Letting of 3/28/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 742-10-0104
Parish: CALCASIEU
Routes:
Description: WESTLAKE BIKEWAY FACILITY & WHISPERING WOOD DRIVE
Type Const: grading, drainage structures, lime treatment, class ii base course, cold planing
asphaltic pavement, superpave ac ovly, pccp, concrete walkway, pavement widening, and related work.
Estimated Construction Cost: $7,826,295.10
 
RankLicenseBidderConstruction Bid
1 14648 MCMANUS CONSTRUCTION, INC. $7,297,198.10
2 39462 DENTON-JAMES LLC $7,938,051.65
3 38299 K.A.S. CONSTRUCTION LLC $8,291,357.00
4 12312 GILCHRIST CONSTRUCTION CO. LLC $8,688,686.30
 
Item Number Item Description Quantity Unit of Measure - 1 -
MCMANUS CONSTRUCTION, INC.
- 2 -
DENTON-JAMES LLC
- 3 -
K.A.S. CONSTRUCTION LLC
- 4 -
GILCHRIST CONSTRUCTION CO. LLC
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 100,000.00 100,000.00 300,000.00 300,000.00 100,000.00 100,000.00 150,000.00 150,000.00
202-01 removal of structures & obstructions lump      LUMP 20,000.00 20,000.00 24,000.00 24,000.00 60,000.00 60,000.00 20,000.00 20,000.00
203-01 general excavation 30,557      CUYD 6.00 183,342.00 8.00 244,456.00 11.00 336,127.00 7.00 213,899.00
203-02 drainage excavation 2,500      CUYD 10.00 25,000.00 11.00 27,500.00 9.00 22,500.00 9.00 22,500.00
203-03 muck excavation 1,380      CUYD 15.00 20,700.00 13.00 17,940.00 11.00 15,180.00 12.00 16,560.00
203-04 embankment 3,161      CUYD 12.00 37,932.00 32.00 101,152.00 12.00 37,932.00 25.00 79,025.00
204-02 temporary hay or straw bales 753      EACH 12.00 9,036.00 8.00 6,024.00 8.00 6,024.00 13.00 9,789.00
204-06 temporary silt fencing 2,094      LNFT 4.00 8,376.00 1.50 3,141.00 2.50 5,235.00 1.50 3,141.00
302-02-A class ii base course (6" thick) (soil cement) 43,287.3    SQYD 10.00 432,873.00 8.50 367,942.05 10.00 432,873.00 9.50 411,229.35
302-02-E class ii base course (4" thick) (stone or recycled
pccp)
43,287.3    SQYD 10.00 432,873.00 12.00 519,447.60 12.00 519,447.60 10.50 454,516.65
304-01 lime 40.40   TON 180.00 7,272.00 300.00 12,120.00 125.00 5,050.00 500.00 20,200.00
304-04-E lime treatment (type d) (8" thick) 43,287      SQYD 2.00 86,574.00 3.00 129,861.00 1.90 82,245.30 1.50 64,930.50
402-01 traffic maintenance aggregate (vehicular measurement) 50.0    CUYD 80.00 4,000.00 100.00 5,000.00 55.00 2,750.00 45.00 2,250.00
502-01 superpave asphaltic concrete 520.2    TON 150.00 78,030.00 100.00 52,020.00 85.00 44,217.00 120.00 62,424.00
509-01 cold planing asphaltic pavement 2,513      SQYD 10.00 25,130.00 4.00 10,052.00 3.00 7,539.00 4.00 10,052.00
601-01-G portland cement concrete pavement (8" thick) 37,682.8    SQYD 60.00 2,260,968.00 48.00 1,808,774.40 59.00 2,223,285.20 47.00 1,771,091.60
601-02-G portland cement concrete pavement (8" thick)
(crossovers & turnouts)
2,896.9    SQYD 80.00 231,752.00 65.00 188,298.50 72.00 208,576.80 60.00 173,814.00
701-03-F storm drain pipe (15" rcp/pcp) 4,441      LNFT 37.00 164,317.00 52.00 230,932.00 52.00 230,932.00 65.00 288,665.00
701-03-G storm drain pipe (18" rcp/pcp) 1,181      LNFT 43.00 50,783.00 58.00 68,498.00 54.00 63,774.00 90.00 106,290.00
701-03-I storm drain pipe (24" rcp/pcp) 1,845      LNFT 56.00 103,320.00 72.00 132,840.00 74.00 136,530.00 115.00 212,175.00
701-03-K storm drain pipe (30" rcp/pcp) 1,045      LNFT 72.00 75,240.00 80.00 83,600.00 87.00 90,915.00 135.00 141,075.00
701-03-M storm drain pipe (36" rcp/pcp) 1,773      LNFT 85.00 150,705.00 104.00 184,392.00 110.00 195,030.00 155.00 274,815.00
701-03-N storm drain pipe (42" rcp/pcp) 1,254      LNFT 105.00 131,670.00 130.00 163,020.00 145.00 181,830.00 180.00 225,720.00
701-03-O storm drain pipe (48" rcp/pcp) 648      LNFT 125.00 81,000.00 140.00 90,720.00 210.00 136,080.00 200.00 129,600.00
701-03-P storm drain pipe (54" rcp/pcp) 283      LNFT 218.00 61,694.00 190.00 53,770.00 232.00 65,656.00 225.00 63,675.00
701-03-Q storm drain pipe (60" rcp/pcp) 327      LNFT 240.00 78,480.00 200.00 65,400.00 275.00 89,925.00 260.00 85,020.00
701-03-S storm drain pipe (72" rcp/pcp) 515      LNFT 270.00 139,050.00 230.00 118,450.00 355.00 182,825.00 660.00 339,900.00
702-03-A catch basins (cb-01) 7      EACH 2,500.00 17,500.00 2,700.00 18,900.00 3,450.00 24,150.00 2,400.00 16,800.00
702-03-C catch basins (cb-06) 127      EACH 2,500.00 317,500.00 4,000.00 508,000.00 3,750.00 476,250.00 5,700.00 723,900.00
702-03-D catch basins (cb-07) 10      EACH 3,500.00 35,000.00 5,500.00 55,000.00 4,850.00 48,500.00 7,400.00 74,000.00
702-03-F catch basins (cb-08) 34      EACH 4,000.00 136,000.00 7,000.00 238,000.00 7,200.00 244,800.00 9,600.00 326,400.00
702-04-C adjusting junction boxes 1      EACH 5,000.00 5,000.00 3,000.00 3,000.00 6,500.00 6,500.00 1,200.00 1,200.00
703-03 perforated pipe underdrains 18,630      LNFT 15.00 279,450.00 9.00 167,670.00 7.00 130,410.00 9.00 167,670.00
706-01-A concrete walk (4" thick) 6,559.5    SQYD 40.00 262,380.00 38.00 249,261.00 37.00 242,701.50 42.00 275,499.00
706-01-C concrete walk (6" thick) 7,146.3    SQYD 50.00 357,315.00 46.00 328,729.80 49.00 350,168.70 50.00 357,315.00
707-01 concrete curb 23,390.0    LNFT 8.00 187,120.00 6.00 140,340.00 11.00 257,290.00 3.00 70,170.00
713-01 temporary signs & barricades lump      LUMP 40,000.00 40,000.00 60,000.00 60,000.00 35,000.00 35,000.00 14,000.00 14,000.00
717-01 seeding 250      LB 50.00 12,500.00 9.00 2,250.00 9.00 2,250.00 11.00 2,750.00
718-01 fertilizer 7,500      LB 2.00 15,000.00 0.35 2,625.00 0.45 3,375.00 0.50 3,750.00
720-01-A erosion control system, slope protection (type a) 3,683      SQYD 2.50 9,207.50 1.30 4,787.90 1.50 5,524.50 1.60 5,892.80
722-01 project site laboratory 1      EACH 10,000.00 10,000.00 20,000.00 20,000.00 20,000.00 20,000.00 26,000.00 26,000.00
724-02 pavement widening 1,005.2    SQYD 125.00 125,650.00 65.00 65,338.00 75.00 75,390.00 106.00 106,551.20
726-01 bedding material 1,150.0    CUYD 80.00 92,000.00 75.00 86,250.00 75.00 86,250.00 90.00 103,500.00
727-01 mobilization lump      LUMP 100,000.00 100,000.00 780,000.00 780,000.00 500,000.00 500,000.00 800,000.00 800,000.00
729-01 sign (type a) 196.5    SQFT 50.00 9,825.00 30.00 5,895.00 25.00 4,912.50 30.00 5,895.00
729-08-A mounting (2 1/2" post) 52      EACH 1,000.00 52,000.00 700.00 36,400.00 675.00 35,100.00 120.00 6,240.00
731-02 reflectorized raised pavement markers 1,325      EACH 6.00 7,950.00 5.20 6,890.00 6.00 7,950.00 6.00 7,950.00
732-01-C plastic pavement striping (8" width) 719      LNFT 2.00 1,438.00 0.90 647.10 1.10 790.90 1.00 719.00
732-01-E plastic pavement striping (24" width) 160      LNFT 4.00 640.00 4.00 640.00 4.25 680.00 4.75 760.00
732-02-A plastic pavement striping (solid line) (4" width) 6.426  MILE 3,600.00 23,133.60 2,500.00 16,065.00 2,850.00 18,314.10 3,000.00 19,278.00
732-03-A plastic pavement striping (broken line)(4" width) 0.572  MILE 1,000.00 572.00 900.00 514.80 950.00 543.40 1,100.00 629.20
732-04-A plastic pavement legends & symbols (arrow) 13      EACH 200.00 2,600.00 200.00 2,600.00 225.00 2,925.00 250.00 3,250.00
732-04-C plastic pavement legends & symbols (only) 11      EACH 200.00 2,200.00 200.00 2,200.00 235.00 2,585.00 250.00 2,750.00
739-01 hydro-seeding 7.05   ACRE 2,000.00 14,100.00 950.00 6,697.50 1,350.00 9,517.50 1,200.00 8,460.00
740-01 construction layout lump      LUMP 155,000.00 155,000.00 100,000.00 100,000.00 150,000.00 150,000.00 180,000.00 180,000.00
744-01 traffic control management lump      LUMP 26,000.00 26,000.00 20,000.00 20,000.00 67,000.00 67,000.00 25,000.00 25,000.00
                       
 CONTRACTOR TOTAL       7,297,198.10   7,938,051.65   8,291,357.00   8,688,686.30