Letting of 4/25/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 804-05-0010
Parish: ASSUMPTION
Routes: LA 1016-1
Description: LA 70 - 2.100 MILES EAST OF LA 70 & LA 70-END OF CONTROL
Type Const: grading, cold planing asphaltic concrete, lime treatment, pavement patching, superpave
asphaltic concrete overlay and related work.
Estimated Construction Cost: $1,860,191.64
 
RankLicenseBidderConstruction Bid
1 00849 F.G. SULLIVAN, JR. CONTRACTOR LLC $1,923,869.11
2 06276 BARRIERE CONSTRUCTION CO., LLC $1,979,407.27
3 00481 COASTAL BRIDGE CO., L.L.C. $2,057,070.51
4 00046 BARBER BROS. CONTRACTING CO., L.L.C $2,194,091.00
5 06487 HUEY STOCKSTILL, INC. $2,389,166.90
 
Item Number Item Description Quantity Unit of Measure - 1 -
F.G. SULLIVAN, JR. CONTRACTOR LLC
- 2 -
BARRIERE CONSTRUCTION CO., LLC
- 3 -
COASTAL BRIDGE CO., L.L.C.
- 4 -
BARBER BROS. CONTRACTING CO., L.L.C
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 121      SQYD 15.00 1,815.00 10.00 1,210.00 15.00 1,815.00 50.00 6,050.00
203-08 borrow (vehicular measurement) 500      CUYD 15.00 7,500.00 20.00 10,000.00 1.00 500.00 30.00 15,000.00
203-08-A borrow (vehicular meas.)(selected soils) 2,759      CUYD 10.00 27,590.00 5.00 13,795.00 1.00 2,759.00 20.00 55,180.00
204-05-A temporary sediment check dams (hay) 59      EACH 50.00 2,950.00 50.00 2,950.00 75.00 4,425.00 150.00 8,850.00
204-06 temporary silt fencing 2,081      LNFT 1.60 3,329.60 1.00 2,081.00 1.75 3,641.75 1.50 3,121.50
304-01 lime 20.82   TON 100.00 2,082.00 125.00 2,602.50 150.00 3,123.00 200.00 4,164.00
304-03-B lime treatment (type c) (8 1/2" thick) 594      SQYD 5.00 2,970.00 3.00 1,782.00 2.00 1,188.00 5.00 2,970.00
304-04-D lime treatment (type d) (12" thick) 1,188      SQYD 7.00 8,316.00 3.00 3,564.00 2.00 2,376.00 10.00 11,880.00
308-01-A in-place cement treated base course (12" thick) 24,828      SQYD 7.00 173,796.00 9.50 235,866.00 6.90 171,313.20 9.00 223,452.00
308-02 removal of existing patches 500      SQYD 5.00 2,500.00 20.00 10,000.00 5.00 2,500.00 20.00 10,000.00
401-02 aggregate surface course (adjusted vehicular
measurement)
2,868      CUYD 5.00 14,340.00 60.00 172,080.00 5.00 14,340.00 70.00 200,760.00
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 20.00 10,000.00 40.00 20,000.00 1.00 500.00 50.00 25,000.00
502-01 superpave asphaltic concrete 10,491.9    TON 65.00 681,973.50 74.00 776,400.60 78.00 818,368.20 80.00 839,352.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,193.5    TON 120.00 263,220.00 74.00 162,319.00 5.00 10,967.50 100.00 219,350.00
509-01-A cold planing asphaltic pavement (2" avg. depth) 24,640      SQYD 1.00 24,640.00 2.50 61,600.00 2.00 49,280.00 2.50 61,600.00
509-01-B cold planing asphaltic pavement (2" deep) 21,589      SQYD 1.50 32,383.50 2.50 53,972.50 1.80 38,860.20 2.50 53,972.50
509-02 contractor retained reclaimed asphaltic pavement - 1,927      CUYD 0.01 - 19.27 10.00 - 19,270.00 0.01 - 19.27 0.00 0.00
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 80,000.00 80,000.00 130,000.00 130,000.00 40,000.00 40,000.00
713-03-E temporary pavement markings (24" width) 63      LNFT 0.50 31.50 0.10 6.30 1.00 63.00 2.00 126.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
5.964  MILE 500.00 2,982.00 55.00 328.02 400.00 2,385.60 450.00 2,683.80
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
5.964  MILE 10.00 59.64 0.10 0.60 275.00 1,640.10 350.00 2,087.40
713-05-A temporary pavement markings (solid line)(4" width) 23.464  MILE 10.00 234.64 0.10 2.35 425.00 9,972.20 500.00 11,732.00
722-02 project site laboratory (equipped) 1      EACH 10,000.00 10,000.00 500.00 500.00 10,000.00 10,000.00 5,000.00 5,000.00
724-01-B pavement patching (12" minimum thickness) 2,860      SQYD 85.00 243,100.00 45.00 128,700.00 76.00 217,360.00 75.00 214,500.00
727-01 mobilization lump      LUMP 100,000.00 100,000.00 190,000.00 190,000.00 200,000.00 200,000.00 60,000.00 60,000.00
729-16-B object marker assembly (type 2) 10      EACH 50.00 500.00 45.00 450.00 100.00 1,000.00 90.00 900.00
731-02 reflectorized raised pavement markers 522      EACH 7.00 3,654.00 5.00 2,610.00 5.20 2,714.40 7.00 3,654.00
732-01-E plastic pavement striping (24" width) 21      LNFT 5.00 105.00 3.00 63.00 3.25 68.25 5.00 105.00
732-02-A plastic pavement striping (solid line) (4" width) 9.048  MILE 3,000.00 27,144.00 2,500.00 22,620.00 2,510.00 22,710.48 2,850.00 25,786.80
732-03-A plastic pavement striping (broken line)(4" width) 1.988  MILE 1,000.00 1,988.00 800.00 1,590.40 800.00 1,590.40 1,000.00 1,988.00
740-01 construction layout lump      LUMP 49,000.00 49,000.00 20,000.00 20,000.00 145,000.00 145,000.00 15,000.00 15,000.00
744-01 traffic control management lump      LUMP 50,000.00 50,000.00 500.00 500.00 135,000.00 135,000.00 20,000.00 20,000.00
S-001 saw cutting driveways (6" deep) 721      LNFT 4.00 2,884.00 4.00 2,884.00 8.50 6,128.50 6.00 4,326.00
S-002 saw cutting asphaltic concrete patches (12" deep) 9,100      LNFT 8.00 72,800.00 2.00 18,200.00 5.00 45,500.00 5.00 45,500.00
                       
 CONTRACTOR TOTAL       1,923,869.11   1,979,407.27   2,057,070.51   2,194,091.00
 
Item Number Item Description Quantity Unit of Measure - 5 -
HUEY STOCKSTILL, INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 121      SQYD 40.00 4,840.00            
203-08 borrow (vehicular measurement) 500      CUYD 34.00 17,000.00            
203-08-A borrow (vehicular meas.)(selected soils) 2,759      CUYD 19.00 52,421.00            
204-05-A temporary sediment check dams (hay) 59      EACH 100.00 5,900.00            
204-06 temporary silt fencing 2,081      LNFT 1.60 3,329.60            
304-01 lime 20.82   TON 150.00 3,123.00            
304-03-B lime treatment (type c) (8 1/2" thick) 594      SQYD 3.00 1,782.00            
304-04-D lime treatment (type d) (12" thick) 1,188      SQYD 3.00 3,564.00            
308-01-A in-place cement treated base course (12" thick) 24,828      SQYD 9.00 223,452.00            
308-02 removal of existing patches 500      SQYD 20.00 10,000.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
2,868      CUYD 55.00 157,740.00            
402-01 traffic maintenance aggregate (vehicular measurement) 500.0    CUYD 55.00 27,500.00            
502-01 superpave asphaltic concrete 10,491.9    TON 75.00 786,892.50            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
2,193.5    TON 120.00 263,220.00            
509-01-A cold planing asphaltic pavement (2" avg. depth) 24,640      SQYD 3.00 73,920.00            
509-01-B cold planing asphaltic pavement (2" deep) 21,589      SQYD 3.00 64,767.00            
509-02 contractor retained reclaimed asphaltic pavement - 1,927      CUYD 1.00 - 1,927.00            
713-01 temporary signs & barricades lump      LUMP 60,000.00 60,000.00            
713-03-E temporary pavement markings (24" width) 63      LNFT 1.00 63.00            
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
5.964  MILE 400.00 2,385.60            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
5.964  MILE 400.00 2,385.60            
713-05-A temporary pavement markings (solid line)(4" width) 23.464  MILE 650.00 15,251.60            
722-02 project site laboratory (equipped) 1      EACH 8,000.00 8,000.00            
724-01-B pavement patching (12" minimum thickness) 2,860      SQYD 80.00 228,800.00            
727-01 mobilization lump      LUMP 220,000.00 220,000.00            
729-16-B object marker assembly (type 2) 10      EACH 60.00 600.00            
731-02 reflectorized raised pavement markers 522      EACH 5.50 2,871.00            
732-01-E plastic pavement striping (24" width) 21      LNFT 3.00 63.00            
732-02-A plastic pavement striping (solid line) (4" width) 9.048  MILE 2,500.00 22,620.00            
732-03-A plastic pavement striping (broken line)(4" width) 1.988  MILE 1,000.00 1,988.00            
740-01 construction layout lump      LUMP 18,000.00 18,000.00            
744-01 traffic control management lump      LUMP 25,000.00 25,000.00            
S-001 saw cutting driveways (6" deep) 721      LNFT 15.00 10,815.00            
S-002 saw cutting asphaltic concrete patches (12" deep) 9,100      LNFT 8.00 72,800.00            
                       
 CONTRACTOR TOTAL       2,389,166.90            