| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BOH BROS. CONSTRUCTION CO., LLC. |
- 2 - CYCLE CONSTRUCTION CO. L.L.C. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
5,000.00 |
5,000.00 |
3,800.00 |
3,800.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1,000.00 |
1,000.00 |
35,000.00 |
35,000.00 |
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
417   |
SQYD |
10.00 |
4,170.00 |
10.00 |
4,170.00 |
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
606.3 |
SQYD |
10.00 |
6,063.00 |
10.00 |
6,063.00 |
|
|
|
|
| 202-02-I |
removal of existing traffic signal
|
1   |
EACH |
5,000.00 |
5,000.00 |
5,500.00 |
5,500.00 |
|
|
|
|
| 202-02-J |
removal of wood frame building with awning (rt of sta
1102+50; 1065 sq ft on concrete slab) |
1   |
EACH |
10,000.00 |
10,000.00 |
5,500.00 |
5,500.00 |
|
|
|
|
| 203-08 |
borrow (vehicular measurement)
|
150   |
CUYD |
25.00 |
3,750.00 |
17.00 |
2,550.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
3   |
EACH |
50.00 |
150.00 |
140.00 |
420.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
300   |
LNFT |
2.50 |
750.00 |
3.25 |
975.00 |
|
|
|
|
| 302-02-C-01 |
class ii base course (10" thick)(stone or recycled
pccp) |
1,285.5 |
SQYD |
35.00 |
44,992.50 |
27.00 |
34,708.50 |
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
100.0 |
CUYD |
50.00 |
5,000.00 |
60.00 |
6,000.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
1,612.1 |
TON |
85.00 |
137,028.50 |
98.00 |
157,985.80 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
2,910   |
SQYD |
4.00 |
11,640.00 |
5.00 |
14,550.00 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 60   |
CUYD |
10.00 |
- 600.00 |
10.00 |
- 600.00 |
|
|
|
|
| 701-03-F |
storm drain pipe (15" rcp/pcp)
|
22   |
LNFT |
180.00 |
3,960.00 |
275.00 |
6,050.00 |
|
|
|
|
| 701-04-A |
storm drain pipe arch (15" equiv. rcpa)
|
60   |
LNFT |
200.00 |
12,000.00 |
220.00 |
13,200.00 |
|
|
|
|
| 701-05-F |
side drain pipe (15")
|
68   |
LNFT |
180.00 |
12,240.00 |
200.00 |
13,600.00 |
|
|
|
|
| 701-07-A |
yard drain pipe (4")
|
80   |
LNFT |
60.00 |
4,800.00 |
40.00 |
3,200.00 |
|
|
|
|
| 701-15 |
concrete collar
|
2   |
EACH |
2,000.00 |
4,000.00 |
1,500.00 |
3,000.00 |
|
|
|
|
| 702-02-B |
manholes (r-cb-11)
|
1   |
EACH |
5,000.00 |
5,000.00 |
3,700.00 |
3,700.00 |
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
5,500.00 |
11,000.00 |
3,100.00 |
6,200.00 |
|
|
|
|
| 702-04-B |
adjusting catch basins
|
1   |
EACH |
750.00 |
750.00 |
600.00 |
600.00 |
|
|
|
|
| 706-01-A |
concrete walk (4" thick)
|
276.7 |
SQYD |
70.00 |
19,369.00 |
55.00 |
15,218.50 |
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
224.7 |
SQYD |
75.00 |
16,852.50 |
67.00 |
15,054.90 |
|
|
|
|
| 707-01 |
concrete curb
|
850.1 |
LNFT |
32.00 |
27,203.20 |
30.00 |
25,503.00 |
|
|
|
|
| 708-01 |
right-of-way monument
|
5   |
EACH |
1,200.00 |
6,000.00 |
160.00 |
800.00 |
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
5   |
EACH |
220.00 |
1,100.00 |
160.00 |
800.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
125,000.00 |
125,000.00 |
28,000.00 |
28,000.00 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
0.077 |
MILE |
400.00 |
30.80 |
11,000.00 |
847.00 |
|
|
|
|
| 713-04-A-01 |
temporary pvmt. markings (broken line)(4" w)(4' l)
(type i removable) |
0.025 |
MILE |
3,000.00 |
75.00 |
27,000.00 |
675.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
3.550 |
MILE |
800.00 |
2,840.00 |
950.00 |
3,372.50 |
|
|
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
1.775 |
MILE |
10,000.00 |
17,750.00 |
18,000.00 |
31,950.00 |
|
|
|
|
| 713-05-C-01 |
temporary pavement markings (solid line)(8" width)
(type i removable) |
0.025 |
MILE |
30,000.00 |
750.00 |
45,000.00 |
1,125.00 |
|
|
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
26   |
EACH |
50.00 |
1,300.00 |
57.00 |
1,482.00 |
|
|
|
|
| 715-01 |
topsoil
|
370   |
CUYD |
30.00 |
11,100.00 |
23.00 |
8,510.00 |
|
|
|
|
| 724-02-A |
pavement widening (6" thick)
|
281.5 |
SQYD |
50.00 |
14,075.00 |
51.00 |
14,356.50 |
|
|
|
|
| 724-02-B |
pavement widening (10" thick)
|
1,285.5 |
SQYD |
55.00 |
70,702.50 |
57.00 |
73,273.50 |
|
|
|
|
| 725-02 |
temporary detour roads
|
930.3 |
SQYD |
50.00 |
46,515.00 |
43.00 |
40,002.90 |
|
|
|
|
| 726-01 |
bedding material
|
21.4 |
CUYD |
100.00 |
2,140.00 |
67.00 |
1,433.80 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
85,000.00 |
85,000.00 |
145,000.00 |
145,000.00 |
|
|
|
|
| 729-01 |
sign (type a)
|
116.0 |
SQFT |
20.00 |
2,320.00 |
23.00 |
2,668.00 |
|
|
|
|
| 729-21 |
u-channel post
|
30   |
EACH |
85.00 |
2,550.00 |
98.00 |
2,940.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
10   |
EACH |
7.00 |
70.00 |
7.00 |
70.00 |
|
|
|
|
| 732-01-A |
plastic pavement striping (broken line)(4" width)
|
128   |
LNFT |
0.65 |
83.20 |
0.65 |
83.20 |
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
60   |
LNFT |
1.25 |
75.00 |
1.30 |
78.00 |
|
|
|
|
| 732-01-D |
plastic pavement striping (12" width)
|
550   |
LNFT |
2.00 |
1,100.00 |
2.00 |
1,100.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.750 |
MILE |
3,000.00 |
2,250.00 |
3,000.00 |
2,250.00 |
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
4   |
EACH |
200.00 |
800.00 |
175.00 |
700.00 |
|
|
|
|
| 739-01 |
hydro-seeding
|
0.50 |
ACRE |
2,000.00 |
1,000.00 |
2,300.00 |
1,150.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
15,000.00 |
15,000.00 |
15,000.00 |
15,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
5,000.00 |
5,000.00 |
7,000.00 |
7,000.00 |
|
|
|
|
| S-001 |
metal bollards
|
55   |
EACH |
500.00 |
27,500.00 |
500.00 |
27,500.00 |
|
|
|
|
| S-002 |
incidental concrete paving (11.5" average thickness
with special concrete applications) |
478.0 |
SQYD |
150.00 |
71,700.00 |
153.00 |
73,134.00 |
|
|
|
|
| S-003 |
saw cutting of portland cement concrete pavement
and/or asphaltic concrete pavement (full depth) |
135   |
LNFT |
15.00 |
2,025.00 |
16.00 |
2,160.00 |
|
|
|
|
| S-004 |
detectable warning tiles
|
150   |
LNFT |
35.00 |
5,250.00 |
69.00 |
10,350.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
872,220.20 |
|
879,760.10 |
|
|
|
|
|