Lead Project: 744-05-0014
Parish: AVOYELLES
Routes:
Description: COTTONPORT SIDEWALK IMPROVEMENTS - PHASE I
Type Const: grading, portland cement concrete sidewalks and related work.
Estimated Construction Cost: $236,208.50
 
RankLicenseBidderConstruction Bid
1 21982 FORBY CONTRACTING, INC. $248,525.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
FORBY CONTRACTING, INC.

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 2,156      SQYD 11.00 23,716.00            
202-02-E removal of concrete curbs 100.0    LNFT 9.00 900.00            
203-08 borrow (vehicular measurement) 200      CUYD 27.50 5,500.00            
701-01-F cross drain pipe (15" rcp) 16      LNFT 83.00 1,328.00            
701-01-G cross drain pipe (18" rcp) 16      LNFT 89.00 1,424.00            
701-01-I cross drain pipe (24" rcp) 16      LNFT 92.00 1,472.00            
701-07-B yard drain pipe (6" pvc-outfall) 104      LNFT 25.00 2,600.00            
701-07-C yard drain pipe (8" pvc-outfall) 8      LNFT 30.00 240.00            
701-07-D yard drain pipe (10" pvc-outfall) 8      LNFT 35.00 280.00            
701-07-E yard drain pipe (12" pvc-outfall) 16      LNFT 40.00 640.00            
706-01-A concrete walk (4" thick) 1,530.0    SQYD 49.00 74,970.00            
706-01-C concrete walk (6" thick) 635.0    SQYD 63.00 40,005.00            
707-01 concrete curb 60.0    LNFT 18.00 1,080.00            
713-01 temporary signs & barricades lump      LUMP 12,500.00 12,500.00            
715-01 topsoil 200      CUYD 30.00 6,000.00            
717-01 seeding 25      LB 20.00 500.00            
718-01 fertilizer 600      LB 5.00 3,000.00            
719-01-A plants (lagerstroemia indica,'watermelon
red',watermelon red crape myrtle, 30 gal.,3"
caliper,10-12'ht.)
8      EACH 600.00 4,800.00            
727-01 mobilization lump      LUMP 24,500.00 24,500.00            
740-01 construction layout lump      LUMP 1,500.00 1,500.00            
S-001 tree well planters 8      EACH 1,000.00 8,000.00            
S-002 concrete walk (red tint)(brick stamp) 437      SQYD 45.00 19,665.00            
S-003 truncated domes for handicap ramps 6      SQYD 250.00 1,500.00            
S-004 sawcutting of existing hard surface 1,654      LNFT 7.50 12,405.00            
                       
 CONTRACTOR TOTAL       248,525.00            