| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - JAMES CONSTRUCTION GROUP LLC |
- 4 - DENTON-JAMES LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
600,000.00 |
600,000.00 |
500,000.00 |
500,000.00 |
1,500,000.00 |
1,500,000.00 |
1,400,000.00 |
1,400,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
90,000.00 |
90,000.00 |
65,000.00 |
65,000.00 |
75,000.00 |
75,000.00 |
400,000.00 |
400,000.00 |
| 202-02-B-01 |
removal of concrete box culverts (sta. 13+339.40;
1524 m x 1219 m x 26.78 m) |
1   |
ea |
10,000.00 |
10,000.00 |
9,000.00 |
9,000.00 |
1,720.00 |
1,720.00 |
6,000.00 |
6,000.00 |
| 202-02-B-02 |
removal of concrete box culverts (sta. 14+772.41;
1829 m x 1829 m x 27.34 m) |
1   |
ea |
10,000.00 |
10,000.00 |
12,000.00 |
12,000.00 |
1,760.00 |
1,760.00 |
9,000.00 |
9,000.00 |
| 202-02-B-03 |
removal of concrete box culverts (sta. 17+669.95;
1219 m x 1219 m x 36.98 m) |
1   |
ea |
8,000.00 |
8,000.00 |
6,500.00 |
6,500.00 |
2,365.00 |
2,365.00 |
7,000.00 |
7,000.00 |
| 202-02-B-04 |
removal of concrete box culverts (sta. 19+339.61;
1219 m x 1219 m x 228.2 m) |
1   |
ea |
8,000.00 |
8,000.00 |
9,000.00 |
9,000.00 |
14,650.00 |
14,650.00 |
6,000.00 |
6,000.00 |
| 202-02-B-05 |
removal of concrete box culverts (sta. 19+496.63;
1524 m x 1524 m x 29.70 m) |
1   |
ea |
8,000.00 |
8,000.00 |
1,000.00 |
1,000.00 |
1,900.00 |
1,900.00 |
7,000.00 |
7,000.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
23,060   |
sq m |
7.50 |
172,950.00 |
11.00 |
253,660.00 |
2.00 |
46,120.00 |
8.00 |
184,480.00 |
| 202-02-D |
removal of concrete walks & drives
|
875   |
sq m |
11.00 |
9,625.00 |
8.00 |
7,000.00 |
3.45 |
3,018.75 |
12.00 |
10,500.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
30,904.3 |
sq m |
5.50 |
169,973.65 |
3.50 |
108,165.05 |
2.00 |
61,808.60 |
5.00 |
154,521.50 |
| 202-02-H |
removal of guard rail
|
259   |
ln m |
14.00 |
3,626.00 |
17.50 |
4,532.50 |
12.50 |
3,237.50 |
12.00 |
3,108.00 |
| 202-02-I |
removal of paved drains
|
1,420   |
sq m |
8.00 |
11,360.00 |
9.00 |
12,780.00 |
10.00 |
14,200.00 |
11.00 |
15,620.00 |
| 202-02-01 |
removal of 6.4 m x 13.8 m concrete slab (rt. of sta.
10+883 on us 165) |
1   |
ea |
900.00 |
900.00 |
3,400.00 |
3,400.00 |
500.00 |
500.00 |
1.00 |
1.00 |
| 202-02-02 |
removal of 5.0 m x 16.8 m wood frame church (lt. of
sta. 11+320 on us 165) (contains non-friable asbestos) |
1   |
ea |
1,800.00 |
1,800.00 |
3,400.00 |
3,400.00 |
3,250.00 |
3,250.00 |
1.00 |
1.00 |
| 202-02-03 |
removal of 11.1 m x 13.4 m wood frame residence (rt.
of sta. 11+706 on us 165) |
1   |
ea |
500.00 |
500.00 |
3,400.00 |
3,400.00 |
4,100.00 |
4,100.00 |
1.00 |
1.00 |
| 202-02-04 |
removal of 8.9 m x 16.5 m wood frame residence (rt. of
sta. 11+760 on us 165) |
1   |
ea |
4,000.00 |
4,000.00 |
3,400.00 |
3,400.00 |
4,050.00 |
4,050.00 |
1.00 |
1.00 |
| 202-02-05 |
removal of 3.0 m x 6.1 m wood frame garage (rt. of
sta. 11+764 on us 165) |
1   |
ea |
1,300.00 |
1,300.00 |
3,400.00 |
3,400.00 |
425.00 |
425.00 |
1.00 |
1.00 |
| 202-02-06 |
removal of 10.5 m x 18.6 m metal shed (rt. of sta.
11+876 on us 165) |
1   |
ea |
400.00 |
400.00 |
3,400.00 |
3,400.00 |
3,250.00 |
3,250.00 |
1.00 |
1.00 |
| 202-02-07 |
removal of 9.3 m x 9.5 m wood shed (rt. of sta.
11+900 on us 165) |
1   |
ea |
400.00 |
400.00 |
550.00 |
550.00 |
1,950.00 |
1,950.00 |
1.00 |
1.00 |
| 202-02-08 |
removal of 7.3 m x 7.4 m concrete block commercial
building (rt. of sta. 12+780 on us 165) |
1   |
ea |
1,200.00 |
1,200.00 |
3,400.00 |
3,400.00 |
1,800.00 |
1,800.00 |
1.00 |
1.00 |
| 202-02-09 |
removal of 14.8 m x 9.3 m wood frame residence on
blocks (rt. of sta. 12+ 790 on us 165)(cont. non-friable asbestos) |
1   |
ea |
1,800.00 |
1,800.00 |
3,400.00 |
3,400.00 |
3,800.00 |
3,800.00 |
1.00 |
1.00 |
| 202-02-10 |
removal of 6.3 m x 2.5 m wood and metal storage shed
(rt. of sta. 12+790 on us 165) |
1   |
ea |
1,000.00 |
1,000.00 |
550.00 |
550.00 |
360.00 |
360.00 |
1.00 |
1.00 |
| 202-02-11 |
removal of 3.8 m x 8.5 m wood and metal shop (rt. of
sta. 12+940 on us 165) |
1   |
ea |
2,000.00 |
2,000.00 |
550.00 |
550.00 |
725.00 |
725.00 |
1.00 |
1.00 |
| 202-02-12 |
removal of 8.7 m x 9.2 m wood frame residence (rt. of
sta. 12+940 on us 165)(contains non-friable asbestos) |
1   |
ea |
1,200.00 |
1,200.00 |
550.00 |
550.00 |
2,210.00 |
2,210.00 |
1.00 |
1.00 |
| 202-02-13 |
removal of 10.0 m x 21.4 m metal office building (rt.
of sta. 12+965 on us 165) |
1   |
ea |
7,000.00 |
7,000.00 |
3,400.00 |
3,400.00 |
7,075.00 |
7,075.00 |
1.00 |
1.00 |
| 202-02-14 |
removal of 3.9 m x 3.1 m metal shed on slab (rt. of
sta. 12+970 on us 165) |
1   |
ea |
800.00 |
800.00 |
550.00 |
550.00 |
200.00 |
200.00 |
1.00 |
1.00 |
| 202-02-15 |
removal of 13.6 m x 8.7 m wood frame residence (rt. of
sta. 12+970 on us 165) |
1   |
ea |
1,800.00 |
1,800.00 |
3,400.00 |
3,400.00 |
3,270.00 |
3,270.00 |
1.00 |
1.00 |
| 202-02-16 |
removal of 4.8 m x 6.7 m metal shed (rt. of sta.
13+000 on us 165) |
1   |
ea |
1,800.00 |
1,800.00 |
550.00 |
550.00 |
550.00 |
550.00 |
1.00 |
1.00 |
| 202-02-17 |
removal of 8.5 m x 9.3 m metal commercial building
(rt. of sta. 13+325 on us 165) |
1   |
ea |
1,400.00 |
1,400.00 |
2,600.00 |
2,600.00 |
2,650.00 |
2,650.00 |
1.00 |
1.00 |
| 202-02-18 |
removal of 10.3 m x 16.6 m brick building on slab (lt.
of sta. 39+270 on us 165) |
1   |
ea |
1,800.00 |
1,800.00 |
3,400.00 |
3,400.00 |
5,670.00 |
5,670.00 |
1.00 |
1.00 |
| 202-02-19 |
removal of 10.0 m x 13.2 m wood frame building on slab
(lt. of sta. 39+380 on us 165) |
1   |
ea |
1,800.00 |
1,800.00 |
3,400.00 |
3,400.00 |
3,650.00 |
3,650.00 |
1.00 |
1.00 |
| 202-02-20 |
removal of 3.1 m x 10.4 m metal building on slab (lt.
of sta. 39+420 on us 165) |
1   |
ea |
2,400.00 |
2,400.00 |
550.00 |
550.00 |
725.00 |
725.00 |
1.00 |
1.00 |
| 202-02-21 |
removal of 9.3 m x 18.3 m metal building on slab (lt.
of sta. 39+450 on us 165) |
1   |
ea |
3,600.00 |
3,600.00 |
2,700.00 |
2,700.00 |
3,760.00 |
3,760.00 |
1.00 |
1.00 |
| 202-02-22 |
removal of 6.1 m x 35.0 m brick building on concrete
slab (lt. of sta. 39+470 on us 165) |
1   |
ea |
7,000.00 |
7,000.00 |
2,700.00 |
2,700.00 |
1,300.00 |
1,300.00 |
1.00 |
1.00 |
| 202-02-23 |
removal of 11.7 m x 11.6 m brick building on slab (lt.
of sta. 39+590 on us 165) |
1   |
ea |
3,500.00 |
3,500.00 |
2,700.00 |
2,700.00 |
4,500.00 |
4,500.00 |
1.00 |
1.00 |
| 202-02-24 |
removal of 13.5 m x 17.8 m brick building on slab (lt.
of sta. 39+625 on us 165)(contains non-friable asbestos) |
1   |
ea |
3,500.00 |
3,500.00 |
2,700.00 |
2,700.00 |
7,930.00 |
7,930.00 |
1.00 |
1.00 |
| 202-02-25 |
removal of 4.5 m x 6.2 m commercial building (rt. of
sta. 4+720 on la 500) |
1   |
ea |
3,500.00 |
3,500.00 |
3,400.00 |
3,400.00 |
910.00 |
910.00 |
1.00 |
1.00 |
| 202-02-26 |
removal of 4.5 m x 6.2 m concrete slab (rt. of sta.
4+770 on la 500) |
1   |
ea |
3,500.00 |
3,500.00 |
550.00 |
550.00 |
165.00 |
165.00 |
1.00 |
1.00 |
| 202-02-27 |
removal of 5.0 m x 15.2 m wood frame residence (lt. of
sta. 4+910 on la 500) |
1   |
ea |
1,400.00 |
1,400.00 |
1,700.00 |
1,700.00 |
2,100.00 |
2,100.00 |
1.00 |
1.00 |
| 202-02-28 |
removal of 9.0 m x 14.9 m wood frame residence on
concrete piers (lt. of sta. 5+210 on fifth street) |
1   |
ea |
3,500.00 |
3,500.00 |
2,700.00 |
2,700.00 |
3,700.00 |
3,700.00 |
1.00 |
1.00 |
| 202-02-29 |
removal of 10.5 m x 11.5 m wood frame residence on
piers (rt. of sta. 5+180 on jones street) |
1   |
ea |
1,800.00 |
1,800.00 |
2,700.00 |
2,700.00 |
3,320.00 |
3,320.00 |
1.00 |
1.00 |
| 202-02-30 |
removal of 3.7 m x 3.0 m wood frame shed on slab (rt.
of sta. 5+180 on jones street) |
1   |
ea |
750.00 |
750.00 |
550.00 |
550.00 |
250.00 |
250.00 |
1.00 |
1.00 |
| 202-02-31 |
removal of 3.0 m x 3.7 m metal shed (lt. of sta.
5+190 on jones street) |
1   |
ea |
750.00 |
750.00 |
550.00 |
550.00 |
200.00 |
200.00 |
1.00 |
1.00 |
| 202-02-32 |
removal of 3.0 m x 3.0 m wood frame greenhouse (lt. of
sta. 5+190 on jones street) |
1   |
ea |
750.00 |
750.00 |
275.00 |
275.00 |
200.00 |
200.00 |
1.00 |
1.00 |
| 202-02-33 |
removal of 7.9 m x 6.6 m wood frame residence on piers
(lt. of sta. 5+190 on jones street) |
1   |
ea |
1,800.00 |
1,800.00 |
2,700.00 |
2,700.00 |
1,440.00 |
1,440.00 |
1.00 |
1.00 |
| 202-02-34 |
removal of 7.9 m x 9.4 m wood frame shed on slab (lt.
of sta. 5+218 on jones street) |
1   |
ea |
1,800.00 |
1,800.00 |
550.00 |
550.00 |
2,050.00 |
2,050.00 |
1.00 |
1.00 |
| 202-02-35 |
removal of 16.8 m x 11.7 m wood frame residence on
piers (rt. of sta. 5+266 on jones street) |
1   |
ea |
1,800.00 |
1,800.00 |
2,700.00 |
2,700.00 |
5,420.00 |
5,420.00 |
1.00 |
1.00 |
| 202-02-36 |
removal of 9.5 m x 17.7 m wood frame residence on
piers (rt. of sta. 5+075 on la 500)(contains non-friable asbestos) |
1   |
ea |
1,800.00 |
1,800.00 |
2,700.00 |
2,700.00 |
4,650.00 |
4,650.00 |
1.00 |
1.00 |
| 203-01 |
general excavation
|
243,840   |
cu m |
6.80 |
1,658,112.00 |
4.85 |
1,182,624.00 |
3.60 |
877,824.00 |
6.50 |
1,584,960.00 |
| 203-02 |
drainage excavation
|
4,940   |
cu m |
13.50 |
66,690.00 |
8.25 |
40,755.00 |
10.20 |
50,388.00 |
12.00 |
59,280.00 |
| 203-03 |
muck excavation
|
957   |
cu m |
18.00 |
17,226.00 |
18.00 |
17,226.00 |
21.00 |
20,097.00 |
20.00 |
19,140.00 |
| 203-04 |
embankment
|
650,743   |
cu m |
10.80 |
7,028,024.40 |
9.75 |
6,344,744.25 |
10.00 |
6,507,430.00 |
11.00 |
7,158,173.00 |
| 203-05 |
nonplastic embankment
|
8,241   |
cu m |
126.00 |
1,038,366.00 |
100.00 |
824,100.00 |
81.00 |
667,521.00 |
90.00 |
741,690.00 |
| 204-02 |
temporary hay or straw bales
|
240   |
ea |
30.00 |
7,200.00 |
20.00 |
4,800.00 |
13.50 |
3,240.00 |
10.00 |
2,400.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
326   |
ea |
150.00 |
48,900.00 |
175.00 |
57,050.00 |
108.00 |
35,208.00 |
130.00 |
42,380.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
5   |
ea |
750.00 |
3,750.00 |
1,300.00 |
6,500.00 |
185.00 |
925.00 |
1,000.00 |
5,000.00 |
| 204-06 |
temporary silt fencing
|
23,575   |
ln m |
5.00 |
117,875.00 |
9.00 |
212,175.00 |
7.25 |
170,918.75 |
4.00 |
94,300.00 |
| 204-07 |
temporary stone construction entrance
|
3   |
ea |
3,000.00 |
9,000.00 |
3,200.00 |
9,600.00 |
4,250.00 |
12,750.00 |
2,000.00 |
6,000.00 |
| 302-01-01 |
class ii base course (stone or recycled pccp)
|
2,964.7 |
cu m |
125.00 |
370,587.50 |
120.00 |
355,764.00 |
135.00 |
400,234.50 |
140.00 |
415,058.00 |
| 304-01 |
lime
|
1,385.22 |
Mg |
160.00 |
221,635.20 |
100.00 |
138,522.00 |
1.00 |
1,385.22 |
150.00 |
207,783.00 |
| 304-03-D |
lime treatment (type c) (300 mm thick)
|
91,615   |
sq m |
1.20 |
109,938.00 |
1.00 |
91,615.00 |
6.10 |
558,851.50 |
2.80 |
256,522.00 |
| 305-01-D |
subgrade layer (300 mm thick)
|
183,232   |
sq m |
9.50 |
1,740,704.00 |
12.25 |
2,244,592.00 |
8.75 |
1,603,280.00 |
11.00 |
2,015,552.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,010   |
cu m |
148.00 |
149,480.00 |
122.00 |
123,220.00 |
120.00 |
121,200.00 |
75.00 |
75,750.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
1,100.0 |
cu m |
110.00 |
121,000.00 |
122.00 |
134,200.00 |
165.00 |
181,500.00 |
80.00 |
88,000.00 |
| 502-01-A-01 |
superpave asphaltic concrete drives, turnouts and
miscellaneous (side roads) |
573.0 |
Mg |
110.00 |
63,030.00 |
140.00 |
80,220.00 |
152.00 |
87,096.00 |
150.00 |
85,950.00 |
| 502-01-01 |
superpave asphaltic concrete (side roads)
|
2,298.9 |
Mg |
110.00 |
252,879.00 |
140.00 |
321,846.00 |
110.00 |
252,879.00 |
110.00 |
252,879.00 |
| 701-01-I |
cross drain pipe (600 mm rcp/pcp)
|
101.3 |
ln m |
390.00 |
39,507.00 |
300.00 |
30,390.00 |
170.00 |
17,221.00 |
300.00 |
30,390.00 |
| 701-01-K |
cross drain pipe (750 mm rcp/pcp)
|
53.7 |
ln m |
590.00 |
31,683.00 |
350.00 |
18,795.00 |
235.00 |
12,619.50 |
320.00 |
17,184.00 |
| 701-01-M |
cross drain pipe (900 mm rcp/pcp)
|
118.4 |
ln m |
570.00 |
67,488.00 |
450.00 |
53,280.00 |
800.00 |
94,720.00 |
380.00 |
44,992.00 |
| 701-01-O |
cross drain pipe (1200 mm rcp/pcp)
|
214.1 |
ln m |
730.00 |
156,293.00 |
700.00 |
149,870.00 |
815.00 |
174,491.50 |
600.00 |
128,460.00 |
| 701-02-D |
cross drain pipe arch (600 mm equiv. rcpa)
|
43.0 |
ln m |
590.00 |
25,370.00 |
425.00 |
18,275.00 |
300.00 |
12,900.00 |
270.00 |
11,610.00 |
| 701-03-G |
storm drain pipe (450 mm rcp/pcp)
|
1,000.5 |
ln m |
290.00 |
290,145.00 |
200.00 |
200,100.00 |
145.00 |
145,072.50 |
200.00 |
200,100.00 |
| 701-04-B |
storm drain pipe arch (450 mm equiv. rcpa)
|
58.6 |
ln m |
370.00 |
21,682.00 |
250.00 |
14,650.00 |
220.00 |
12,892.00 |
270.00 |
15,822.00 |
| 701-05-G |
side drain pipe (450 mm)
|
777.1 |
ln m |
190.00 |
147,649.00 |
200.00 |
155,420.00 |
140.00 |
108,794.00 |
170.00 |
132,107.00 |
| 701-05-I |
side drain pipe (600 mm)
|
210.8 |
ln m |
290.00 |
61,132.00 |
275.00 |
57,970.00 |
185.00 |
38,998.00 |
200.00 |
42,160.00 |
| 701-05-K |
side drain pipe (750 mm)
|
19.5 |
ln m |
480.00 |
9,360.00 |
325.00 |
6,337.50 |
250.00 |
4,875.00 |
240.00 |
4,680.00 |
| 701-10-I |
reinforced concrete pipe (extension)(600 mm)
|
15.5 |
ln m |
450.00 |
6,975.00 |
335.00 |
5,192.50 |
210.00 |
3,255.00 |
400.00 |
6,200.00 |
| 701-10-K |
reinforced concrete pipe (extension)(750 mm)
|
37.0 |
ln m |
520.00 |
19,240.00 |
375.00 |
13,875.00 |
255.00 |
9,435.00 |
440.00 |
16,280.00 |
| 702-02-A |
manholes (mh-06)
|
1   |
ea |
6,000.00 |
6,000.00 |
3,500.00 |
3,500.00 |
4,400.00 |
4,400.00 |
4,000.00 |
4,000.00 |
| 702-02-B |
manholes (r-cb-11)
|
1   |
ea |
3,000.00 |
3,000.00 |
9,500.00 |
9,500.00 |
4,200.00 |
4,200.00 |
4,000.00 |
4,000.00 |
| 702-03-A |
catch basins (cb-01m)
|
41   |
ea |
3,500.00 |
143,500.00 |
2,400.00 |
98,400.00 |
3,600.00 |
147,600.00 |
2,500.00 |
102,500.00 |
| 702-03-B |
catch basins (cb-02m)
|
2   |
ea |
4,600.00 |
9,200.00 |
5,500.00 |
11,000.00 |
3,400.00 |
6,800.00 |
3,500.00 |
7,000.00 |
| 702-04-A |
adjusting manholes
|
4   |
ea |
500.00 |
2,000.00 |
3,500.00 |
14,000.00 |
1,450.00 |
5,800.00 |
1,000.00 |
4,000.00 |
| 702-07-A |
cross drain safety end (type 1)
|
3   |
ea |
8,000.00 |
24,000.00 |
2,400.00 |
7,200.00 |
2,000.00 |
6,000.00 |
1,800.00 |
5,400.00 |
| 702-08-A |
side drain safety end (type 1)
|
18   |
ea |
2,400.00 |
43,200.00 |
2,200.00 |
39,600.00 |
1,350.00 |
24,300.00 |
1,800.00 |
32,400.00 |
| 704-01-A |
guard rail (single thrie beam)(950 mm post spacing)
|
297.18 |
ln m |
115.00 |
34,175.70 |
165.00 |
49,034.70 |
99.00 |
29,420.82 |
100.00 |
29,718.00 |
| 704-03 |
blocked out guard rail
|
1,383.04 |
ln m |
65.00 |
89,897.60 |
66.00 |
91,280.64 |
55.75 |
77,104.48 |
56.00 |
77,450.24 |
| 704-08-A |
guard rail transitions (single thrie beam)
|
228.58 |
ln m |
85.00 |
19,429.30 |
190.00 |
43,430.20 |
75.00 |
17,143.50 |
75.00 |
17,143.50 |
| 704-11-A |
guard rail end treatment (flared)
|
33   |
ea |
2,200.00 |
72,600.00 |
2,200.00 |
72,600.00 |
1,975.00 |
65,175.00 |
2,000.00 |
66,000.00 |
| 705-01 |
barbed wire fence
|
5,952   |
ln m |
18.50 |
110,112.00 |
17.00 |
101,184.00 |
15.50 |
92,256.00 |
16.00 |
95,232.00 |
| 705-02 |
combination mesh & barbed wire fence
|
2,199   |
ln m |
19.50 |
42,880.50 |
19.00 |
41,781.00 |
17.36 |
38,174.64 |
18.00 |
39,582.00 |
| 705-04 |
single swinging driveway gates
|
10   |
ea |
450.00 |
4,500.00 |
500.00 |
5,000.00 |
450.00 |
4,500.00 |
450.00 |
4,500.00 |
| 705-05 |
double swinging driveway gates
|
1   |
dbgt |
900.00 |
900.00 |
650.00 |
650.00 |
600.00 |
600.00 |
600.00 |
600.00 |
| 705-06-A |
chain link fence (1200 mm height)
|
94   |
ln m |
68.00 |
6,392.00 |
60.00 |
5,640.00 |
54.00 |
5,076.00 |
55.00 |
5,170.00 |
| 705-07-A |
4.0-meter single gates for chain link fence (1200mm
height) |
1   |
ea |
700.00 |
700.00 |
825.00 |
825.00 |
750.00 |
750.00 |
800.00 |
800.00 |
| 705-08-A |
4.0-meter double gates for chain link fence (1200mm
height) |
1   |
dbgt |
1,100.00 |
1,100.00 |
1,150.00 |
1,150.00 |
1,050.00 |
1,050.00 |
1,100.00 |
1,100.00 |
| 706-02-C |
concrete drive (150 mm thick)
|
1,145.6 |
sq m |
90.00 |
103,104.00 |
60.00 |
68,736.00 |
45.00 |
51,552.00 |
60.00 |
68,736.00 |
| 706-03-C |
incidental concrete paving (150 mm thick)
|
499.0 |
sq m |
68.00 |
33,932.00 |
80.00 |
39,920.00 |
43.00 |
21,457.00 |
90.00 |
44,910.00 |
| 708-01 |
right-of-way monument
|
187   |
ea |
350.00 |
65,450.00 |
1.00 |
187.00 |
85.00 |
15,895.00 |
120.00 |
22,440.00 |
| 708-02 |
right-of-way monument witness post
|
187   |
ea |
350.00 |
65,450.00 |
1.00 |
187.00 |
85.00 |
15,895.00 |
120.00 |
22,440.00 |
| 711-01-D |
riprap (25 kg, 675 mm thick)
|
4,256   |
sq m |
85.00 |
361,760.00 |
65.00 |
276,640.00 |
51.00 |
217,056.00 |
90.00 |
383,040.00 |
| 711-01-H |
riprap (455 kg,1200 mm thick)
|
700   |
sq m |
150.00 |
105,000.00 |
112.00 |
78,400.00 |
200.00 |
140,000.00 |
140.00 |
98,000.00 |
| 711-04 |
geotextile fabric
|
8,426   |
sq m |
2.00 |
16,852.00 |
2.25 |
18,958.50 |
3.80 |
32,018.80 |
2.50 |
21,065.00 |
| 712-01-A |
concrete cast-in-place revetment (100 mm thick)
|
3,500   |
sq m |
63.00 |
220,500.00 |
47.00 |
164,500.00 |
55.00 |
192,500.00 |
75.00 |
262,500.00 |
| 713-01 |
temporary signs & barricades
|
lump |
lump |
250,000.00 |
250,000.00 |
150,000.00 |
150,000.00 |
115,000.00 |
115,000.00 |
300,000.00 |
300,000.00 |
| 713-03-A |
temporary pavement markings (100 mm width)
|
20,820   |
ln m |
0.76 |
15,823.20 |
0.35 |
7,287.00 |
0.33 |
6,870.60 |
0.35 |
7,287.00 |
| 716-01-A |
mulch (vegetative)
|
16.2 |
hctr |
1,900.00 |
30,780.00 |
1,900.00 |
30,780.00 |
1,729.00 |
28,009.80 |
1,600.00 |
25,920.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
127,929   |
sq m |
1.45 |
185,497.05 |
1.30 |
166,307.70 |
1.22 |
156,073.38 |
0.70 |
89,550.30 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
6,170   |
sq m |
2.20 |
13,574.00 |
2.00 |
12,340.00 |
1.80 |
11,106.00 |
1.70 |
10,489.00 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
3,627   |
sq m |
2.20 |
7,979.40 |
2.10 |
7,616.70 |
1.90 |
6,891.30 |
2.40 |
8,704.80 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
150   |
sq m |
3.50 |
525.00 |
3.25 |
487.50 |
3.00 |
450.00 |
5.00 |
750.00 |
| 722-02 |
project site laboratory (equipped)
|
2   |
ea |
70,000.00 |
140,000.00 |
10,000.00 |
20,000.00 |
25,000.00 |
50,000.00 |
30,000.00 |
60,000.00 |
| 724-01-B |
pavement patching (300 mm minimum thickness)
|
825   |
sq m |
150.00 |
123,750.00 |
105.00 |
86,625.00 |
250.00 |
206,250.00 |
100.00 |
82,500.00 |
| 725-01 |
temporary detour roads
|
885.8 |
ln m |
750.00 |
664,350.00 |
625.00 |
553,625.00 |
1,000.00 |
885,800.00 |
800.00 |
708,640.00 |
| 726-01 |
bedding material
|
454.3 |
cu m |
125.00 |
56,787.50 |
110.00 |
49,973.00 |
82.00 |
37,252.60 |
100.00 |
45,430.00 |
| 727-01 |
mobilization
|
lump |
lump |
4,550,000.00 |
4,550,000.00 |
4,100,000.00 |
4,100,000.00 |
4,700,000.00 |
4,700,000.00 |
5,000,000.00 |
5,000,000.00 |
| 729-01-A |
sign (type a)(r1-1)(0.762 m x 0.762 m)
|
1.16 |
sq m |
210.00 |
243.60 |
100.00 |
116.00 |
300.00 |
348.00 |
300.00 |
348.00 |
| 729-16-C |
object marker assembly (type 3)
|
30   |
ea |
80.00 |
2,400.00 |
85.00 |
2,550.00 |
75.00 |
2,250.00 |
75.00 |
2,250.00 |
| 729-21 |
u-channel post (12-foot)
|
2   |
each |
80.00 |
160.00 |
85.00 |
170.00 |
110.00 |
220.00 |
600.00 |
1,200.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
3,277   |
ea |
13.25 |
43,420.25 |
11.00 |
36,047.00 |
10.00 |
32,770.00 |
10.00 |
32,770.00 |
| 731-02 |
reflectorized raised pavement markers
|
4,075   |
ea |
7.00 |
28,525.00 |
5.00 |
20,375.00 |
4.50 |
18,337.50 |
5.00 |
20,375.00 |
| 732-02-A |
plastic pavement striping (solid line)(100 mm width)
|
58.438 |
km |
1,850.00 |
108,110.30 |
900.00 |
52,594.20 |
1,327.00 |
77,547.23 |
1,350.00 |
78,891.30 |
| 732-02-C |
plastic pavement striping (solid line)(200 mm width)
|
0.491 |
km |
4,000.00 |
1,964.00 |
2,100.00 |
1,031.10 |
3,200.00 |
1,571.20 |
3,200.00 |
1,571.20 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
13   |
ea |
190.00 |
2,470.00 |
150.00 |
1,950.00 |
139.00 |
1,807.00 |
150.00 |
1,950.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
13   |
ea |
230.00 |
2,990.00 |
150.00 |
1,950.00 |
139.00 |
1,807.00 |
150.00 |
1,950.00 |
| 732-05 |
removal of existing markings
|
9.077 |
km |
4,300.00 |
39,031.10 |
1,500.00 |
13,615.50 |
2,151.00 |
19,524.63 |
2,200.00 |
19,969.40 |
| 735-01 |
mailboxes
|
46   |
ea |
25.00 |
1,150.00 |
1.00 |
46.00 |
1.00 |
46.00 |
1.00 |
46.00 |
| 735-02 |
mailbox supports (single)
|
46   |
ea |
200.00 |
9,200.00 |
140.00 |
6,440.00 |
125.00 |
5,750.00 |
130.00 |
5,980.00 |
| 736-01 |
trenching and backfilling
|
10   |
ln m |
23.00 |
230.00 |
22.00 |
220.00 |
20.00 |
200.00 |
20.00 |
200.00 |
| 736-04-B |
signal support (9.1 m strain pole)
|
4   |
each |
9,500.00 |
38,000.00 |
8,500.00 |
34,000.00 |
8,000.00 |
32,000.00 |
8,000.00 |
32,000.00 |
| 736-05-B |
signal head (1-section y)(led)
|
4   |
each |
890.00 |
3,560.00 |
825.00 |
3,300.00 |
750.00 |
3,000.00 |
750.00 |
3,000.00 |
| 736-05-C |
signal head (1-section r)(led)
|
4   |
each |
890.00 |
3,560.00 |
825.00 |
3,300.00 |
750.00 |
3,000.00 |
750.00 |
3,000.00 |
| 736-06-A |
signal service (pole mounted for flasher switch
assembly) |
1   |
each |
1,700.00 |
1,700.00 |
1,650.00 |
1,650.00 |
1,500.00 |
1,500.00 |
1,500.00 |
1,500.00 |
| 736-11-A |
conduit (76.2 mm sch. 80)
|
10   |
ln m |
40.00 |
400.00 |
38.00 |
380.00 |
35.00 |
350.00 |
35.00 |
350.00 |
| 736-12-A |
conductor, 3c (power)
|
10   |
ln m |
23.00 |
230.00 |
22.00 |
220.00 |
20.00 |
200.00 |
20.00 |
200.00 |
| 739-01 |
hydro-seeding
|
89.6 |
hctr |
2,800.00 |
250,880.00 |
2,300.00 |
206,080.00 |
2,090.00 |
187,264.00 |
2,700.00 |
241,920.00 |
| 740-01 |
construction layout
|
lump |
lump |
400,000.00 |
400,000.00 |
250,000.00 |
250,000.00 |
290,000.00 |
290,000.00 |
500,000.00 |
500,000.00 |
| 740-02 |
utility oversight and coordination
|
lump |
lump |
33,000.00 |
33,000.00 |
26,000.00 |
26,000.00 |
10,000.00 |
10,000.00 |
40,000.00 |
40,000.00 |
| 744-01 |
traffic control management
|
lump |
lump |
270,000.00 |
270,000.00 |
56,000.00 |
56,000.00 |
10,000.00 |
10,000.00 |
50,000.00 |
50,000.00 |
| 804-01-B |
precast concrete piles (350 mm)
|
368.0 |
ln m |
150.00 |
55,200.00 |
160.00 |
58,880.00 |
380.00 |
139,840.00 |
160.00 |
58,880.00 |
| 804-01-C |
precast concrete piles (400 mm)
|
2,264.0 |
ln m |
160.00 |
362,240.00 |
180.00 |
407,520.00 |
245.00 |
554,680.00 |
190.00 |
430,160.00 |
| 804-01-D |
precast concrete piles (450 mm)
|
660.0 |
ln m |
195.00 |
128,700.00 |
240.00 |
158,400.00 |
345.00 |
227,700.00 |
240.00 |
158,400.00 |
| 804-01-F |
precast concrete piles (600 mm)
|
4,213.2 |
ln m |
285.00 |
1,200,762.00 |
425.00 |
1,790,610.00 |
410.00 |
1,727,412.00 |
430.00 |
1,811,676.00 |
| 804-01-H |
precast concrete piles (900 mm)
|
624.0 |
ln m |
700.00 |
436,800.00 |
725.00 |
452,400.00 |
940.00 |
586,560.00 |
750.00 |
468,000.00 |
| 804-05 |
precast concrete test piles
|
7   |
ea |
20,000.00 |
140,000.00 |
22,000.00 |
154,000.00 |
48,000.00 |
336,000.00 |
21,000.00 |
147,000.00 |
| 804-09 |
loading test piles
|
7   |
ea |
15,000.00 |
105,000.00 |
26,500.00 |
185,500.00 |
5,000.00 |
35,000.00 |
28,000.00 |
196,000.00 |
| 804-10 |
reloading test piles
|
7   |
ea |
1,000.00 |
7,000.00 |
2,400.00 |
16,800.00 |
1,000.00 |
7,000.00 |
3,000.00 |
21,000.00 |
| 804-11 |
redriving test piles
|
7   |
ea |
1,000.00 |
7,000.00 |
5,200.00 |
36,400.00 |
300.00 |
2,100.00 |
3,000.00 |
21,000.00 |
| 804-12 |
loading permanent piles
|
7   |
ea |
1,000.00 |
7,000.00 |
1,000.00 |
7,000.00 |
1,500.00 |
10,500.00 |
1,000.00 |
7,000.00 |
| 804-17 |
dynamic monitoring
|
7   |
ea |
8,000.00 |
56,000.00 |
1,200.00 |
8,400.00 |
2,000.00 |
14,000.00 |
1,100.00 |
7,700.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
139.23 |
cu m |
1,500.00 |
208,845.00 |
2,000.00 |
278,460.00 |
2,150.00 |
299,344.50 |
1,300.00 |
180,999.00 |
| 805-01-F |
class a concrete (bents)
|
1,115.95 |
cu m |
800.00 |
892,760.00 |
925.00 |
1,032,253.75 |
875.00 |
976,456.25 |
900.00 |
1,004,355.00 |
| 805-03 |
class aa concrete
|
3,759.36 |
cu m |
650.00 |
2,443,584.00 |
880.00 |
3,308,236.80 |
815.00 |
3,063,878.40 |
850.00 |
3,195,456.00 |
| 805-08-C |
precast-prestressed concrete girders (type iii)
|
4,366.75 |
ln m |
290.00 |
1,266,357.50 |
420.00 |
1,834,035.00 |
345.00 |
1,506,528.75 |
400.00 |
1,746,700.00 |
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
1,399.42 |
ln m |
410.00 |
573,762.20 |
630.00 |
881,634.60 |
490.00 |
685,715.80 |
600.00 |
839,652.00 |
| 805-11 |
strip seal joints
|
216.00 |
ln m |
500.00 |
108,000.00 |
430.00 |
92,880.00 |
490.00 |
105,840.00 |
450.00 |
97,200.00 |
| 805-12-A |
reinforced concrete box culverts (1200 mm x 900 mm)
|
32.42 |
ln m |
1,700.00 |
55,114.00 |
1,400.00 |
45,388.00 |
870.00 |
28,205.40 |
900.00 |
29,178.00 |
| 805-12-E |
reinforced concrete box culverts (1200 mm x 1200 mm)
|
91.97 |
ln m |
1,400.00 |
128,758.00 |
1,400.00 |
128,758.00 |
1,550.00 |
142,553.50 |
950.00 |
87,371.50 |
| 805-12-F |
reinforced concrete box culverts (1500 mm x 1200 mm)
|
85.00 |
ln m |
1,200.00 |
102,000.00 |
1,700.00 |
144,500.00 |
1,100.00 |
93,500.00 |
1,200.00 |
102,000.00 |
| 805-12-I |
reinforced concrete box culverts (1500 mm x 1500 mm)
|
158.00 |
ln m |
1,500.00 |
237,000.00 |
1,900.00 |
300,200.00 |
1,600.00 |
252,800.00 |
1,300.00 |
205,400.00 |
| 805-12-J |
reinforced concrete box culverts (1800 mm x 1500 mm)
|
67.00 |
ln m |
2,000.00 |
134,000.00 |
2,400.00 |
160,800.00 |
1,700.00 |
113,900.00 |
1,500.00 |
100,500.00 |
| 805-12-L |
reinforced concrete box culverts (2400 mm x 1500 mm)
|
31.40 |
ln m |
3,200.00 |
100,480.00 |
2,600.00 |
81,640.00 |
2,050.00 |
64,370.00 |
2,000.00 |
62,800.00 |
| 805-12-M |
reinforced concrete box culverts (1800 mm x 1800 mm)
|
60.30 |
ln m |
2,600.00 |
156,780.00 |
2,900.00 |
174,870.00 |
2,400.00 |
144,720.00 |
1,700.00 |
102,510.00 |
| 805-12-O |
reinforced concrete box culverts (2400 mm x 1800 mm)
|
41.00 |
ln m |
3,000.00 |
123,000.00 |
3,200.00 |
131,200.00 |
1,700.00 |
69,700.00 |
2,100.00 |
86,100.00 |
| 805-12-S |
reinforced concrete box culverts (2400 mm x 2400 mm)
|
110.00 |
ln m |
2,200.00 |
242,000.00 |
3,400.00 |
374,000.00 |
2,500.00 |
275,000.00 |
2,300.00 |
253,000.00 |
| 806-01 |
deformed reinforcing steel
|
610,302   |
kg |
1.58 |
964,277.16 |
1.88 |
1,147,367.76 |
1.80 |
1,098,543.60 |
2.00 |
1,220,604.00 |
| 807-06 |
structural metalwork
|
lump |
lump |
20,000.00 |
20,000.00 |
11,000.00 |
11,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
| 810-01 |
concrete railing (barrier)
|
2,487.94 |
ln m |
150.00 |
373,191.00 |
165.00 |
410,510.10 |
150.00 |
373,191.00 |
140.00 |
348,311.60 |
| 813-01 |
concrete approach slabs
|
1,742.40 |
sq m |
210.00 |
365,904.00 |
265.00 |
461,736.00 |
225.00 |
392,040.00 |
220.00 |
383,328.00 |
| 814-01-J |
drilled shaft (1650 mm)
|
252.00 |
ln m |
5,100.00 |
1,285,200.00 |
5,100.00 |
1,285,200.00 |
3,850.00 |
970,200.00 |
3,000.00 |
756,000.00 |
| 814-04 |
crosshole sonic logging (1650 mm)
|
9   |
ea |
1,800.00 |
16,200.00 |
4,400.00 |
39,600.00 |
2,600.00 |
23,400.00 |
2,000.00 |
18,000.00 |
| S-001 |
rumble strips (ground-in)
|
24.2 |
km |
400.00 |
9,680.00 |
225.00 |
5,445.00 |
330.00 |
7,986.00 |
330.00 |
7,986.00 |
| S-002 |
removal of 015-04-0038 transition road (sta.
110+600.000 to sta. 111+125.880) |
lump |
lump |
22,000.00 |
22,000.00 |
18,000.00 |
18,000.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
| S-003 |
removal of 015-04-0035 transition road (sta.
40+727.600 to sta. 41+260.000) |
lump |
lump |
22,000.00 |
22,000.00 |
18,000.00 |
18,000.00 |
25,000.00 |
25,000.00 |
20,000.00 |
20,000.00 |
| S-004 |
flasher switch (flasher assembly, 2 circuit, pole
mounted cabinet) |
1   |
each |
7,000.00 |
7,000.00 |
6,600.00 |
6,600.00 |
6,000.00 |
6,000.00 |
6,000.00 |
6,000.00 |
| S-005 |
special precautions regarding water supply
|
lump |
lump |
10,000.00 |
10,000.00 |
17,500.00 |
17,500.00 |
100,000.00 |
100,000.00 |
20,000.00 |
20,000.00 |
| S-101 |
retroreflective sheeting panels
|
lump |
lump |
6,500.00 |
6,500.00 |
2,200.00 |
2,200.00 |
20,000.00 |
20,000.00 |
4,000.00 |
4,000.00 |
| | SUBTOTAL GENERAL |
|
|
|
36,324,526.11 |
|
36,795,776.55 |
|
36,650,472.00 |
|
39,006,803.34 |
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A |
pavement alternates
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A1 |
superpave asphaltic concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 302-02-A-01 |
class ii base course (150 mm thick)(stone or recycled
pccp) |
59,884.0 |
sq m |
19.00 |
1,137,796.00 |
18.00 |
1,077,912.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 302-02-C-01 |
class ii base course (250 mm thick)(stone or recycled
pccp) |
123,928.3 |
sq m |
30.00 |
3,717,849.00 |
28.00 |
3,469,992.40 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01 |
superpave asphaltic concrete
|
48,410.8 |
Mg |
85.00 |
4,114,918.00 |
88.00 |
4,260,150.40 |
0.00 |
0.00 |
0.00 |
0.00 |
| 502-01-A |
superpave asphaltic concrete drives, turnouts and
miscellaneous |
6,057.1 |
Mg |
110.00 |
666,281.00 |
110.00 |
666,281.00 |
0.00 |
0.00 |
0.00 |
0.00 |
| 732-03-A |
plastic pavement striping (broken line)(100 mm width)
|
25.051 |
km |
600.00 |
15,030.60 |
342.00 |
8,567.44 |
0.00 |
0.00 |
0.00 |
0.00 |
| | SUBTOTAL ALT A1 |
|
|
|
9,651,874.60 |
|
9,482,903.24 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| ALTERNATE A2 |
portland cement concrete pavement
|
|
|
|
|
|
|
|
|
|
|
| 302-02-A-01 |
class ii base course (150 mm thick)(stone or recycled
pccp) |
59,884.0 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
15.00 |
898,260.00 |
18.50 |
1,107,854.00 |
| 302-02-E-01 |
class ii base course (200 mm thick)(stone or recycled
pccp) |
123,928.3 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
17.00 |
2,106,781.10 |
22.50 |
2,788,386.75 |
| 502-01 |
superpave asphaltic concrete
|
13,450.8 |
Mg |
0.00 |
0.00 |
0.00 |
0.00 |
115.00 |
1,546,842.00 |
115.00 |
1,546,842.00 |
| 601-01-G |
portland cement concrete pavement (200 mm thick)
|
92,519.3 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
49.00 |
4,533,445.70 |
49.00 |
4,533,445.70 |
| 601-02-G |
portland cement concrete pavement (200 mm thick)
(crossovers & turnouts) |
22,398.7 |
sq m |
0.00 |
0.00 |
0.00 |
0.00 |
80.00 |
1,791,896.00 |
62.40 |
1,397,678.88 |
| 601-04 |
portland cement concrete pavement coring
|
143   |
ea |
0.00 |
0.00 |
0.00 |
0.00 |
95.00 |
13,585.00 |
100.00 |
14,300.00 |
| 732-03-A-01 |
plastic pvmt striping(broken line)(100mmwidth)
preformed marking tape (type v) |
25.051 |
km |
0.00 |
0.00 |
0.00 |
0.00 |
3,259.00 |
81,641.21 |
3,300.00 |
82,668.30 |
| | SUBTOTAL ALT A2 |
|
|
|
|
|
|
|
10,972,451.01 |
|
11,471,175.63 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
45,976,400.71 |
|
46,278,679.79 |
|
47,622,923.01 |
|
50,477,978.97 |
| | NUMBER OF DAYS BID AT $3,200 PER DAY. |
|
|
|
2,560,000.00 |
|
2,560,000.00 |
|
2,560,000.00 |
|
2,560,000.00 |
| | LIFE CYCLE COST |
|
|
|
1,643,900.00 |
|
1,643,900.00 |
|
688,300.00 |
|
688,300.00 |
| | TOTAL BID |
|
|
|
50,180,300.71 |
|
50,482,579.79 |
|
50,871,223.01 |
|
53,726,278.97 |
|