Letting of 4/25/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 694-13-0011
Parish: CADDO
Routes: I-20
Description: GREENWOOD WEIGH STATION
Type Const: roadway lighting and related work.
Estimated Construction Cost: $441,713.50
 
RankLicenseBidderConstruction Bid
1 13082 WYE ELECTRIC, INC. $470,041.50
2 08470 DIAMOND ELECTRICAL CO., INC. $613,246.33
3 01165 ERNEST P. BREAUX ELECTRICAL, INC. $737,175.00
 
Item Number Item Description Quantity Unit of Measure - 1 -
WYE ELECTRIC, INC.
- 2 -
DIAMOND ELECTRICAL CO., INC.
- 3 -
ERNEST P. BREAUX ELECTRICAL, INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 2,000.00 2,000.00 9,700.00 9,700.00 85,000.00 85,000.00    
203-06 excavation & embankment lump      LUMP 3,000.00 3,000.00 8,300.00 8,300.00 46,000.00 46,000.00    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
218.3    TON 225.00 49,117.50 242.00 52,828.60 245.00 53,483.50    
704-01-C guard rail (double thrie beam)(3'-1 1/2" post spacing) 262.5    LNFT 50.00 13,125.00 60.50 15,881.25 55.00 14,437.50    
704-03 blocked out guard rail 487.5    LNFT 20.00 9,750.00 23.00 11,212.50 21.00 10,237.50    
704-06-A guard rail anchor sections (trailing end)(single thrie
beam)
6.3    LNFT 100.00 630.00 90.75 571.73 105.00 661.50    
704-11-A guard rail end treatment (flared) 2      EACH 2,500.00 5,000.00 3,025.00 6,050.00 3,100.00 6,200.00    
713-01 temporary signs & barricades lump      LUMP 10,000.00 10,000.00 7,600.00 7,600.00 27,500.00 27,500.00    
727-01 mobilization lump      LUMP 5,000.00 5,000.00 63,000.00 63,000.00 21,900.00 21,900.00    
730-01 trenching and backfilling 2,625      LNFT 3.00 7,875.00 2.75 7,218.75 5.00 13,125.00    
730-02-A conduit with conductors (2" schedule 40 pvc; 3#1/0) 80      LNFT 27.50 2,200.00 14.00 1,120.00 13.00 1,040.00    
730-02-B conduit with conductors (2" rigid galvanized steel;
3#1/0)
20      LNFT 44.25 885.00 104.00 2,080.00 19.00 380.00    
730-02-C conduit with conductors (2" rigid galvanized steel;
3#1/0, 1#6 green ground)
25      LNFT 50.50 1,262.50 71.50 1,787.50 20.00 500.00    
730-02-D conduit with conductors (2" schedule 40 pvc; 3#1/0,
1#6 green ground)
80      LNFT 28.25 2,260.00 12.85 1,028.00 14.00 1,120.00    
730-02-E conduit with conductors (2" rigid galvanized steel;
3#2)
10      LNFT 57.00 570.00 116.00 1,160.00 16.00 160.00    
730-02-F conduit with conductors (2" schedule 40 pvc; 3#2) 80      LNFT 22.55 1,804.00 9.60 768.00 10.00 800.00    
730-02-G conduit with conductors (1 1/2" schedule 40 pvc; 2#4,
2#8, 1#4 bare ground)
475      LNFT 12.00 5,700.00 9.92 4,712.00 9.00 4,275.00    
730-02-H conduit with conductors (1 1/2" schedule 40 pvc; 2#8,
1#4 bare ground)
30      LNFT 27.25 817.50 8.60 258.00 5.00 150.00    
730-02-I conduit with conductors (1 1/2" schedule 40 pvc; 2#4,
1#4 bare ground)
2,100      LNFT 10.25 21,525.00 6.90 14,490.00 7.00 14,700.00    
730-02-J conduit with conductors (1 1/2" rigid galvanized steel;
2#4, 1#4 green ground)
30      LNFT 22.50 675.00 77.55 2,326.50 12.00 360.00    
730-02-K conduit with conductors (1 1/2" rigid aluminum; 2#4,
1#4 green ground)
220      LNFT 74.00 16,280.00 35.20 7,744.00 42.00 9,240.00    
730-04 jacked or bored casing (6" diameter schedule 80 pvc) 135      LNFT 40.00 5,400.00 47.50 6,412.50 33.00 4,455.00    
730-06-A high mast pole (130 foot, steel, 8 luminaire ring,
internal lowering device)
4      EACH 53,500.00 214,000.00 64,000.00 256,000.00 76,000.00 304,000.00    
730-07-A luminaire (1000 watt hps, type ii, medium, long &
narrow, non-cutoff distribution, with lamp)
32      EACH 950.00 30,400.00 886.00 28,352.00 850.00 27,200.00    
730-08 electrical service point (pedestal) 2      EACH 11,400.00 22,800.00 17,350.00 34,700.00 19,000.00 38,000.00    
730-12-A removal and storage of light poles (40 foot, ground
mount, 1-6 foot truss arm, steel)
43      EACH 400.00 17,200.00 155.00 6,665.00 240.00 10,320.00    
730-14-A removal and disposal of luminaires (250 watt hps) 43      EACH 85.00 3,655.00 54.00 2,322.00 90.00 3,870.00    
730-16-A underground junction box (11"x18") 4      EACH 625.00 2,500.00 1,030.00 4,120.00 1,300.00 5,200.00    
730-16-B underground junction box (13"x24") 8      EACH 630.00 5,040.00 985.00 7,880.00 1,350.00 10,800.00    
730-17-A structure junction box (8"x8"x4") 2      EACH 650.00 1,300.00 670.00 1,340.00 900.00 1,800.00    
740-01 construction layout lump      LUMP 3,000.00 3,000.00 2,300.00 2,300.00 6,500.00 6,500.00    
744-01 traffic control management lump      LUMP 3,000.00 3,000.00 41,000.00 41,000.00 10,000.00 10,000.00    
S-001 underground duct marker (concrete) 4      EACH 50.00 200.00 200.00 800.00 250.00 1,000.00    
S-002 marker tape (underground) 2,760      LNFT 0.75 2,070.00 0.55 1,518.00 1.00 2,760.00    
                       
 CONTRACTOR TOTAL       470,041.50   613,246.33   737,175.00    