| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC |
- 2 - BOH BROS. CONSTRUCTION CO., LLC. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
600   |
LNFT |
6.00 |
3,600.00 |
6.00 |
3,600.00 |
|
|
|
|
| 202-03-A |
relocation of existing reusable signs
|
8   |
EACH |
150.00 |
1,200.00 |
200.00 |
1,600.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
500   |
CUYD |
25.00 |
12,500.00 |
30.00 |
15,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
18,406.8 |
TON |
75.00 |
1,380,510.00 |
95.00 |
1,748,646.00 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
2,533.7 |
TON |
75.00 |
190,027.50 |
55.00 |
139,353.50 |
|
|
|
|
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
20,207   |
LNFT |
1.50 |
30,310.50 |
1.30 |
26,269.10 |
|
|
|
|
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
24,250   |
LNFT |
1.50 |
36,375.00 |
1.40 |
33,950.00 |
|
|
|
|
| 704-03 |
blocked out guard rail
|
125.0 |
LNFT |
20.00 |
2,500.00 |
22.00 |
2,750.00 |
|
|
|
|
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
45.00 |
2,250.00 |
50.00 |
2,500.00 |
|
|
|
|
| 704-08-A |
guard rail transitions (single thrie beam)
|
184.0 |
LNFT |
60.00 |
11,040.00 |
60.00 |
11,040.00 |
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
6   |
EACH |
2,300.00 |
13,800.00 |
2,800.00 |
16,800.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
60,000.00 |
60,000.00 |
300,000.00 |
300,000.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
48   |
LNFT |
1.00 |
48.00 |
2.00 |
96.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.920 |
MILE |
150.00 |
588.00 |
400.00 |
1,568.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
3.400 |
MILE |
400.00 |
1,360.00 |
400.00 |
1,360.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
9.540 |
MILE |
700.00 |
6,678.00 |
700.00 |
6,678.00 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
6   |
EACH |
60.00 |
360.00 |
60.00 |
360.00 |
|
|
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
6   |
EACH |
80.00 |
480.00 |
80.00 |
480.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
2,357   |
SQYD |
90.00 |
212,130.00 |
100.00 |
235,700.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
240,000.00 |
240,000.00 |
280,000.00 |
280,000.00 |
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
75.00 |
600.00 |
100.00 |
800.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
517   |
EACH |
6.00 |
3,102.00 |
6.00 |
3,102.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
48   |
LNFT |
5.00 |
240.00 |
5.00 |
240.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
9.540 |
MILE |
2,800.00 |
26,712.00 |
2,700.00 |
25,758.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
3.400 |
MILE |
1,000.00 |
3,400.00 |
900.00 |
3,060.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
200.00 |
600.00 |
200.00 |
600.00 |
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
200.00 |
600.00 |
200.00 |
600.00 |
|
|
|
|
| 735-01 |
mailboxes
|
125   |
EACH |
140.00 |
17,500.00 |
7.00 |
875.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
105   |
EACH |
120.00 |
12,600.00 |
130.00 |
13,650.00 |
|
|
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
3.00 |
6.00 |
200.00 |
400.00 |
|
|
|
|
| 735-04 |
mailbox supports (multiple)
|
4   |
EACH |
5.00 |
20.00 |
300.00 |
1,200.00 |
|
|
|
|
| 736-09 |
loop detector
|
256   |
LNFT |
14.00 |
3,584.00 |
15.00 |
3,840.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
30,000.00 |
30,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
30,000.00 |
30,000.00 |
7,000.00 |
7,000.00 |
|
|
|
|
| S-001 |
special anchor section
|
2   |
EACH |
1,200.00 |
2,400.00 |
1,300.00 |
2,600.00 |
|
|
|
|
| S-002 |
removal of abandoned railroad tracks
|
lump |
LUMP |
60,000.00 |
60,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
20,207   |
LNFT |
1.50 |
30,310.50 |
1.20 |
24,248.40 |
|
|
|
|
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
24,250   |
LNFT |
1.50 |
36,375.00 |
1.50 |
36,375.00 |
|
|
|
|
| S-927 |
sawcuts in asphaltic concrete lifts
|
44,457   |
LNFT |
1.00 |
44,457.00 |
0.40 |
17,782.80 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
2,508,263.50 |
|
2,979,881.80 |
|
|
|
|
|