Letting of 4/25/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 024-06-0033
Parish: VERNON
Routes: US 171
Description: US 171 BRIDGE NEAR LEESVILLE
Type Const: grading, drainage structures, class ii base course, superpave asphaltic concrete
pavement, and related work.
Estimated Construction Cost: $436,294.50
 
RankLicenseBidderConstruction Bid
1 25088 RCS CONTRACTORS, INC. $334,014.00
2 32044 QUALITY DESIGN & CONSTRUCTION, INC. $336,945.60
3 18546 C W & W CONTRACTORS, INC. $341,814.00
4 12879 PETERS CONSTRUCTION CO., INC. $393,476.36
5 44289 JEFF MERCER LLC $499,558.35
 
Item Number Item Description Quantity Unit of Measure - 1 -
RCS CONTRACTORS, INC.
- 2 -
QUALITY DESIGN & CONSTRUCTION, INC.
- 3 -
C W & W CONTRACTORS, INC.
- 4 -
PETERS CONSTRUCTION CO., INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 7,000.00 7,000.00 10,200.00 10,200.00 7,500.00 7,500.00 15,000.00 15,000.00
202-02-A removal of bridges (sta. 104+99.20; 39' x 23' timber
bridge)
1      EACH 5,000.00 5,000.00 10,300.00 10,300.00 5,000.00 5,000.00 10,000.00 10,000.00
202-02-H removal of guard rail 176      LNFT 2.00 352.00 11.00 1,936.00 10.00 1,760.00 11.36 1,999.36
203-06 excavation & embankment lump      LUMP 10,000.00 10,000.00 6,100.00 6,100.00 5,000.00 5,000.00 25,000.00 25,000.00
204-02 temporary hay or straw bales 20      EACH 10.00 200.00 14.00 280.00 5.00 100.00 10.00 200.00
204-06 temporary silt fencing 200      LNFT 5.00 1,000.00 2.00 400.00 1.00 200.00 3.00 600.00
302-01 class ii base course (stone) 52.6    CUYD 130.00 6,838.00 98.00 5,154.80 100.00 5,260.00 80.00 4,208.00
401-02 aggregate surface course (adjusted vehicular
measurement)
13      CUYD 75.00 975.00 92.00 1,196.00 130.00 1,690.00 60.00 780.00
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 100.00 5,000.00 77.00 3,850.00 100.00 5,000.00 80.00 4,000.00
502-01 superpave asphaltic concrete 60.1    TON 260.00 15,626.00 194.00 11,659.40 250.00 15,025.00 325.00 19,532.50
711-01-D riprap (55 lb, 18" thick) 392      SQYD 75.00 29,400.00 40.00 15,680.00 85.00 33,320.00 70.00 27,440.00
711-04 geotextile fabric 442      SQYD 2.00 884.00 2.20 972.40 4.00 1,768.00 3.00 1,326.00
713-01 temporary signs & barricades lump      LUMP 7,000.00 7,000.00 17,110.00 17,110.00 10,000.00 10,000.00 11,000.00 11,000.00
716-01-A mulch (vegetative) 0.16   ACRE 500.00 80.00 3,000.00 480.00 8,900.00 1,424.00 37,500.00 6,000.00
717-01 seeding 5      LB 20.00 100.00 6.00 30.00 75.00 375.00 30.00 150.00
718-01 fertilizer 161      LB 1.00 161.00 0.50 80.50 5.00 805.00 2.00 322.00
725-04 low profile runaround 1      EACH 25,000.00 25,000.00 38,180.00 38,180.00 35,000.00 35,000.00 75,000.00 75,000.00
726-01 bedding material 73.1    CUYD 85.00 6,213.50 136.00 9,941.60 100.00 7,310.00 55.00 4,020.50
727-01 mobilization lump      LUMP 15,000.00 15,000.00 10,000.00 10,000.00 30,000.00 30,000.00 15,000.00 15,000.00
740-01 construction layout lump      LUMP 4,000.00 4,000.00 7,100.00 7,100.00 10,000.00 10,000.00 15,000.00 15,000.00
744-01 traffic control management lump      LUMP 3,000.00 3,000.00 9,240.00 9,240.00 5,000.00 5,000.00 3,000.00 3,000.00
805-01-B class a concrete (box culvert headwalls) 41.73   CUYD 1,350.00 56,335.50 1,100.00 45,903.00 1,000.00 41,730.00 1,300.00 54,249.00
805-12-S-01 reinforced concrete box culverts (8' x 8') (precast
only, astm c1433)
88.0    LNFT 1,500.00 132,000.00 1,390.00 122,320.00 1,250.00 110,000.00 1,100.00 96,800.00
806-01 deformed reinforcing steel 2,849      LB 1.00 2,849.00 3.10 8,831.90 3.00 8,547.00 1.00 2,849.00
                       
 CONTRACTOR TOTAL       334,014.00   336,945.60   341,814.00   393,476.36
 
Item Number Item Description Quantity Unit of Measure - 5 -
JEFF MERCER LLC

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 35,000.00 35,000.00            
202-02-A removal of bridges (sta. 104+99.20; 39' x 23' timber
bridge)
1      EACH 1.00 1.00            
202-02-H removal of guard rail 176      LNFT 1.00 176.00            
203-06 excavation & embankment lump      LUMP 40,000.00 40,000.00            
204-02 temporary hay or straw bales 20      EACH 5.00 100.00            
204-06 temporary silt fencing 200      LNFT 1.00 200.00            
302-01 class ii base course (stone) 52.6    CUYD 75.00 3,945.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
13      CUYD 100.00 1,300.00            
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 70.00 3,500.00            
502-01 superpave asphaltic concrete 60.1    TON 70.00 4,207.00            
711-01-D riprap (55 lb, 18" thick) 392      SQYD 75.00 29,400.00            
711-04 geotextile fabric 442      SQYD 1.00 442.00            
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00            
716-01-A mulch (vegetative) 0.16   ACRE 800.00 128.00            
717-01 seeding 5      LB 5.00 25.00            
718-01 fertilizer 161      LB 0.35 56.35            
725-04 low profile runaround 1      EACH 1.00 1.00            
726-01 bedding material 73.1    CUYD 90.00 6,579.00            
727-01 mobilization lump      LUMP 100,000.00 100,000.00            
740-01 construction layout lump      LUMP 5,000.00 5,000.00            
744-01 traffic control management lump      LUMP 5,000.00 5,000.00            
805-01-B class a concrete (box culvert headwalls) 41.73   CUYD 1,300.00 54,249.00            
805-12-S-01 reinforced concrete box culverts (8' x 8') (precast
only, astm c1433)
88.0    LNFT 2,300.00 202,400.00            
806-01 deformed reinforcing steel 2,849      LB 1.00 2,849.00            
                       
 CONTRACTOR TOTAL       499,558.35            