| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 2 - COASTAL BRIDGE CO., L.L.C. |
- 3 - BARBER BROS. CONTRACTING CO., L.L.C |
- 4 - DIAMOND B CONSTRUCTION CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
2   |
SQYD |
30.00 |
60.00 |
15.00 |
30.00 |
50.00 |
100.00 |
1,100.00 |
2,200.00 |
| 203-08 |
borrow (vehicular measurement)
|
1,500   |
CUYD |
5.00 |
7,500.00 |
1.00 |
1,500.00 |
10.00 |
15,000.00 |
17.25 |
25,875.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
1,000   |
CUYD |
5.00 |
5,000.00 |
1.00 |
1,000.00 |
10.00 |
10,000.00 |
23.00 |
23,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
50   |
EACH |
100.00 |
5,000.00 |
10.00 |
500.00 |
150.00 |
7,500.00 |
260.00 |
13,000.00 |
| 204-06 |
temporary silt fencing
|
38,333   |
LNFT |
1.00 |
38,333.00 |
0.10 |
3,833.30 |
1.00 |
38,333.00 |
2.50 |
95,832.50 |
| 304-01 |
lime
|
46.08 |
TON |
100.00 |
4,608.00 |
150.00 |
6,912.00 |
180.00 |
8,294.40 |
137.00 |
6,312.96 |
| 304-03-D |
lime treatment (type c) (12" thick)
|
609   |
SQYD |
3.00 |
1,827.00 |
2.00 |
1,218.00 |
4.50 |
2,740.50 |
12.00 |
7,308.00 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,219   |
SQYD |
3.00 |
3,657.00 |
2.00 |
2,438.00 |
5.00 |
6,095.00 |
8.00 |
9,752.00 |
| 308-01-A |
in-place cement treated base course (12" thick)
|
48,757   |
SQYD |
7.95 |
387,618.15 |
6.40 |
312,044.80 |
7.50 |
365,677.50 |
7.00 |
341,299.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,384   |
CUYD |
5.00 |
6,920.00 |
95.00 |
131,480.00 |
55.00 |
76,120.00 |
46.00 |
63,664.00 |
| 502-01 |
superpave asphaltic concrete
|
8,982.0 |
TON |
60.00 |
538,920.00 |
70.00 |
628,740.00 |
70.00 |
628,740.00 |
63.00 |
565,866.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
457.6 |
TON |
120.00 |
54,912.00 |
1.00 |
457.60 |
100.00 |
45,760.00 |
115.00 |
52,624.00 |
| 509-01 |
cold planing asphaltic pavement
|
305   |
SQYD |
30.00 |
9,150.00 |
15.00 |
4,575.00 |
12.00 |
3,660.00 |
39.00 |
11,895.00 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 13   |
CUYD |
0.00 |
0.00 |
1.00 |
- 13.00 |
0.00 |
0.00 |
0.10 |
- 1.30 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
80,000.00 |
80,000.00 |
7,500.00 |
7,500.00 |
30,000.00 |
30,000.00 |
9,000.00 |
9,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
10.890 |
MILE |
500.00 |
5,445.00 |
400.00 |
4,356.00 |
300.00 |
3,267.00 |
150.00 |
1,633.50 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.964 |
MILE |
10.00 |
59.64 |
295.00 |
1,759.38 |
375.00 |
2,236.50 |
350.00 |
2,087.40 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
27.420 |
MILE |
10.00 |
274.20 |
1.00 |
27.42 |
500.00 |
13,710.00 |
500.00 |
13,710.00 |
| 722-01 |
project site laboratory
|
1   |
EACH |
1,500.00 |
1,500.00 |
4,500.00 |
4,500.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
200,000.00 |
200,000.00 |
45,000.00 |
45,000.00 |
65,000.00 |
65,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
20   |
EACH |
50.00 |
1,000.00 |
55.00 |
1,100.00 |
60.00 |
1,200.00 |
90.00 |
1,800.00 |
| 729-16-C |
object marker assembly (type 3)
|
16   |
EACH |
60.00 |
960.00 |
85.00 |
1,360.00 |
90.00 |
1,440.00 |
90.00 |
1,440.00 |
| 731-02 |
reflectorized raised pavement markers
|
480   |
EACH |
6.00 |
2,880.00 |
5.10 |
2,448.00 |
6.00 |
2,880.00 |
6.00 |
2,880.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
11.560 |
MILE |
2,500.00 |
28,900.00 |
2,250.00 |
26,010.00 |
2,600.00 |
30,056.00 |
2,600.00 |
30,056.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.988 |
MILE |
1,000.00 |
1,988.00 |
795.00 |
1,580.46 |
1,000.00 |
1,988.00 |
850.00 |
1,689.80 |
| 735-01 |
mailboxes
|
28   |
EACH |
5.00 |
140.00 |
1.00 |
28.00 |
3.00 |
84.00 |
25.00 |
700.00 |
| 735-02 |
mailbox supports (single)
|
26   |
EACH |
130.00 |
3,380.00 |
125.00 |
3,250.00 |
140.00 |
3,640.00 |
150.00 |
3,900.00 |
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
175.00 |
175.00 |
300.00 |
300.00 |
200.00 |
200.00 |
250.00 |
250.00 |
| 739-01 |
hydro-seeding
|
4.40 |
ACRE |
1,000.00 |
4,400.00 |
1,100.00 |
4,840.00 |
1,200.00 |
5,280.00 |
1,100.00 |
4,840.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
25,000.00 |
25,000.00 |
8,500.00 |
8,500.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
30,000.00 |
30,000.00 |
7,500.00 |
7,500.00 |
15,000.00 |
15,000.00 |
6,000.00 |
6,000.00 |
| S-001 |
cleaning existing ditches
|
1,100   |
LNFT |
10.00 |
11,000.00 |
10.00 |
11,000.00 |
5.00 |
5,500.00 |
9.00 |
9,900.00 |
| S-002 |
saw cutting driveways (6" deep)
|
50   |
LNFT |
10.00 |
500.00 |
8.50 |
425.00 |
20.00 |
1,000.00 |
25.00 |
1,250.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,361,106.99 |
|
1,381,199.96 |
|
1,385,501.90 |
|
1,389,763.86 |
|