| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MCMANUS CONSTRUCTION, INC. |
- 2 - DENTON-JAMES LLC |
- 3 - K.A.S. CONSTRUCTION LLC |
- 4 - GILCHRIST CONSTRUCTION CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
100,000.00 |
100,000.00 |
300,000.00 |
300,000.00 |
100,000.00 |
100,000.00 |
150,000.00 |
150,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
20,000.00 |
20,000.00 |
24,000.00 |
24,000.00 |
60,000.00 |
60,000.00 |
20,000.00 |
20,000.00 |
| 203-01 |
general excavation
|
30,557   |
CUYD |
6.00 |
183,342.00 |
8.00 |
244,456.00 |
11.00 |
336,127.00 |
7.00 |
213,899.00 |
| 203-02 |
drainage excavation
|
2,500   |
CUYD |
10.00 |
25,000.00 |
11.00 |
27,500.00 |
9.00 |
22,500.00 |
9.00 |
22,500.00 |
| 203-03 |
muck excavation
|
1,380   |
CUYD |
15.00 |
20,700.00 |
13.00 |
17,940.00 |
11.00 |
15,180.00 |
12.00 |
16,560.00 |
| 203-04 |
embankment
|
3,161   |
CUYD |
12.00 |
37,932.00 |
32.00 |
101,152.00 |
12.00 |
37,932.00 |
25.00 |
79,025.00 |
| 204-02 |
temporary hay or straw bales
|
753   |
EACH |
12.00 |
9,036.00 |
8.00 |
6,024.00 |
8.00 |
6,024.00 |
13.00 |
9,789.00 |
| 204-06 |
temporary silt fencing
|
2,094   |
LNFT |
4.00 |
8,376.00 |
1.50 |
3,141.00 |
2.50 |
5,235.00 |
1.50 |
3,141.00 |
| 302-02-A |
class ii base course (6" thick) (soil cement)
|
43,287.3 |
SQYD |
10.00 |
432,873.00 |
8.50 |
367,942.05 |
10.00 |
432,873.00 |
9.50 |
411,229.35 |
| 302-02-E |
class ii base course (4" thick) (stone or recycled
pccp) |
43,287.3 |
SQYD |
10.00 |
432,873.00 |
12.00 |
519,447.60 |
12.00 |
519,447.60 |
10.50 |
454,516.65 |
| 304-01 |
lime
|
40.40 |
TON |
180.00 |
7,272.00 |
300.00 |
12,120.00 |
125.00 |
5,050.00 |
500.00 |
20,200.00 |
| 304-04-E |
lime treatment (type d) (8" thick)
|
43,287   |
SQYD |
2.00 |
86,574.00 |
3.00 |
129,861.00 |
1.90 |
82,245.30 |
1.50 |
64,930.50 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
50.0 |
CUYD |
80.00 |
4,000.00 |
100.00 |
5,000.00 |
55.00 |
2,750.00 |
45.00 |
2,250.00 |
| 502-01 |
superpave asphaltic concrete
|
520.2 |
TON |
150.00 |
78,030.00 |
100.00 |
52,020.00 |
85.00 |
44,217.00 |
120.00 |
62,424.00 |
| 509-01 |
cold planing asphaltic pavement
|
2,513   |
SQYD |
10.00 |
25,130.00 |
4.00 |
10,052.00 |
3.00 |
7,539.00 |
4.00 |
10,052.00 |
| 601-01-G |
portland cement concrete pavement (8" thick)
|
37,682.8 |
SQYD |
60.00 |
2,260,968.00 |
48.00 |
1,808,774.40 |
59.00 |
2,223,285.20 |
47.00 |
1,771,091.60 |
| 601-02-G |
portland cement concrete pavement (8" thick)
(crossovers & turnouts) |
2,896.9 |
SQYD |
80.00 |
231,752.00 |
65.00 |
188,298.50 |
72.00 |
208,576.80 |
60.00 |
173,814.00 |
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
4,441   |
LNFT |
37.00 |
164,317.00 |
52.00 |
230,932.00 |
52.00 |
230,932.00 |
65.00 |
288,665.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
1,181   |
LNFT |
43.00 |
50,783.00 |
58.00 |
68,498.00 |
54.00 |
63,774.00 |
90.00 |
106,290.00 |
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
1,845   |
LNFT |
56.00 |
103,320.00 |
72.00 |
132,840.00 |
74.00 |
136,530.00 |
115.00 |
212,175.00 |
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
1,045   |
LNFT |
72.00 |
75,240.00 |
80.00 |
83,600.00 |
87.00 |
90,915.00 |
135.00 |
141,075.00 |
| 701-03-M |
storm drain pipe (36" rcp/pcp)
|
1,773   |
LNFT |
85.00 |
150,705.00 |
104.00 |
184,392.00 |
110.00 |
195,030.00 |
155.00 |
274,815.00 |
| 701-03-N |
storm drain pipe (42" rcp/pcp)
|
1,254   |
LNFT |
105.00 |
131,670.00 |
130.00 |
163,020.00 |
145.00 |
181,830.00 |
180.00 |
225,720.00 |
| 701-03-O |
storm drain pipe (48" rcp/pcp)
|
648   |
LNFT |
125.00 |
81,000.00 |
140.00 |
90,720.00 |
210.00 |
136,080.00 |
200.00 |
129,600.00 |
| 701-03-P |
storm drain pipe (54" rcp/pcp)
|
283   |
LNFT |
218.00 |
61,694.00 |
190.00 |
53,770.00 |
232.00 |
65,656.00 |
225.00 |
63,675.00 |
| 701-03-Q |
storm drain pipe (60" rcp/pcp)
|
327   |
LNFT |
240.00 |
78,480.00 |
200.00 |
65,400.00 |
275.00 |
89,925.00 |
260.00 |
85,020.00 |
| 701-03-S |
storm drain pipe (72" rcp/pcp)
|
515   |
LNFT |
270.00 |
139,050.00 |
230.00 |
118,450.00 |
355.00 |
182,825.00 |
660.00 |
339,900.00 |
| 702-03-A |
catch basins (cb-01)
|
7   |
EACH |
2,500.00 |
17,500.00 |
2,700.00 |
18,900.00 |
3,450.00 |
24,150.00 |
2,400.00 |
16,800.00 |
| 702-03-C |
catch basins (cb-06)
|
127   |
EACH |
2,500.00 |
317,500.00 |
4,000.00 |
508,000.00 |
3,750.00 |
476,250.00 |
5,700.00 |
723,900.00 |
| 702-03-D |
catch basins (cb-07)
|
10   |
EACH |
3,500.00 |
35,000.00 |
5,500.00 |
55,000.00 |
4,850.00 |
48,500.00 |
7,400.00 |
74,000.00 |
| 702-03-F |
catch basins (cb-08)
|
34   |
EACH |
4,000.00 |
136,000.00 |
7,000.00 |
238,000.00 |
7,200.00 |
244,800.00 |
9,600.00 |
326,400.00 |
| 702-04-C |
adjusting junction boxes
|
1   |
EACH |
5,000.00 |
5,000.00 |
3,000.00 |
3,000.00 |
6,500.00 |
6,500.00 |
1,200.00 |
1,200.00 |
| 703-03 |
perforated pipe underdrains
|
18,630   |
LNFT |
15.00 |
279,450.00 |
9.00 |
167,670.00 |
7.00 |
130,410.00 |
9.00 |
167,670.00 |
| 706-01-A |
concrete walk (4" thick)
|
6,559.5 |
SQYD |
40.00 |
262,380.00 |
38.00 |
249,261.00 |
37.00 |
242,701.50 |
42.00 |
275,499.00 |
| 706-01-C |
concrete walk (6" thick)
|
7,146.3 |
SQYD |
50.00 |
357,315.00 |
46.00 |
328,729.80 |
49.00 |
350,168.70 |
50.00 |
357,315.00 |
| 707-01 |
concrete curb
|
23,390.0 |
LNFT |
8.00 |
187,120.00 |
6.00 |
140,340.00 |
11.00 |
257,290.00 |
3.00 |
70,170.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
40,000.00 |
40,000.00 |
60,000.00 |
60,000.00 |
35,000.00 |
35,000.00 |
14,000.00 |
14,000.00 |
| 717-01 |
seeding
|
250   |
LB |
50.00 |
12,500.00 |
9.00 |
2,250.00 |
9.00 |
2,250.00 |
11.00 |
2,750.00 |
| 718-01 |
fertilizer
|
7,500   |
LB |
2.00 |
15,000.00 |
0.35 |
2,625.00 |
0.45 |
3,375.00 |
0.50 |
3,750.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
3,683   |
SQYD |
2.50 |
9,207.50 |
1.30 |
4,787.90 |
1.50 |
5,524.50 |
1.60 |
5,892.80 |
| 722-01 |
project site laboratory
|
1   |
EACH |
10,000.00 |
10,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
20,000.00 |
26,000.00 |
26,000.00 |
| 724-02 |
pavement widening
|
1,005.2 |
SQYD |
125.00 |
125,650.00 |
65.00 |
65,338.00 |
75.00 |
75,390.00 |
106.00 |
106,551.20 |
| 726-01 |
bedding material
|
1,150.0 |
CUYD |
80.00 |
92,000.00 |
75.00 |
86,250.00 |
75.00 |
86,250.00 |
90.00 |
103,500.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
100,000.00 |
100,000.00 |
780,000.00 |
780,000.00 |
500,000.00 |
500,000.00 |
800,000.00 |
800,000.00 |
| 729-01 |
sign (type a)
|
196.5 |
SQFT |
50.00 |
9,825.00 |
30.00 |
5,895.00 |
25.00 |
4,912.50 |
30.00 |
5,895.00 |
| 729-08-A |
mounting (2 1/2" post)
|
52   |
EACH |
1,000.00 |
52,000.00 |
700.00 |
36,400.00 |
675.00 |
35,100.00 |
120.00 |
6,240.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,325   |
EACH |
6.00 |
7,950.00 |
5.20 |
6,890.00 |
6.00 |
7,950.00 |
6.00 |
7,950.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
719   |
LNFT |
2.00 |
1,438.00 |
0.90 |
647.10 |
1.10 |
790.90 |
1.00 |
719.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
160   |
LNFT |
4.00 |
640.00 |
4.00 |
640.00 |
4.25 |
680.00 |
4.75 |
760.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
6.426 |
MILE |
3,600.00 |
23,133.60 |
2,500.00 |
16,065.00 |
2,850.00 |
18,314.10 |
3,000.00 |
19,278.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.572 |
MILE |
1,000.00 |
572.00 |
900.00 |
514.80 |
950.00 |
543.40 |
1,100.00 |
629.20 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
13   |
EACH |
200.00 |
2,600.00 |
200.00 |
2,600.00 |
225.00 |
2,925.00 |
250.00 |
3,250.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
11   |
EACH |
200.00 |
2,200.00 |
200.00 |
2,200.00 |
235.00 |
2,585.00 |
250.00 |
2,750.00 |
| 739-01 |
hydro-seeding
|
7.05 |
ACRE |
2,000.00 |
14,100.00 |
950.00 |
6,697.50 |
1,350.00 |
9,517.50 |
1,200.00 |
8,460.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
155,000.00 |
155,000.00 |
100,000.00 |
100,000.00 |
150,000.00 |
150,000.00 |
180,000.00 |
180,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
26,000.00 |
26,000.00 |
20,000.00 |
20,000.00 |
67,000.00 |
67,000.00 |
25,000.00 |
25,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
7,297,198.10 |
|
7,938,051.65 |
|
8,291,357.00 |
|
8,688,686.30 |
|