Lead Project: 258-33-0005
Parish: E BATON ROUGE
Routes: LA 1248
Description: HIGHLAND RD. - I-10
Type Const: portland cement concrete pavement patching
Estimated Construction Cost: $300,373.50
 
RankLicenseBidderConstruction Bid
1 21982 FORBY CONTRACTING, INC. $313,225.00
2 24901 HARD ROCK CONSTRUCTION CO. $474,200.00
 45210 CERES ENVIRONMENTAL SERVICES,INC. IRREGULAR
 
Item Number Item Description Quantity Unit of Measure - 1 -
FORBY CONTRACTING, INC.
- 2 -
HARD ROCK CONSTRUCTION CO.

CERES ENVIRONMENTAL SERVICES,INC.

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
602-02-A cleaning and resealing existing longitudinal pavement
joints
300      LNFT 2.00 600.00 3.50 1,050.00 16.00 4,800.00    
602-02-B cleaning and resealing existing transverse pavement
joints
300      LNFT 2.00 600.00 3.50 1,050.00 16.00 4,800.00    
602-03 cleaning and sealing random cracks 300      LNFT 3.00 900.00 3.50 1,050.00 16.00 4,800.00    
602-05-G-01 full depth patching of jointed conc pvmt (8" thick)
(16.0 sq yds & under)
575.0    SQYD 165.00 94,875.00 190.00 109,250.00 175.00 100,625.00    
602-05-G-02 full depth patching of jointed conc pvmt (8" thick)
(16.1-48.0 sq yds)
425.0    SQYD 155.00 65,875.00 190.00 80,750.00 175.00 74,375.00    
602-05-G-03 full depth patching of jointed conc pvmt (8" thick)
(48.1 sq yds & over)
675.0    SQYD 145.00 97,875.00 190.00 128,250.00 175.00 118,125.00    
713-01 temporary signs & barricades lump      LUMP 20,000.00 20,000.00 46,000.00 46,000.00 33,000.00 33,000.00    
727-01 mobilization lump      LUMP 22,500.00 22,500.00 100,000.00 100,000.00 54,000.00 54,000.00    
740-01 construction layout lump      LUMP 2,500.00 2,500.00 3,000.00 3,000.00 16,000.00 16,000.00    
S-001 dynamic message sign unit 2      EACH 3,750.00 7,500.00 1,900.00 3,800.00 23.00 46.00    
                       
 CONTRACTOR TOTAL       313,225.00   474,200.00   IRREGULAR    