| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - SPECIALTY CONTRACTORS |
- 2 - SPECIALTY TRACKHOE & DOZER SERV.INC |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
17,000.00 |
17,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
1,000.00 |
1,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| 203-01 |
general excavation
|
6,094   |
CUYD |
8.00 |
48,752.00 |
8.00 |
48,752.00 |
|
|
|
|
| 203-04 |
embankment
|
6,496   |
CUYD |
9.00 |
58,464.00 |
14.00 |
90,944.00 |
|
|
|
|
| 203-09 |
geotextile fabric
|
15,034   |
SQYD |
1.50 |
22,551.00 |
1.50 |
22,551.00 |
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
125.00 |
500.00 |
150.00 |
600.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
440   |
LNFT |
2.50 |
1,100.00 |
2.00 |
880.00 |
|
|
|
|
| 302-02-B |
class ii base course (8 1/2" thick)
|
488.9 |
SQYD |
31.50 |
15,400.35 |
16.00 |
7,822.40 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
16   |
CUYD |
227.00 |
3,632.00 |
100.00 |
1,600.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
89.4 |
TON |
420.00 |
37,548.00 |
120.00 |
10,728.00 |
|
|
|
|
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
48   |
LNFT |
150.00 |
7,200.00 |
160.00 |
7,680.00 |
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
190   |
LNFT |
15.00 |
2,850.00 |
10.00 |
1,900.00 |
|
|
|
|
| 711-01 |
riprap (55 lb.) (18" thick)
|
94   |
SQYD |
50.00 |
4,700.00 |
80.00 |
7,520.00 |
|
|
|
|
| 711-04 |
geotextile fabric
|
94   |
SQYD |
1.50 |
141.00 |
2.00 |
188.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
0.82 |
ACRE |
2,500.00 |
2,050.00 |
4,000.00 |
3,280.00 |
|
|
|
|
| 717-01 |
seeding
|
37   |
LB |
15.00 |
555.00 |
15.00 |
555.00 |
|
|
|
|
| 718-01 |
fertilizer
|
816   |
LB |
0.50 |
408.00 |
1.00 |
816.00 |
|
|
|
|
| 722-01 |
project site laboratory
|
1   |
EACH |
2,000.00 |
2,000.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 726-01 |
bedding material
|
24.6 |
CUYD |
112.00 |
2,755.20 |
80.00 |
1,968.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
3,000.00 |
3,000.00 |
30,000.00 |
30,000.00 |
|
|
|
|
| 729-16-B |
object marker assembly (type 2)
|
2   |
EACH |
150.00 |
300.00 |
150.00 |
300.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
5   |
EACH |
10.00 |
50.00 |
11.00 |
55.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
0.152 |
MILE |
3,500.00 |
532.00 |
4,000.00 |
608.00 |
|
|
|
|
| 735-01 |
mailboxes
|
1   |
EACH |
25.00 |
25.00 |
100.00 |
100.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
1   |
EACH |
175.00 |
175.00 |
200.00 |
200.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
7,500.00 |
7,500.00 |
10,000.00 |
10,000.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
2,000.00 |
2,000.00 |
5,000.00 |
5,000.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
247,188.55 |
|
289,047.40 |
|
|
|
|
|