Lead Project: 013-04-0037
Parish: E BATON ROUGE
Routes: US 61, US 190
Description: FLORIDA STREET TRAFFIC SIGNAL UPGRADE
Type Const: traffic signal upgrades and related work.
Estimated Construction Cost: $991,844.20
 
RankLicenseBidderConstruction Bid
1 27043 JACK B. HARPER CONTRACTOR, INC. $1,257,157.00
2 08470 DIAMOND ELECTRICAL CO., INC. $1,274,204.60
 
Item Number Item Description Quantity Unit of Measure - 1 -
JACK B. HARPER CONTRACTOR, INC.
- 2 -
DIAMOND ELECTRICAL CO., INC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 460      SQYD 28.00 12,880.00 26.00 11,960.00        
202-02-I removal of existing traffic signal equipment lump      LUMP 16,900.00 16,900.00 35,000.00 35,000.00        
706-01-A concrete walk (4" thick) 460.0    SQYD 90.00 41,400.00 72.00 33,120.00        
707-01 concrete curb 603.0    LNFT 25.00 15,075.00 34.00 20,502.00        
713-01 temporary signs & barricades lump      LUMP 18,850.00 18,850.00 28,000.00 28,000.00        
729-01 sign (type a) 192.0    SQFT 60.00 11,520.00 82.00 15,744.00        
732-01-D plastic pavement striping (12" width) 1,892      LNFT 3.00 5,676.00 3.90 7,378.80        
732-01-E plastic pavement striping (24" width) 364      LNFT 4.00 1,456.00 5.20 1,892.80        
732-04-A plastic pavement legends & symbols (arrow) 2      EACH 175.00 350.00 227.00 454.00        
732-04-C plastic pavement legends & symbols (only) 2      EACH 225.00 450.00 293.00 586.00        
736-01 trenching and backfilling 545      LNFT 7.00 3,815.00 4.00 2,180.00        
736-03-A jacked or bored conduit (2" dia. sch. 80 pec) 3,865      LNFT 17.00 65,705.00 15.00 57,975.00        
736-03-B jacked or bored conduit (3" dia. sch. 80 pec) 960      LNFT 28.00 26,880.00 21.00 20,160.00        
736-05-A signal heads (l.e.d., 3 section, 12" lenses, r, y, g) 40      EACH 906.00 36,240.00 1,056.00 42,240.00        
736-10-A underground junction box type "e" 20      EACH 396.50 7,930.00 553.00 11,060.00        
736-10-B underground junction box type "f" 20      EACH 481.00 9,620.00 651.00 13,020.00        
736-10-C underground junction box type "g" 2      EACH 903.50 1,807.00 1,250.00 2,500.00        
736-10-D underground junction box type "h" 13      EACH 916.50 11,914.50 1,390.00 18,070.00        
736-11-A conduit (2" dia. sch. 80 pec) 200      LNFT 4.50 900.00 3.16 632.00        
736-11-B conduit (3" dia. 80 pec) 345      LNFT 7.00 2,415.00 5.00 1,725.00        
736-12-A conductor, 6c (signal/ #14 awg) 2,135      LNFT 1.75 3,736.25 1.40 2,989.00        
736-12-B conductor, 10c (signal/ #14 awg) 5,690      LNFT 2.50 14,225.00 2.00 11,380.00        
736-12-C conductor, 3c (power/ #6 awg concentric) 30      LNFT 6.00 180.00 3.50 105.00        
736-12-D conductor, 2c (street light cable/ #6 awg) 2,635      LNFT 4.25 11,198.75 3.30 8,695.50        
736-12-E conductor, 2c (ped push button/ #14 awg) 4,320      LNFT 1.50 6,480.00 1.10 4,752.00        
744-01 traffic control management lump      LUMP 26,325.00 26,325.00 35,000.00 35,000.00        
S-001 unidirectional optical detector single channel 20      ea 689.00 13,780.00 898.00 17,960.00        
S-002 optical cable 2,455      LNFT 3.00 7,365.00 1.10 2,700.50        
S-003 phase selector 6      ea 4,004.00 24,024.00 3,090.00 18,540.00        
S-004 video detector device and connection 20      ea 6,565.00 131,300.00 6,400.00 128,000.00        
S-005 video detection system (florida st. @ lafayette st.) 1      ea 10,465.00 10,465.00 10,000.00 10,000.00        
S-006 video detection system (florida st. @ third st.) 1      ea 10,465.00 10,465.00 10,000.00 10,000.00        
S-007 video detection system (florida st. @ fourth st.) 1      ea 10,465.00 10,465.00 10,000.00 10,000.00        
S-008 video detection system (florida st. @ fifth st.) 1      ea 10,465.00 10,465.00 10,000.00 10,000.00        
S-009 video detection system (florida st. @ sixth st.) 1      ea 10,465.00 10,465.00 10,000.00 10,000.00        
S-010 video detection system (florida st. @ seventh st.) 1      ea 10,465.00 10,465.00 10,000.00 10,000.00        
S-011 street name sign 24      ea 585.00 14,040.00 723.00 17,352.00        
S-012 thirty-six fiber (twenty-four) multi-mode fibers and
twelve (12) single mod e fibers)(communication
cable/ fiber optic)
3,750      LNFT 7.50 28,125.00 4.50 16,875.00        
S-013 six fiber (4 multi-mode & 2 single mode fibers)
communication drop cable / fiber optic)
200      LNFT 5.85 1,170.00 2.60 520.00        
S-014 signal controller cabinet and controller 6      ea 23,237.50 139,425.00 24,700.00 148,200.00        
S-015 special design signal support, pedestal pole 6      ea 4,300.00 25,800.00 4,100.00 24,600.00        
S-016 special design signal support, 15' mast arm with
luminaire
1      ea 18,500.00 18,500.00 17,200.00 17,200.00        
S-017 special design signal support, 20' mast arm with
luminaire
1      ea 19,067.00 19,067.00 17,700.00 17,700.00        
S-018 special design signal support, 25' mast arm with
luminaire
9      ea 20,200.00 181,800.00 18,700.00 168,300.00        
S-019 special design signal support, 30' mast arm with
luminaire
1      ea 22,184.50 22,184.50 20,600.00 20,600.00        
S-020 special design signal support, 35' mast arm with
luminaire
4      ea 24,375.00 97,500.00 22,500.00 90,000.00        
S-021 special design signal support, dual 25' & 30' mast arm
with luminaire
1      ea 28,509.00 28,509.00 26,000.00 26,000.00        
S-022 special design signal support, dual 35' & 40' mast arm
with luminaire
1      ea 31,590.00 31,590.00 29,000.00 29,000.00        
S-023 truncated dome 24      ea 200.00 4,800.00 143.00 3,432.00        
S-024 modify existing controller 1      ea 11,960.00 11,960.00 13,025.00 13,025.00        
S-025 bollards 3      ea 350.00 1,050.00 625.00 1,875.00        
S-026 telephone service 1      ea 1,105.00 1,105.00 5,156.00 5,156.00        
S-027 pedestrian push button 48      ea 143.00 6,864.00 267.00 12,816.00        
S-028 led pedestrian and countdown signal heads 48      EACH 635.00 30,480.00 984.00 47,232.00        
                       
 CONTRACTOR TOTAL       1,257,157.00   1,274,204.60        