| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 2 - BARRIERE CONSTRUCTION CO., LLC |
- 3 - COASTAL BRIDGE CO., L.L.C. |
- 4 - BARBER BROS. CONTRACTING CO., L.L.C |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
121   |
SQYD |
15.00 |
1,815.00 |
10.00 |
1,210.00 |
15.00 |
1,815.00 |
50.00 |
6,050.00 |
| 203-08 |
borrow (vehicular measurement)
|
500   |
CUYD |
15.00 |
7,500.00 |
20.00 |
10,000.00 |
1.00 |
500.00 |
30.00 |
15,000.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
2,759   |
CUYD |
10.00 |
27,590.00 |
5.00 |
13,795.00 |
1.00 |
2,759.00 |
20.00 |
55,180.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
59   |
EACH |
50.00 |
2,950.00 |
50.00 |
2,950.00 |
75.00 |
4,425.00 |
150.00 |
8,850.00 |
| 204-06 |
temporary silt fencing
|
2,081   |
LNFT |
1.60 |
3,329.60 |
1.00 |
2,081.00 |
1.75 |
3,641.75 |
1.50 |
3,121.50 |
| 304-01 |
lime
|
20.82 |
TON |
100.00 |
2,082.00 |
125.00 |
2,602.50 |
150.00 |
3,123.00 |
200.00 |
4,164.00 |
| 304-03-B |
lime treatment (type c) (8 1/2" thick)
|
594   |
SQYD |
5.00 |
2,970.00 |
3.00 |
1,782.00 |
2.00 |
1,188.00 |
5.00 |
2,970.00 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,188   |
SQYD |
7.00 |
8,316.00 |
3.00 |
3,564.00 |
2.00 |
2,376.00 |
10.00 |
11,880.00 |
| 308-01-A |
in-place cement treated base course (12" thick)
|
24,828   |
SQYD |
7.00 |
173,796.00 |
9.50 |
235,866.00 |
6.90 |
171,313.20 |
9.00 |
223,452.00 |
| 308-02 |
removal of existing patches
|
500   |
SQYD |
5.00 |
2,500.00 |
20.00 |
10,000.00 |
5.00 |
2,500.00 |
20.00 |
10,000.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,868   |
CUYD |
5.00 |
14,340.00 |
60.00 |
172,080.00 |
5.00 |
14,340.00 |
70.00 |
200,760.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
20.00 |
10,000.00 |
40.00 |
20,000.00 |
1.00 |
500.00 |
50.00 |
25,000.00 |
| 502-01 |
superpave asphaltic concrete
|
10,491.9 |
TON |
65.00 |
681,973.50 |
74.00 |
776,400.60 |
78.00 |
818,368.20 |
80.00 |
839,352.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,193.5 |
TON |
120.00 |
263,220.00 |
74.00 |
162,319.00 |
5.00 |
10,967.50 |
100.00 |
219,350.00 |
| 509-01-A |
cold planing asphaltic pavement (2" avg. depth)
|
24,640   |
SQYD |
1.00 |
24,640.00 |
2.50 |
61,600.00 |
2.00 |
49,280.00 |
2.50 |
61,600.00 |
| 509-01-B |
cold planing asphaltic pavement (2" deep)
|
21,589   |
SQYD |
1.50 |
32,383.50 |
2.50 |
53,972.50 |
1.80 |
38,860.20 |
2.50 |
53,972.50 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,927   |
CUYD |
0.01 |
- 19.27 |
10.00 |
- 19,270.00 |
0.01 |
- 19.27 |
0.00 |
0.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
80,000.00 |
80,000.00 |
130,000.00 |
130,000.00 |
40,000.00 |
40,000.00 |
| 713-03-E |
temporary pavement markings (24" width)
|
63   |
LNFT |
0.50 |
31.50 |
0.10 |
6.30 |
1.00 |
63.00 |
2.00 |
126.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.964 |
MILE |
500.00 |
2,982.00 |
55.00 |
328.02 |
400.00 |
2,385.60 |
450.00 |
2,683.80 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.964 |
MILE |
10.00 |
59.64 |
0.10 |
0.60 |
275.00 |
1,640.10 |
350.00 |
2,087.40 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
23.464 |
MILE |
10.00 |
234.64 |
0.10 |
2.35 |
425.00 |
9,972.20 |
500.00 |
11,732.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
10,000.00 |
10,000.00 |
500.00 |
500.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,860   |
SQYD |
85.00 |
243,100.00 |
45.00 |
128,700.00 |
76.00 |
217,360.00 |
75.00 |
214,500.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
190,000.00 |
190,000.00 |
200,000.00 |
200,000.00 |
60,000.00 |
60,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
10   |
EACH |
50.00 |
500.00 |
45.00 |
450.00 |
100.00 |
1,000.00 |
90.00 |
900.00 |
| 731-02 |
reflectorized raised pavement markers
|
522   |
EACH |
7.00 |
3,654.00 |
5.00 |
2,610.00 |
5.20 |
2,714.40 |
7.00 |
3,654.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
21   |
LNFT |
5.00 |
105.00 |
3.00 |
63.00 |
3.25 |
68.25 |
5.00 |
105.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.048 |
MILE |
3,000.00 |
27,144.00 |
2,500.00 |
22,620.00 |
2,510.00 |
22,710.48 |
2,850.00 |
25,786.80 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.988 |
MILE |
1,000.00 |
1,988.00 |
800.00 |
1,590.40 |
800.00 |
1,590.40 |
1,000.00 |
1,988.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
49,000.00 |
49,000.00 |
20,000.00 |
20,000.00 |
145,000.00 |
145,000.00 |
15,000.00 |
15,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
50,000.00 |
50,000.00 |
500.00 |
500.00 |
135,000.00 |
135,000.00 |
20,000.00 |
20,000.00 |
| S-001 |
saw cutting driveways (6" deep)
|
721   |
LNFT |
4.00 |
2,884.00 |
4.00 |
2,884.00 |
8.50 |
6,128.50 |
6.00 |
4,326.00 |
| S-002 |
saw cutting asphaltic concrete patches (12" deep)
|
9,100   |
LNFT |
8.00 |
72,800.00 |
2.00 |
18,200.00 |
5.00 |
45,500.00 |
5.00 |
45,500.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,923,869.11 |
|
1,979,407.27 |
|
2,057,070.51 |
|
2,194,091.00 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - HUEY STOCKSTILL, INC. |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
121   |
SQYD |
40.00 |
4,840.00 |
|
|
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
500   |
CUYD |
34.00 |
17,000.00 |
|
|
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
2,759   |
CUYD |
19.00 |
52,421.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
59   |
EACH |
100.00 |
5,900.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
2,081   |
LNFT |
1.60 |
3,329.60 |
|
|
|
|
|
|
| 304-01 |
lime
|
20.82 |
TON |
150.00 |
3,123.00 |
|
|
|
|
|
|
| 304-03-B |
lime treatment (type c) (8 1/2" thick)
|
594   |
SQYD |
3.00 |
1,782.00 |
|
|
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
1,188   |
SQYD |
3.00 |
3,564.00 |
|
|
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
24,828   |
SQYD |
9.00 |
223,452.00 |
|
|
|
|
|
|
| 308-02 |
removal of existing patches
|
500   |
SQYD |
20.00 |
10,000.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
2,868   |
CUYD |
55.00 |
157,740.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
500.0 |
CUYD |
55.00 |
27,500.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
10,491.9 |
TON |
75.00 |
786,892.50 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,193.5 |
TON |
120.00 |
263,220.00 |
|
|
|
|
|
|
| 509-01-A |
cold planing asphaltic pavement (2" avg. depth)
|
24,640   |
SQYD |
3.00 |
73,920.00 |
|
|
|
|
|
|
| 509-01-B |
cold planing asphaltic pavement (2" deep)
|
21,589   |
SQYD |
3.00 |
64,767.00 |
|
|
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 1,927   |
CUYD |
1.00 |
- 1,927.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
60,000.00 |
60,000.00 |
|
|
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
63   |
LNFT |
1.00 |
63.00 |
|
|
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
5.964 |
MILE |
400.00 |
2,385.60 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.964 |
MILE |
400.00 |
2,385.60 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
23.464 |
MILE |
650.00 |
15,251.60 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
8,000.00 |
8,000.00 |
|
|
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,860   |
SQYD |
80.00 |
228,800.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
220,000.00 |
220,000.00 |
|
|
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
10   |
EACH |
60.00 |
600.00 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
522   |
EACH |
5.50 |
2,871.00 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
21   |
LNFT |
3.00 |
63.00 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.048 |
MILE |
2,500.00 |
22,620.00 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.988 |
MILE |
1,000.00 |
1,988.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
18,000.00 |
18,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| S-001 |
saw cutting driveways (6" deep)
|
721   |
LNFT |
15.00 |
10,815.00 |
|
|
|
|
|
|
| S-002 |
saw cutting asphaltic concrete patches (12" deep)
|
9,100   |
LNFT |
8.00 |
72,800.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,389,166.90 |
|
|
|
|
|
|
|