| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - M.R. PITTMAN GROUP, LLC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing and grubbing
|
lump |
lump |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
lump |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 202-02-A-01 |
removal of bridge (sta. 1+150.000 36.7m x 12.0m 3 span
conc./steel) |
1   |
ea |
90,000.00 |
90,000.00 |
270,000.00 |
270,000.00 |
|
|
|
|
| 202-02-A-02 |
removal of bridge (sta. 1+150.000 36.7m x 12.0m 3 span
conc./steel) |
1   |
ea |
90,000.00 |
90,000.00 |
270,000.00 |
270,000.00 |
|
|
|
|
| 202-02-C-01 |
removal of portland cement concrete pavement and
asphalt concrete surfacing |
2,681   |
sq m |
10.00 |
26,810.00 |
10.00 |
26,810.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
46   |
sq m |
10.00 |
460.00 |
35.00 |
1,610.00 |
|
|
|
|
| 202-02-E |
removal of concrete curbs
|
69.0 |
ln m |
10.00 |
690.00 |
20.00 |
1,380.00 |
|
|
|
|
| 202-02-F |
removal of concrete combination curb & gutter
|
571.1 |
ln m |
12.00 |
6,853.20 |
17.00 |
9,708.70 |
|
|
|
|
| 203-05-A |
nonplastic embankment (vehicular measurement)
|
1,035   |
cu m |
18.00 |
18,630.00 |
30.00 |
31,050.00 |
|
|
|
|
| 203-06 |
excavation & embankment
|
lump |
lump |
70,000.00 |
70,000.00 |
75,000.00 |
75,000.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
16   |
ea |
20.00 |
320.00 |
25.00 |
400.00 |
|
|
|
|
| 204-03 |
temporary slope drains
|
40   |
ln m |
40.00 |
1,600.00 |
50.00 |
2,000.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
ea |
350.00 |
1,400.00 |
500.00 |
2,000.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
120   |
ln m |
10.00 |
1,200.00 |
20.00 |
2,400.00 |
|
|
|
|
| 302-01-A |
class ii base course (stone or recycled portland
cement concrete) |
636.3 |
cu m |
90.00 |
57,267.00 |
112.00 |
71,265.60 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
1,070.9 |
Mg |
130.00 |
139,217.00 |
115.00 |
123,153.50 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete,drives,turnouts and
miscellaneous |
50.0 |
Mg |
130.00 |
6,500.00 |
155.00 |
7,750.00 |
|
|
|
|
| 702-03-I |
catch basins (n.o. s. & w.board-curb inlet)
|
1   |
ea |
4,500.00 |
4,500.00 |
7,800.00 |
7,800.00 |
|
|
|
|
| 702-04-A |
adjusting manholes
|
3   |
ea |
1,700.00 |
5,100.00 |
800.00 |
2,400.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
2   |
ea |
2,000.00 |
4,000.00 |
1,100.00 |
2,200.00 |
|
|
|
|
| 706-01-A-01 |
concrete walk (100 mm thick)(reinforced)
|
432.0 |
sq m |
70.00 |
30,240.00 |
80.00 |
34,560.00 |
|
|
|
|
| 706-02-C |
concrete drive (150 mm thick)
|
87.4 |
sq m |
100.00 |
8,740.00 |
70.00 |
6,118.00 |
|
|
|
|
| 707-01 |
concrete curb
|
19.6 |
ln m |
60.00 |
1,176.00 |
100.00 |
1,960.00 |
|
|
|
|
| 707-03-A |
combination concrete curb & gutter (drain from curb)
|
278.3 |
ln m |
100.00 |
27,830.00 |
110.00 |
30,613.00 |
|
|
|
|
| 707-03-B |
combination concrete curb & gutter(drain to curb)
|
251.9 |
ln m |
100.00 |
25,190.00 |
110.00 |
27,709.00 |
|
|
|
|
| 712-04 |
flexible revetment
|
1,080   |
sq m |
100.00 |
108,000.00 |
40.00 |
43,200.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
lump |
60,000.00 |
60,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| 713-03-A |
temporary pavement markings (100 mm width)
|
300   |
ln m |
1.50 |
450.00 |
4.45 |
1,335.00 |
|
|
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(100 mm width)
(type 1 removable) |
1.700 |
km |
12,000.00 |
20,400.00 |
11,640.00 |
19,788.00 |
|
|
|
|
| 714-01 |
slab sodding
|
108   |
sq m |
10.00 |
1,080.00 |
8.00 |
864.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.4 |
hctr |
2,500.00 |
1,000.00 |
4,000.00 |
1,600.00 |
|
|
|
|
| 717-01 |
seeding
|
14   |
kg |
20.00 |
280.00 |
52.50 |
735.00 |
|
|
|
|
| 718-01 |
fertilizer
|
454   |
kg |
1.00 |
454.00 |
2.00 |
908.00 |
|
|
|
|
| 719-01-A |
plants (eastern red cedar, 3" caliper, 2" dbh, 12'
height) |
12   |
ea |
400.00 |
4,800.00 |
1,300.00 |
15,600.00 |
|
|
|
|
| 719-01-B |
plants (southern magnolia, 3" caliper, 2" dbh, 12'
height) |
3   |
ea |
400.00 |
1,200.00 |
1,600.00 |
4,800.00 |
|
|
|
|
| 725-02 |
temporary detour roads
|
459.4 |
sq m |
150.00 |
68,910.00 |
200.00 |
91,880.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
lump |
380,000.00 |
380,000.00 |
440,000.00 |
440,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
4   |
ea |
100.00 |
400.00 |
70.00 |
280.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
lump |
150,000.00 |
150,000.00 |
130,000.00 |
130,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
lump |
90,000.00 |
90,000.00 |
100,000.00 |
100,000.00 |
|
|
|
|
| 804-01-C |
precast concrete piles (400 mm)
|
1,785.0 |
ln m |
168.00 |
299,880.00 |
250.00 |
446,250.00 |
|
|
|
|
| 804-05-C |
precast concrete test piles(400mm)
|
1   |
ea |
18,500.00 |
18,500.00 |
135,000.00 |
135,000.00 |
|
|
|
|
| 804-09 |
loading test piles
|
1   |
ea |
5,900.00 |
5,900.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 804-10 |
reloading test piles
|
1   |
ea |
750.00 |
750.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 804-11 |
redriving test piles
|
1   |
ea |
1,000.00 |
1,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
ea |
5,000.00 |
10,000.00 |
5,000.00 |
10,000.00 |
|
|
|
|
| 805-01-C |
class a concrete (retaining walls)
|
8.42 |
cu m |
3,000.00 |
25,260.00 |
1,500.00 |
12,630.00 |
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
84.30 |
cu m |
3,600.00 |
303,480.00 |
2,100.00 |
177,030.00 |
|
|
|
|
| 805-03 |
class aa concrete
|
366.10 |
cu m |
1,350.00 |
494,235.00 |
1,990.00 |
728,539.00 |
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
50,462   |
kg |
2.50 |
126,155.00 |
2.00 |
100,924.00 |
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
84.00 |
ln m |
450.00 |
37,800.00 |
450.00 |
37,800.00 |
|
|
|
|
| 810-05 |
pipe & concrete railing
|
84.00 |
ln m |
1,300.00 |
109,200.00 |
800.00 |
67,200.00 |
|
|
|
|
| 813-01-A |
concrete approach slabs (w/tapered barrier rails &
sidewalk) |
289.68 |
sq m |
445.00 |
128,907.60 |
250.00 |
72,420.00 |
|
|
|
|
| S-002 |
flashing arrow panel
|
4   |
ea |
10,000.00 |
40,000.00 |
10,000.00 |
40,000.00 |
|
|
|
|
| S-005 |
vibration monitoring
|
lump |
lump |
30,000.00 |
30,000.00 |
60,000.00 |
60,000.00 |
|
|
|
|
| S-007 |
geotextile fabric
|
6,088   |
sq m |
2.00 |
12,176.00 |
2.00 |
12,176.00 |
|
|
|
|
| S-010 |
water main(12"(305mm)d.i. class 56)
|
210   |
ln m |
765.00 |
160,650.00 |
630.00 |
132,300.00 |
|
|
|
|
| S-011 |
gate valve with/manhole(12")(305mm)
|
4   |
each |
17,000.00 |
68,000.00 |
22,700.00 |
90,800.00 |
|
|
|
|
| S-012 |
pot holing
|
10   |
each |
1,000.00 |
10,000.00 |
700.00 |
7,000.00 |
|
|
|
|
| S-013 |
sewer force main (12"(305mm)d.i. class 56)
|
270   |
ln m |
1,085.00 |
292,950.00 |
826.00 |
223,020.00 |
|
|
|
|
| S-014 |
gate valve with/manhole(12")(305mm)
|
5   |
each |
19,000.00 |
95,000.00 |
23,600.00 |
118,000.00 |
|
|
|
|
| S-015 |
air release valve(2")(50mm)
|
2   |
each |
4,000.00 |
8,000.00 |
3,400.00 |
6,800.00 |
|
|
|
|
| S-020 |
geogrid
|
2,884   |
sq m |
6.00 |
17,304.00 |
6.00 |
17,304.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,819,844.80 |
|
4,472,070.80 |
|
|
|
|
|