Letting of 4/25/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 819-16-0009
Parish: E FELICIANA
Routes: LA 955
Description: JCT. LA 957 - JCT. LA 19
Type Const: grading, cold planing asphaltic concrete, superpave asphaltic concrete pavement,
cement treated base course, lime treatment, and related work.
Estimated Construction Cost: $1,416,544.22
 
RankLicenseBidderConstruction Bid
1 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $1,361,106.99
2 00481 COASTAL BRIDGE CO., L.L.C. $1,381,199.96
3 00046 BARBER BROS. CONTRACTING CO., L.L.C $1,385,501.90
4 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,389,763.86
 
Item Number Item Description Quantity Unit of Measure - 1 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 2 -
COASTAL BRIDGE CO., L.L.C.
- 3 -
BARBER BROS. CONTRACTING CO., L.L.C
- 4 -
DIAMOND B CONSTRUCTION CO., L.L.C.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 2      SQYD 30.00 60.00 15.00 30.00 50.00 100.00 1,100.00 2,200.00
203-08 borrow (vehicular measurement) 1,500      CUYD 5.00 7,500.00 1.00 1,500.00 10.00 15,000.00 17.25 25,875.00
203-08-A borrow (vehicular meas.)(selected soils) 1,000      CUYD 5.00 5,000.00 1.00 1,000.00 10.00 10,000.00 23.00 23,000.00
204-05-A temporary sediment check dams (hay) 50      EACH 100.00 5,000.00 10.00 500.00 150.00 7,500.00 260.00 13,000.00
204-06 temporary silt fencing 38,333      LNFT 1.00 38,333.00 0.10 3,833.30 1.00 38,333.00 2.50 95,832.50
304-01 lime 46.08   TON 100.00 4,608.00 150.00 6,912.00 180.00 8,294.40 137.00 6,312.96
304-03-D lime treatment (type c) (12" thick) 609      SQYD 3.00 1,827.00 2.00 1,218.00 4.50 2,740.50 12.00 7,308.00
304-04-D lime treatment (type d) (12" thick) 1,219      SQYD 3.00 3,657.00 2.00 2,438.00 5.00 6,095.00 8.00 9,752.00
308-01-A in-place cement treated base course (12" thick) 48,757      SQYD 7.95 387,618.15 6.40 312,044.80 7.50 365,677.50 7.00 341,299.00
401-02 aggregate surface course (adjusted vehicular
measurement)
1,384      CUYD 5.00 6,920.00 95.00 131,480.00 55.00 76,120.00 46.00 63,664.00
502-01 superpave asphaltic concrete 8,982.0    TON 60.00 538,920.00 70.00 628,740.00 70.00 628,740.00 63.00 565,866.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
457.6    TON 120.00 54,912.00 1.00 457.60 100.00 45,760.00 115.00 52,624.00
509-01 cold planing asphaltic pavement 305      SQYD 30.00 9,150.00 15.00 4,575.00 12.00 3,660.00 39.00 11,895.00
509-02 contractor retained reclaimed asphaltic pavement - 13      CUYD 0.00 0.00 1.00 - 13.00 0.00 0.00 0.10 - 1.30
713-01 temporary signs & barricades lump      LUMP 80,000.00 80,000.00 7,500.00 7,500.00 30,000.00 30,000.00 9,000.00 9,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
10.890  MILE 500.00 5,445.00 400.00 4,356.00 300.00 3,267.00 150.00 1,633.50
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
5.964  MILE 10.00 59.64 295.00 1,759.38 375.00 2,236.50 350.00 2,087.40
713-05-A temporary pavement markings (solid line)(4" width) 27.420  MILE 10.00 274.20 1.00 27.42 500.00 13,710.00 500.00 13,710.00
722-01 project site laboratory 1      EACH 1,500.00 1,500.00 4,500.00 4,500.00 5,000.00 5,000.00 5,000.00 5,000.00
727-01 mobilization lump      LUMP 100,000.00 100,000.00 200,000.00 200,000.00 45,000.00 45,000.00 65,000.00 65,000.00
729-16-B object marker assembly (type 2) 20      EACH 50.00 1,000.00 55.00 1,100.00 60.00 1,200.00 90.00 1,800.00
729-16-C object marker assembly (type 3) 16      EACH 60.00 960.00 85.00 1,360.00 90.00 1,440.00 90.00 1,440.00
731-02 reflectorized raised pavement markers 480      EACH 6.00 2,880.00 5.10 2,448.00 6.00 2,880.00 6.00 2,880.00
732-02-A plastic pavement striping (solid line) (4" width) 11.560  MILE 2,500.00 28,900.00 2,250.00 26,010.00 2,600.00 30,056.00 2,600.00 30,056.00
732-03-A plastic pavement striping (broken line)(4" width) 1.988  MILE 1,000.00 1,988.00 795.00 1,580.46 1,000.00 1,988.00 850.00 1,689.80
735-01 mailboxes 28      EACH 5.00 140.00 1.00 28.00 3.00 84.00 25.00 700.00
735-02 mailbox supports (single) 26      EACH 130.00 3,380.00 125.00 3,250.00 140.00 3,640.00 150.00 3,900.00
735-03 mailbox supports (double) 1      EACH 175.00 175.00 300.00 300.00 200.00 200.00 250.00 250.00
739-01 hydro-seeding 4.40   ACRE 1,000.00 4,400.00 1,100.00 4,840.00 1,200.00 5,280.00 1,100.00 4,840.00
740-01 construction layout lump      LUMP 25,000.00 25,000.00 8,500.00 8,500.00 10,000.00 10,000.00 10,000.00 10,000.00
744-01 traffic control management lump      LUMP 30,000.00 30,000.00 7,500.00 7,500.00 15,000.00 15,000.00 6,000.00 6,000.00
S-001 cleaning existing ditches 1,100      LNFT 10.00 11,000.00 10.00 11,000.00 5.00 5,500.00 9.00 9,900.00
S-002 saw cutting driveways (6" deep) 50      LNFT 10.00 500.00 8.50 425.00 20.00 1,000.00 25.00 1,250.00
                       
 CONTRACTOR TOTAL       1,361,106.99   1,381,199.96   1,385,501.90   1,389,763.86