,220.00 152.00 87,096.00 150.00 85,950.00
502-01-01 superpave asphaltic concrete (side roads) 2,298.9    Mg 110.00 252,879.00 140.00 321,846.00 110.00 252,879.00 110.00 252,879.00
701-01-I cross drain pipe (600 mm rcp/pcp) 101.3    ln m 390.00 39,507.00 300.00 30,390.00 170.00 17,221.00 300.00 30,390.00
701-01-K cross drain pipe (750 mm rcp/pcp) 53.7    ln m 590.00 31,683.00 350.00 18,795.00 235.00 12,619.50 320.00 17,184.00
701-01-M cross drain pipe (900 mm rcp/pcp) 118.4    ln m 570.00 67,488.00 450.00 53,280.00 800.00 94,720.00 380.00 44,992.00
701-01-O cross drain pipe (1200 mm rcp/pcp) 214.1    ln m 730.00 156,293.00 700.00 149,870.00 815.00 174,491.50 600.00 128,460.00
701-02-D cross drain pipe arch (600 mm equiv. rcpa) 43.0    ln m 590.00 25,370.00 425.00 18,275.00 300.00 12,900.00 270.00 11,610.00
701-03-G storm drain pipe (450 mm rcp/pcp) 1,000.5    ln m 290.00 290,145.00 200.00 200,100.00 145.00 145,072.50 200.00 200,100.00
701-04-B storm drain pipe arch (450 mm equiv. rcpa) 58.6    ln m 370.00 21,682.00 250.00 14,650.00 220.00 12,892.00 270.00 15,822.00
701-05-G side drain pipe (450 mm) 777.1    ln m 190.00 147,649.00 200.00 155,420.00 140.00 108,794.00 170.00 132,107.00
701-05-I side drain pipe (600 mm) 210.8    ln m 290.00 61,132.00 275.00 57,970.00 185.00 38,998.00 200.00 42,160.00
701-05-K side drain pipe (750 mm) 19.5    ln m 480.00 9,360.00 325.00 6,337.50 250.00 4,875.00 240.00 4,680.00
701-10-I reinforced concrete pipe (extension)(600 mm) 15.5    ln m 450.00 6,975.00 335.00 5,192.50 210.00 3,255.00 400.00 6,200.00
701-10-K reinforced concrete pipe (extension)(750 mm) 37.0    ln m 520.00 19,240.00 375.00 13,875.00 255.00 9,435.00 440.00 16,280.00
702-02-A manholes (mh-06) 1      ea 6,000.00 6,000.00 3,500.00 3,500.00 4,400.00 4,400.00 4,000.00 4,000.00
702-02-B manholes (r-cb-11) 1      ea 3,000.00 3,000.00 9,500.00 9,500.00 4,200.00 4,200.00 4,000.00 4,000.00
702-03-A catch basins (cb-01m) 41      ea 3,500.00 143,500.00 2,400.00 98,400.00 3,600.00 147,600.00 2,500.00 102,500.00
702-03-B catch basins (cb-02m) 2      ea 4,600.00 9,200.00 5,500.00 11,000.00 3,400.00 6,800.00 3,500.00 7,000.00
702-04-A adjusting manholes 4      ea 500.00 2,000.00 3,500.00 14,000.00 1,450.00 5,800.00 1,000.00 4,000.00
702-07-A cross drain safety end (type 1) 3      ea 8,000.00 24,000.00 2,400.00 7,200.00 2,000.00 6,000.00 1,800.00 5,400.00
702-08-A side drain safety end (type 1) 18      ea 2,400.00 43,200.00 2,200.00 39,600.00 1,350.00 24,300.00 1,800.00 32,400.00
704-01-A guard rail (single thrie beam)(950 mm post spacing) 297.18   ln m 115.00 34,175.70 165.00 49,034.70 99.00 29,420.82 100.00 29,718.00
704-03 blocked out guard rail 1,383.04   ln m 65.00 89,897.60 66.00 91,280.64 55.75 77,104.48 56.00 77,450.24
704-08-A guard rail transitions (single thrie beam) 228.58   ln m 85.00 19,429.30 190.00 43,430.20 75.00 17,143.50 75.00 17,143.50
704-11-A guard rail end treatment (flared) 33      ea 2,200.00 72,600.00 2,200.00 72,600.00 1,975.00 65,175.00 2,000.00 66,000.00
705-01 barbed wire fence 5,952      ln m 18.50 110,112.00 17.00 101,184.00 15.50 92,256.00 16.00 95,232.00
705-02 combination mesh & barbed wire fence 2,199      ln m 19.50 42,880.50 19.00 41,781.00 17.36 38,174.64 18.00 39,582.00
705-04 single swinging driveway gates 10      ea 450.00 4,500.00 500.00 5,000.00 450.00 4,500.00 450.00 4,500.00
705-05 double swinging driveway gates 1      dbgt 900.00 900.00 650.00 650.00 600.00 600.00 600.00 600.00
705-06-A chain link fence (1200 mm height) 94      ln m 68.00 6,392.00 60.00 5,640.00 54.00 5,076.00 55.00 5,170.00
705-07-A 4.0-meter single gates for chain link fence (1200mm
height)
1      ea 700.00 700.00 825.00 825.00 750.00 750.00 800.00 800.00
705-08-A 4.0-meter double gates for chain link fence (1200mm
height)
1      dbgt 1,100.00 1,100.00 1,150.00 1,150.00 1,050.00 1,050.00 1,100.00 1,100.00
706-02-C concrete drive (150 mm thick) 1,145.6    sq m 90.00 103,104.00 60.00 68,736.00 45.00 51,552.00 60.00 68,736.00
706-03-C incidental concrete paving (150 mm thick) 499.0    sq m 68.00 33,932.00 80.00 39,920.00 43.00 21,457.00 90.00 44,910.00
708-01 right-of-way monument 187      ea 350.00 65,450.00 1.00 187.00 85.00 15,895.00 120.00 22,440.00
708-02 right-of-way monument witness post 187      ea 350.00 65,450.00 1.00 187.00 85.00 15,895.00 120.00 22,440.00
711-01-D riprap (25 kg, 675 mm thick) 4,256      sq m 85.00 361,760.00 65.00 276,640.00 51.00 217,056.00 90.00 383,040.00
711-01-H riprap (455 kg,1200 mm thick) 700      sq m 150.00 105,000.00 112.00 78,400.00 200.00 140,000.00 140.00 98,000.00
711-04 geotextile fabric 8,426      sq m 2.00 16,852.00 2.25 18,958.50 3.80 32,018.80 2.50 21,065.00
712-01-A concrete cast-in-place revetment (100 mm thick) 3,500      sq m 63.00 220,500.00 47.00 164,500.00 55.00 192,500.00 75.00 262,500.00
713-01 temporary signs & barricades lump      lump 250,000.00 250,000.00 150,000.00 150,000.00 115,000.00 115,000.00 300,000.00 300,000.00
713-03-A temporary pavement markings (100 mm width) 20,820      ln m 0.76 15,823.20 0.35 7,287.00 0.33 6,870.60 0.35 7,287.00
716-01-A mulch (vegetative) 16.2    hctr 1,900.00 30,780.00 1,900.00 30,780.00 1,729.00 28,009.80 1,600.00 25,920.00
720-01-A erosion control system, slope protection (type a) 127,929      sq m 1.45 185,497.05 1.30 166,307.70 1.22 156,073.38 0.70 89,550.30
720-01-C erosion control system, flexible channel liner (type c) 6,170      sq m 2.20 13,574.00 2.00 12,340.00 1.80 11,106.00 1.70 10,489.00
720-01-D erosion control system, flexible channel liner (type d) 3,627      sq m 2.20 7,979.40 2.10 7,616.70 1.90 6,891.30 2.40 8,704.80
720-01-E erosion control system, flexible channel liner (type e) 150      sq m 3.50 525.00 3.25 487.50 3.00 450.00 5.00 750.00
722-02 project site laboratory (equipped) 2      ea 70,000.00 140,000.00 10,000.00 20,000.00 25,000.00 50,000.00 30,000.00 60,000.00
724-01-B pavement patching (300 mm minimum thickness) 825      sq m 150.00 123,750.00 105.00 86,625.00 250.00 206,250.00 100.00 82,500.00
725-01 temporary detour roads 885.8    ln m 750.00 664,350.00 625.00 553,625.00 1,000.00 885,800.00 800.00 708,640.00
726-01 bedding material 454.3    cu m 125.00 56,787.50 110.00 49,973.00 82.00 37,252.60 100.00 45,430.00
727-01 mobilization lump      lump 4,550,000.00 4,550,000.00 4,100,000.00 4,100,000.00 4,700,000.00 4,700,000.00 5,000,000.00 5,000,000.00
729-01-A sign (type a)(r1-1)(0.762 m x 0.762 m) 1.16   sq m 210.00 243.60 100.00 116.00 300.00 348.00 300.00 348.00
729-16-C object marker assembly (type 3) 30      ea 80.00 2,400.00 85.00 2,550.00 75.00 2,250.00 75.00 2,250.00
729-21 u-channel post (12-foot) 2      each 80.00 160.00 85.00 170.00 110.00 220.00 600.00 1,200.00
731-01 nonreflectorized raised pavement markers 3,277      ea 13.25 43,420.25 11.00 36,047.00 10.00 32,770.00 10.00 32,770.00
731-02 reflectorized raised pavement markers 4,075      ea 7.00 28,525.00 5.00 20,375.00 4.50 18,337.50 5.00 20,375.00
732-02-A plastic pavement striping (solid line)(100 mm width) 58.438  km 1,850.00 108,110.30 900.00 52,594.20 1,327.00 77,547.23 1,350.00 78,891.30
732-02-C plastic pavement striping (solid line)(200 mm width) 0.491  km 4,000.00 1,964.00 2,100.00 1,031.10 3,200.00 1,571.20 3,200.00 1,571.20
732-04-A plastic pavement legends & symbols (arrow) 13      ea 190.00 2,470.00 150.00 1,950.00 139.00 1,807.00 150.00 1,950.00
732-04-C plastic pavement legends & symbols (only) 13      ea 230.00 2,990.00 150.00 1,950.00 139.00 1,807.00 150.00 1,950.00
732-05 removal of existing markings 9.077  km 4,300.00 39,031.10 1,500.00 13,615.50 2,151.00 19,524.63 2,200.00 19,969.40
735-01 mailboxes 46      ea 25.00 1,150.00 1.00 46.00 1.00 46.00 1.00 46.00
735-02 mailbox supports (single) 46      ea 200.00 9,200.00 140.00 6,440.00 125.00 5,750.00 130.00 5,980.00
736-01 trenching and backfilling 10      ln m 23.00 230.00 22.00 220.00 20.00 200.00 20.00 200.00
736-04-B signal support (9.1 m strain pole) 4      each 9,500.00 38,000.00 8,500.00 34,000.00 8,000.00 32,000.00 8,000.00 32,000.00
736-05-B signal head (1-section y)(led) 4      each 890.00 3,560.00 825.00 3,300.00 750.00 3,000.00 750.00 3,000.00
736-05-C signal head (1-section r)(led) 4      each 890.00 3,560.00 825.00 3,300.00 750.00 3,000.00 750.00 3,000.00
736-06-A signal service (pole mounted for flasher switch
assembly)
1      each 1,700.00 1,700.00 1,650.00 1,650.00 1,500.00 1,500.00 1,500.00 1,500.00
736-11-A conduit (76.2 mm sch. 80) 10      ln m 40.00 400.00 38.00 380.00 35.00 350.00 35.00 350.00
736-12-A conductor, 3c (power) 10      ln m 23.00 230.00 22.00 220.00 20.00 200.00 20.00 200.00
739-01 hydro-seeding 89.6    hctr 2,800.00 250,880.00 2,300.00 206,080.00 2,090.00 187,264.00 2,700.00 241,920.00
740-01 construction layout lump      lump 400,000.00 400,000.00 250,000.00 250,000.00 290,000.00 290,000.00 500,000.00 500,000.00
740-02 utility oversight and coordination lump      lump 33,000.00 33,000.00 26,000.00 26,000.00 10,000.00 10,000.00 40,000.00 40,000.00
744-01 traffic control management lump      lump 270,000.00 270,000.00 56,000.00 56,000.00 10,000.00 10,000.00 50,000.00 50,000.00
804-01-B precast concrete piles (350 mm) 368.0    ln m 150.00 55,200.00 160.00 58,880.00 380.00 139,840.00 160.00 58,880.00
804-01-C precast concrete piles (400 mm) 2,264.0    ln m 160.00 362,240.00 180.00 407,520.00 245.00 554,680.00 190.00 430,160.00
804-01-D precast concrete piles (450 mm) 660.0    ln m 195.00 128,700.00 240.00 158,400.00 345.00 227,700.00 240.00 158,400.00
804-01-F precast concrete piles (600 mm) 4,213.2    ln m 285.00 1,200,762.00 425.00 1,790,610.00 410.00 1,727,412.00 430.00 1,811,676.00
804-01-H precast concrete piles (900 mm) 624.0    ln m 700.00 436,800.00 725.00 452,400.00 940.00 586,560.00 750.00 468,000.00
804-05 precast concrete test piles 7      ea 20,000.00 140,000.00 22,000.00 154,000.00 48,000.00 336,000.00 21,000.00 147,000.00
804-09 loading test piles 7      ea 15,000.00 105,000.00 26,500.00 185,500.00 5,000.00 35,000.00 28,000.00 196,000.00
804-10 reloading test piles 7      ea 1,000.00 7,000.00 2,400.00 16,800.00 1,000.00 7,000.00 3,000.00 21,000.00
804-11 redriving test piles 7      ea 1,000.00 7,000.00 5,200.00 36,400.00 300.00 2,100.00 3,000.00 21,000.00
804-12 loading permanent piles 7      ea 1,000.00 7,000.00 1,000.00 7,000.00 1,500.00 10,500.00 1,000.00 7,000.00
804-17 dynamic monitoring 7      ea 8,000.00 56,000.00 1,200.00 8,400.00 2,000.00 14,000.00 1,100.00 7,700.00
805-01-B class a concrete (box culvert headwalls) 139.23   cu m 1,500.00 208,845.00 2,000.00 278,460.00 2,150.00 299,344.50 1,300.00 180,999.00
805-01-F class a concrete (bents) 1,115.95   cu m 800.00 892,760.00 925.00 1,032,253.75 875.00 976,456.25 900.00 1,004,355.00
805-03 class aa concrete 3,759.36   cu m 650.00 2,443,584.00 880.00 3,308,236.80 815.00 3,063,878.40 850.00 3,195,456.00
805-08-C precast-prestressed concrete girders (type iii) 4,366.75   ln m 290.00 1,266,357.50 420.00 1,834,035.00 345.00 1,506,528.75 400.00 1,746,700.00
805-08-D precast-prestressed concrete girders (type iv) 1,399.42   ln m 410.00 573,762.20 630.00 881,634.60 490.00 685,715.80 600.00 839,652.00
805-11 strip seal joints 216.00   ln m 500.00 108,000.00 430.00 92,880.00 490.00 105,840.00 450.00 97,200.00
805-12-A reinforced concrete box culverts (1200 mm x 900 mm) 32.42   ln m 1,700.00 55,114.00 1,400.00 45,388.00 870.00 28,205.40 900.00 29,178.00
805-12-E reinforced concrete box culverts (1200 mm x 1200 mm) 91.97   ln m 1,400.00 128,758.00 1,400.00 128,758.00 1,550.00 142,553.50 950.00 87,371.50
805-12-F reinforced concrete box culverts (1500 mm x 1200 mm) 85.00   ln m 1,200.00 102,000.00 1,700.00 144,500.00 1,100.00 93,500.00 1,200.00 102,000.00
805-12-I reinforced concrete box culverts (1500 mm x 1500 mm) 158.00   ln m 1,500.00 237,000.00 1,900.00 300,200.00 1,600.00 252,800.00 1,300.00 205,400.00
805-12-J reinforced concrete box culverts (1800 mm x 1500 mm) 67.00   ln m 2,000.00 134,000.00 2,400.00 160,800.00 1,700.00 113,900.00 1,500.00 100,500.00
805-12-L reinforced concrete box culverts (2400 mm x 1500 mm) 31.40   ln m 3,200.00 100,480.00 2,600.00 81,640.00 2,050.00 64,370.00 2,000.00 62,800.00
805-12-M reinforced concrete box culverts (1800 mm x 1800 mm) 60.30   ln m 2,600.00 156,780.00 2,900.00 174,870.00 2,400.00 144,720.00 1,700.00 102,510.00
805-12-O reinforced concrete box culverts (2400 mm x 1800 mm) 41.00   ln m 3,000.00 123,000.00 3,200.00 131,200.00 1,700.00 69,700.00 2,100.00 86,100.00
805-12-S reinforced concrete box culverts (2400 mm x 2400 mm) 110.00   ln m 2,200.00 242,000.00 3,400.00 374,000.00 2,500.00 275,000.00 2,300.00 253,000.00
806-01 deformed reinforcing steel 610,302      kg 1.58 964,277.16 1.88 1,147,367.76 1.80 1,098,543.60 2.00 1,220,604.00
807-06 structural metalwork lump      lump 20,000.00 20,000.00 11,000.00 11,000.00 20,000.00 20,000.00 20,000.00 20,000.00
810-01 concrete railing (barrier) 2,487.94   ln m 150.00 373,191.00 165.00 410,510.10 150.00 373,191.00 140.00 348,311.60
813-01 concrete approach slabs 1,742.40   sq m 210.00 365,904.00 265.00 461,736.00 225.00 392,040.00 220.00 383,328.00
814-01-J drilled shaft (1650 mm) 252.00   ln m 5,100.00 1,285,200.00 5,100.00 1,285,200.00 3,850.00 970,200.00 3,000.00 756,000.00
814-04 crosshole sonic logging (1650 mm) 9      ea 1,800.00 16,200.00 4,400.00 39,600.00 2,600.00 23,400.00 2,000.00 18,000.00
S-001 rumble strips (ground-in) 24.2    km 400.00 9,680.00 225.00 5,445.00 330.00 7,986.00 330.00 7,986.00
S-002 removal of 015-04-0038 transition road (sta.
110+600.000 to sta. 111+125.880)
lump      lump 22,000.00 22,000.00 18,000.00 18,000.00 25,000.00 25,000.00 20,000.00 20,000.00
S-003 removal of 015-04-0035 transition road (sta.
40+727.600 to sta. 41+260.000)
lump      lump 22,000.00 22,000.00 18,000.00 18,000.00 25,000.00 25,000.00 20,000.00 20,000.00
S-004 flasher switch (flasher assembly, 2 circuit, pole
mounted cabinet)
1      each 7,000.00 7,000.00 6,600.00 6,600.00 6,000.00 6,000.00 6,000.00 6,000.00
S-005 special precautions regarding water supply lump      lump 10,000.00 10,000.00 17,500.00 17,500.00 100,000.00 100,000.00 20,000.00 20,000.00
S-101 retroreflective sheeting panels lump      lump 6,500.00 6,500.00 2,200.00 2,200.00 20,000.00 20,000.00 4,000.00 4,000.00
 SUBTOTAL GENERAL       36,324,526.11   36,795,776.55   36,650,472.00   39,006,803.34
                       
ALTERNATE A pavement alternates                    
                       
ALTERNATE A1 superpave asphaltic concrete pavement                    
302-02-A-01 class ii base course (150 mm thick)(stone or recycled
pccp)
59,884.0    sq m 19.00 1,137,796.00 18.00 1,077,912.00 0.00 0.00 0.00 0.00
302-02-C-01 class ii base course (250 mm thick)(stone or recycled
pccp)
123,928.3    sq m 30.00 3,717,849.00 28.00 3,469,992.40 0.00 0.00 0.00 0.00
502-01 superpave asphaltic concrete 48,410.8    Mg 85.00 4,114,918.00 88.00 4,260,150.40 0.00 0.00 0.00 0.00
502-01-A superpave asphaltic concrete drives, turnouts and
miscellaneous
6,057.1    Mg 110.00 666,281.00 110.00 666,281.00 0.00 0.00 0.00 0.00
732-03-A plastic pavement striping (broken line)(100 mm width) 25.051  km 600.00 15,030.60 342.00 8,567.44 0.00 0.00 0.00 0.00
 SUBTOTAL ALT A1       9,651,874.60   9,482,903.24        
                       
ALTERNATE A2 portland cement concrete pavement                    
302-02-A-01 class ii base course (150 mm thick)(stone or recycled
pccp)
59,884.0    sq m 0.00 0.00 0.00 0.00 15.00 898,260.00 18.50 1,107,854.00
302-02-E-01 class ii base course (200 mm thick)(stone or recycled
pccp)
123,928.3    sq m 0.00 0.00 0.00 0.00 17.00 2,106,781.10 22.50 2,788,386.75
502-01 superpave asphaltic concrete 13,450.8    Mg 0.00 0.00 0.00 0.00 115.00 1,546,842.00 115.00 1,546,842.00
601-01-G portland cement concrete pavement (200 mm thick) 92,519.3    sq m 0.00 0.00 0.00 0.00 49.00 4,533,445.70 49.00 4,533,445.70
601-02-G portland cement concrete pavement (200 mm thick)
(crossovers & turnouts)
22,398.7    sq m 0.00 0.00 0.00 0.00 80.00 1,791,896.00 62.40 1,397,678.88
601-04 portland cement concrete pavement coring 143      ea 0.00 0.00 0.00 0.00 95.00 13,585.00 100.00 14,300.00
732-03-A-01 plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape (type v)
25.051  km 0.00 0.00 0.00 0.00 3,259.00 81,641.21 3,300.00 82,668.30
 SUBTOTAL ALT A2               10,972,451.01   11,471,175.63
                       
 ITEM TOTAL (CONSTRUCTION BID)       45,976,400.71   46,278,679.79   47,622,923.01   50,477,978.97
 NUMBER OF DAYS BID AT $3,200 PER DAY.       2,560,000.00   2,560,000.00   2,560,000.00   2,560,000.00
 LIFE CYCLE COST       1,643,900.00   1,643,900.00   688,300.00   688,300.00
 TOTAL BID       50,180,300.71   50,482,579.79   50,871,223.01   53,726,278.97