| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - WYE ELECTRIC, INC. |
- 2 - DIAMOND ELECTRICAL CO., INC. |
- 3 - ERNEST P. BREAUX ELECTRICAL, INC. |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
2,000.00 |
2,000.00 |
9,700.00 |
9,700.00 |
85,000.00 |
85,000.00 |
|
|
| 203-06 |
excavation & embankment
|
lump |
LUMP |
3,000.00 |
3,000.00 |
8,300.00 |
8,300.00 |
46,000.00 |
46,000.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
218.3 |
TON |
225.00 |
49,117.50 |
242.00 |
52,828.60 |
245.00 |
53,483.50 |
|
|
| 704-01-C |
guard rail (double thrie beam)(3'-1 1/2" post spacing)
|
262.5 |
LNFT |
50.00 |
13,125.00 |
60.50 |
15,881.25 |
55.00 |
14,437.50 |
|
|
| 704-03 |
blocked out guard rail
|
487.5 |
LNFT |
20.00 |
9,750.00 |
23.00 |
11,212.50 |
21.00 |
10,237.50 |
|
|
| 704-06-A |
guard rail anchor sections (trailing end)(single thrie
beam) |
6.3 |
LNFT |
100.00 |
630.00 |
90.75 |
571.73 |
105.00 |
661.50 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
2   |
EACH |
2,500.00 |
5,000.00 |
3,025.00 |
6,050.00 |
3,100.00 |
6,200.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
10,000.00 |
10,000.00 |
7,600.00 |
7,600.00 |
27,500.00 |
27,500.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
5,000.00 |
5,000.00 |
63,000.00 |
63,000.00 |
21,900.00 |
21,900.00 |
|
|
| 730-01 |
trenching and backfilling
|
2,625   |
LNFT |
3.00 |
7,875.00 |
2.75 |
7,218.75 |
5.00 |
13,125.00 |
|
|
| 730-02-A |
conduit with conductors (2" schedule 40 pvc; 3#1/0)
|
80   |
LNFT |
27.50 |
2,200.00 |
14.00 |
1,120.00 |
13.00 |
1,040.00 |
|
|
| 730-02-B |
conduit with conductors (2" rigid galvanized steel;
3#1/0) |
20   |
LNFT |
44.25 |
885.00 |
104.00 |
2,080.00 |
19.00 |
380.00 |
|
|
| 730-02-C |
conduit with conductors (2" rigid galvanized steel;
3#1/0, 1#6 green ground) |
25   |
LNFT |
50.50 |
1,262.50 |
71.50 |
1,787.50 |
20.00 |
500.00 |
|
|
| 730-02-D |
conduit with conductors (2" schedule 40 pvc; 3#1/0,
1#6 green ground) |
80   |
LNFT |
28.25 |
2,260.00 |
12.85 |
1,028.00 |
14.00 |
1,120.00 |
|
|
| 730-02-E |
conduit with conductors (2" rigid galvanized steel;
3#2) |
10   |
LNFT |
57.00 |
570.00 |
116.00 |
1,160.00 |
16.00 |
160.00 |
|
|
| 730-02-F |
conduit with conductors (2" schedule 40 pvc; 3#2)
|
80   |
LNFT |
22.55 |
1,804.00 |
9.60 |
768.00 |
10.00 |
800.00 |
|
|
| 730-02-G |
conduit with conductors (1 1/2" schedule 40 pvc; 2#4,
2#8, 1#4 bare ground) |
475   |
LNFT |
12.00 |
5,700.00 |
9.92 |
4,712.00 |
9.00 |
4,275.00 |
|
|
| 730-02-H |
conduit with conductors (1 1/2" schedule 40 pvc; 2#8,
1#4 bare ground) |
30   |
LNFT |
27.25 |
817.50 |
8.60 |
258.00 |
5.00 |
150.00 |
|
|
| 730-02-I |
conduit with conductors (1 1/2" schedule 40 pvc; 2#4,
1#4 bare ground) |
2,100   |
LNFT |
10.25 |
21,525.00 |
6.90 |
14,490.00 |
7.00 |
14,700.00 |
|
|
| 730-02-J |
conduit with conductors (1 1/2" rigid galvanized steel;
2#4, 1#4 green ground) |
30   |
LNFT |
22.50 |
675.00 |
77.55 |
2,326.50 |
12.00 |
360.00 |
|
|
| 730-02-K |
conduit with conductors (1 1/2" rigid aluminum; 2#4,
1#4 green ground) |
220   |
LNFT |
74.00 |
16,280.00 |
35.20 |
7,744.00 |
42.00 |
9,240.00 |
|
|
| 730-04 |
jacked or bored casing (6" diameter schedule 80 pvc)
|
135   |
LNFT |
40.00 |
5,400.00 |
47.50 |
6,412.50 |
33.00 |
4,455.00 |
|
|
| 730-06-A |
high mast pole (130 foot, steel, 8 luminaire ring,
internal lowering device) |
4   |
EACH |
53,500.00 |
214,000.00 |
64,000.00 |
256,000.00 |
76,000.00 |
304,000.00 |
|
|
| 730-07-A |
luminaire (1000 watt hps, type ii, medium, long &
narrow, non-cutoff distribution, with lamp) |
32   |
EACH |
950.00 |
30,400.00 |
886.00 |
28,352.00 |
850.00 |
27,200.00 |
|
|
| 730-08 |
electrical service point (pedestal)
|
2   |
EACH |
11,400.00 |
22,800.00 |
17,350.00 |
34,700.00 |
19,000.00 |
38,000.00 |
|
|
| 730-12-A |
removal and storage of light poles (40 foot, ground
mount, 1-6 foot truss arm, steel) |
43   |
EACH |
400.00 |
17,200.00 |
155.00 |
6,665.00 |
240.00 |
10,320.00 |
|
|
| 730-14-A |
removal and disposal of luminaires (250 watt hps)
|
43   |
EACH |
85.00 |
3,655.00 |
54.00 |
2,322.00 |
90.00 |
3,870.00 |
|
|
| 730-16-A |
underground junction box (11"x18")
|
4   |
EACH |
625.00 |
2,500.00 |
1,030.00 |
4,120.00 |
1,300.00 |
5,200.00 |
|
|
| 730-16-B |
underground junction box (13"x24")
|
8   |
EACH |
630.00 |
5,040.00 |
985.00 |
7,880.00 |
1,350.00 |
10,800.00 |
|
|
| 730-17-A |
structure junction box (8"x8"x4")
|
2   |
EACH |
650.00 |
1,300.00 |
670.00 |
1,340.00 |
900.00 |
1,800.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
2,300.00 |
2,300.00 |
6,500.00 |
6,500.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
3,000.00 |
3,000.00 |
41,000.00 |
41,000.00 |
10,000.00 |
10,000.00 |
|
|
| S-001 |
underground duct marker (concrete)
|
4   |
EACH |
50.00 |
200.00 |
200.00 |
800.00 |
250.00 |
1,000.00 |
|
|
| S-002 |
marker tape (underground)
|
2,760   |
LNFT |
0.75 |
2,070.00 |
0.55 |
1,518.00 |
1.00 |
2,760.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
470,041.50 |
|
613,246.33 |
|
737,175.00 |
|
|
|