February 06, 2014 Error processing SSI file

Letting of 4/25/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 263-01-0013
Parish: ST HELENA
Routes: LA 38
Description: JCT. LA 10 - JCT. LA 43
Type Const: cold planning asphaltic concrete, superpave asphaltic concrete overlay and related
work.
Estimated Construction Cost: $1,548,097.67
 
RankLicenseBidderConstruction Bid
1 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $1,228,894.63
2 00046 BARBER BROS. CONTRACTING CO., L.L.C $1,553,023.80
3 06276 BARRIERE CONSTRUCTION CO., LLC. $1,792,807.82
 
Item Number Item Description Quantity Unit of Measure - 1 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 2 -
BARBER BROS. CONTRACTING CO., L.L.C
- 3 -
BARRIERE CONSTRUCTION CO., LLC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-I removal of reflectorized raised pavement markers 1,256      EACH 1.00 1,256.00 3.50 4,396.00 1.00 1,256.00    
202-02-J removal of asphaltic concrete islands 30.0    SQYD 100.00 3,000.00 100.00 3,000.00 30.00 900.00    
203-08 borrow (vehicular measurement) 100      CUYD 25.00 2,500.00 40.00 4,000.00 30.00 3,000.00    
204-05-A temporary sediment check dams (hay) 4      EACH 300.00 1,200.00 300.00 1,200.00 170.00 680.00    
204-06 temporary silt fencing 1,000      LNFT 1.80 1,800.00 1.50 1,500.00 1.80 1,800.00    
401-02 aggregate surface course (adjusted vehicular
measurement)
200      CUYD 37.75 7,550.00 100.00 20,000.00 92.00 18,400.00    
502-01 superpave asphaltic concrete 11,046.8    TON 62.00 684,901.60 80.00 883,744.00 76.00 839,556.80    
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
1,123.0    TON 125.00 140,375.00 100.00 112,300.00 166.00 186,418.00    
713-01 temporary signs & barricades lump      LUMP 15,000.00 15,000.00 50,000.00 50,000.00 20,000.00 20,000.00    
713-03-E temporary pavement markings (24" width) 48      LNFT 0.90 43.20 1.00 48.00 1.00 48.00    
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
8.214  MILE 145.00 1,191.03 400.00 3,285.60 180.00 1,478.52    
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
8.214  MILE 330.00 2,710.62 350.00 2,874.90 300.00 2,464.20    
713-05-A temporary pavement markings (solid line)(4" width) 66.020  MILE 525.00 34,660.50 600.00 39,612.00 500.00 33,010.00    
717-01 seeding 86      LB 12.00 1,032.00 30.00 2,580.00 15.00 1,290.00    
718-01 fertilizer 2,880      LB 0.56 1,612.80 1.50 4,320.00 1.00 2,880.00    
727-01 mobilization lump      LUMP 55,000.00 55,000.00 50,000.00 50,000.00 90,000.00 90,000.00    
731-02 reflectorized raised pavement markers 1,256      EACH 6.00 7,536.00 6.00 7,536.00 5.50 6,908.00    
732-01-A plastic pavement striping (4" width) 305      LNFT 0.45 137.25 0.60 183.00 1.00 305.00    
732-01-E plastic pavement striping (24" width) 24      LNFT 3.60 86.40 4.00 96.00 7.00 168.00    
732-02-A plastic pavement striping (solid line) (4" width) 33.010  MILE 2,500.00 82,525.00 2,800.00 92,428.00 2,500.00 82,525.00    
732-03-A plastic pavement striping (broken line)(4" width) 4.107  MILE 890.00 3,655.23 900.00 3,696.30 900.00 3,696.30    
737-03-E painted traffic striping (solid line)(24" width) 104      LNFT 5.50 572.00 6.00 624.00 6.00 624.00    
740-01 construction layout lump      LUMP 35,000.00 35,000.00 50,000.00 50,000.00 100,000.00 100,000.00    
744-01 traffic control management lump      LUMP 7,000.00 7,000.00 15,000.00 15,000.00 80,000.00 80,000.00    
S-001 cold planing asphaltic pavement lump      LUMP 138,000.00 138,000.00 200,000.00 200,000.00 315,000.00 315,000.00    
S-002 u-channel post installation 2      EACH 275.00 550.00 300.00 600.00 200.00 400.00    
                       
 CONTRACTOR TOTAL       1,228,894.63   1,553,023.80   1,792,807.82    