| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - H & S CONSTRUCTION CO., INC. |
- 2 - R. E. HEIDT CONSTRUCTION CO., INC. |
- 3 - PRAIRIE CONTRACTORS INC. |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
3,500.00 |
3,500.00 |
2,625.00 |
2,625.00 |
5,000.00 |
5,000.00 |
15,000.00 |
15,000.00 |
| 202-02-H |
removal of guard rail
|
270   |
LNFT |
4.74 |
1,279.80 |
11.00 |
2,970.00 |
20.00 |
5,400.00 |
6.00 |
1,620.00 |
| 203-08 |
borrow (vehicular measurement)
|
530   |
CUYD |
25.00 |
13,250.00 |
60.00 |
31,800.00 |
40.00 |
21,200.00 |
28.00 |
14,840.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
1,777   |
CUYD |
55.00 |
97,735.00 |
95.00 |
168,815.00 |
40.00 |
71,080.00 |
30.00 |
53,310.00 |
| 502-01 |
superpave asphaltic concrete
|
27,557.0 |
TON |
80.50 |
2,218,338.50 |
104.00 |
2,865,928.00 |
93.00 |
2,562,801.00 |
90.00 |
2,480,130.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,061.7 |
TON |
125.00 |
132,712.50 |
125.00 |
132,712.50 |
150.00 |
159,255.00 |
110.00 |
116,787.00 |
| 509-01 |
cold planing asphaltic pavement
|
143,208   |
SQYD |
1.00 |
143,208.00 |
0.33 |
47,258.64 |
1.50 |
214,812.00 |
2.05 |
293,576.40 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,985   |
CUYD |
0.01 |
- 29.85 |
1.00 |
- 2,985.00 |
0.01 |
- 29.85 |
0.01 |
- 29.85 |
| 701-05-G |
side drain pipe (18")
|
68   |
LNFT |
142.00 |
9,656.00 |
126.00 |
8,568.00 |
130.00 |
8,840.00 |
84.00 |
5,712.00 |
| 701-05-I |
side drain pipe (24")
|
48   |
LNFT |
175.00 |
8,400.00 |
156.00 |
7,488.00 |
175.00 |
8,400.00 |
90.00 |
4,320.00 |
| 701-15 |
concrete collar
|
2   |
EACH |
900.00 |
1,800.00 |
788.00 |
1,576.00 |
1,000.00 |
2,000.00 |
2,000.00 |
4,000.00 |
| 702-01 |
junction boxes
|
1   |
EACH |
5,340.00 |
5,340.00 |
4,725.00 |
4,725.00 |
5,000.00 |
5,000.00 |
2,400.00 |
2,400.00 |
| 702-04-A |
adjusting manholes
|
6   |
EACH |
120.00 |
720.00 |
1,575.00 |
9,450.00 |
1,000.00 |
6,000.00 |
1,200.00 |
7,200.00 |
| 702-04-C |
adjusting junction boxes
|
1   |
EACH |
2,967.00 |
2,967.00 |
2,625.00 |
2,625.00 |
2,000.00 |
2,000.00 |
2,000.00 |
2,000.00 |
| 702-04-E |
adjusting water valves
|
8   |
EACH |
95.00 |
760.00 |
630.00 |
5,040.00 |
750.00 |
6,000.00 |
500.00 |
4,000.00 |
| 702-08-A |
side drain safety end (type 1)
|
4   |
EACH |
1,780.00 |
7,120.00 |
1,575.00 |
6,300.00 |
2,000.00 |
8,000.00 |
3,800.00 |
15,200.00 |
| 704-03 |
blocked out guard rail
|
106.3 |
LNFT |
29.00 |
3,082.70 |
26.25 |
2,790.38 |
20.00 |
2,126.00 |
23.00 |
2,444.90 |
| 704-07-A |
guard rail bridge attachments (single thrie beam)
|
50.0 |
LNFT |
60.00 |
3,000.00 |
52.50 |
2,625.00 |
40.00 |
2,000.00 |
45.00 |
2,250.00 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
71.00 |
7,100.00 |
63.00 |
6,300.00 |
60.00 |
6,000.00 |
65.00 |
6,500.00 |
| 704-11-A |
guard rail end treatment (flared)
|
3   |
EACH |
2,967.00 |
8,901.00 |
2,625.00 |
7,875.00 |
2,000.00 |
6,000.00 |
2,300.00 |
6,900.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
1   |
EACH |
3,560.00 |
3,560.00 |
3,150.00 |
3,150.00 |
3,000.00 |
3,000.00 |
2,900.00 |
2,900.00 |
| 706-03-A |
incidental concrete paving (4" thick)
|
6.7 |
SQYD |
575.00 |
3,852.50 |
509.25 |
3,411.98 |
500.00 |
3,350.00 |
120.00 |
804.00 |
| 707-01 |
concrete curb
|
20.0 |
LNFT |
60.00 |
1,200.00 |
52.50 |
1,050.00 |
50.00 |
1,000.00 |
30.00 |
600.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
95,000.00 |
95,000.00 |
7,214.00 |
7,214.00 |
200,000.00 |
200,000.00 |
75,000.00 |
75,000.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
4,383   |
LNFT |
0.42 |
1,840.86 |
0.26 |
1,139.58 |
0.01 |
43.83 |
0.50 |
2,191.50 |
| 713-03-E |
temporary pavement markings (24" width)
|
3,540   |
LNFT |
1.30 |
4,602.00 |
0.76 |
2,690.40 |
0.01 |
35.40 |
1.30 |
4,602.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
14.010 |
MILE |
350.00 |
4,903.50 |
283.12 |
3,966.51 |
400.00 |
5,604.00 |
590.00 |
8,265.90 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
37.377 |
MILE |
386.00 |
14,427.52 |
315.00 |
11,773.76 |
0.01 |
0.37 |
380.00 |
14,203.26 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
51.273 |
MILE |
707.00 |
36,250.01 |
630.00 |
32,301.99 |
0.01 |
0.51 |
700.00 |
35,891.10 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
117   |
EACH |
65.00 |
7,605.00 |
63.00 |
7,371.00 |
0.01 |
1.17 |
65.00 |
7,605.00 |
| 713-06-E |
temporary pavement legends and symbols (school
crossing) |
6   |
EACH |
119.00 |
714.00 |
210.00 |
1,260.00 |
0.01 |
0.06 |
115.00 |
690.00 |
| 717-01 |
seeding
|
20   |
LB |
25.00 |
500.00 |
33.50 |
670.00 |
50.00 |
1,000.00 |
35.00 |
700.00 |
| 718-01 |
fertilizer
|
335   |
LB |
1.25 |
418.75 |
4.00 |
1,340.00 |
10.00 |
3,350.00 |
1.40 |
469.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
50   |
SQYD |
250.00 |
12,500.00 |
266.75 |
13,337.50 |
175.00 |
8,750.00 |
200.00 |
10,000.00 |
| 724-02 |
pavement widening
|
88.5 |
SQYD |
120.00 |
10,620.00 |
129.00 |
11,416.50 |
175.00 |
15,487.50 |
140.00 |
12,390.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
35,000.00 |
35,000.00 |
134,000.00 |
134,000.00 |
200,000.00 |
200,000.00 |
250,000.00 |
250,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
38   |
EACH |
71.00 |
2,698.00 |
63.00 |
2,394.00 |
60.00 |
2,280.00 |
70.00 |
2,660.00 |
| 729-16-C |
object marker assembly (type 3)
|
4   |
EACH |
89.00 |
356.00 |
79.00 |
316.00 |
75.00 |
300.00 |
90.00 |
360.00 |
| 731-02 |
reflectorized raised pavement markers
|
617   |
EACH |
6.17 |
3,806.89 |
5.00 |
3,085.00 |
5.00 |
3,085.00 |
6.00 |
3,702.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
1,461   |
LNFT |
1.00 |
1,461.00 |
1.05 |
1,534.05 |
1.00 |
1,461.00 |
1.00 |
1,461.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
1,180   |
LNFT |
4.00 |
4,720.00 |
3.15 |
3,717.00 |
3.00 |
3,540.00 |
4.00 |
4,720.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
17.091 |
MILE |
2,860.00 |
48,880.26 |
2,257.50 |
38,582.93 |
2,200.00 |
37,600.20 |
2,800.00 |
47,854.80 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
12.459 |
MILE |
961.00 |
11,973.10 |
735.00 |
9,157.37 |
700.00 |
8,721.30 |
960.00 |
11,960.64 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
39   |
EACH |
231.00 |
9,009.00 |
157.50 |
6,142.50 |
200.00 |
7,800.00 |
230.00 |
8,970.00 |
| 732-04-E |
plastic pavement legends & symbols (school crossing)
|
2   |
EACH |
475.00 |
950.00 |
525.00 |
1,050.00 |
500.00 |
1,000.00 |
480.00 |
960.00 |
| 735-01 |
mailboxes
|
73   |
EACH |
12.00 |
876.00 |
1.05 |
76.65 |
1.00 |
73.00 |
1.20 |
87.60 |
| 735-02 |
mailbox supports (single)
|
74   |
EACH |
155.00 |
11,470.00 |
122.85 |
9,090.90 |
120.00 |
8,880.00 |
130.00 |
9,620.00 |
| 735-03 |
mailbox supports (double)
|
4   |
EACH |
279.00 |
1,116.00 |
183.75 |
735.00 |
200.00 |
800.00 |
178.00 |
712.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
4,850.00 |
4,850.00 |
5,005.00 |
5,005.00 |
20,000.00 |
20,000.00 |
25,000.00 |
25,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
38,000.00 |
38,000.00 |
92,065.00 |
92,065.00 |
60,000.00 |
60,000.00 |
170,000.00 |
170,000.00 |
| S-001 |
rumble strips (ground-in)
|
3.2 |
MILE |
2,250.00 |
7,200.00 |
4,725.00 |
15,120.00 |
3,000.00 |
9,600.00 |
1,500.00 |
4,800.00 |
| S-101 |
video detection camera and traffic signal interface
appurtenances |
18   |
EACH |
8,984.00 |
161,712.00 |
7,950.00 |
143,100.00 |
10,000.00 |
180,000.00 |
9,000.00 |
162,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
3,210,913.04 |
|
3,881,751.14 |
|
3,888,647.49 |
|
3,919,340.25 |
|