| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - MADDEN CONTRACTING CO., INC. |
- 2 - BENTON & BROWN, LLC. |
- 3 - BEST-YET BUILDERS, LLC |
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-H |
removal of guard rail
|
808   |
LNFT |
3.75 |
3,030.00 |
4.00 |
3,232.00 |
4.00 |
3,232.00 |
|
|
| 202-02-I |
removal of asphaltic surfacing from bridge decks
|
594   |
SQYD |
0.01 |
5.94 |
1.00 |
594.00 |
10.00 |
5,940.00 |
|
|
| 202-02-J |
removal of maintenance widening
|
1,618   |
SQYD |
3.00 |
4,854.00 |
5.00 |
8,090.00 |
12.00 |
19,416.00 |
|
|
| 203-06 |
excavation and embankment
|
lump |
LUMP |
10,000.00 |
10,000.00 |
8,000.00 |
8,000.00 |
25,000.00 |
25,000.00 |
|
|
| 203-08 |
borrow (vehicular measurement)
|
9,400   |
CUYD |
1.00 |
9,400.00 |
12.50 |
117,500.00 |
20.00 |
188,000.00 |
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
250   |
CUYD |
25.00 |
6,250.00 |
30.00 |
7,500.00 |
50.00 |
12,500.00 |
|
|
| 502-01 |
superpave asphaltic concrete
|
12,149.5 |
TON |
69.50 |
844,390.25 |
75.00 |
911,212.50 |
80.00 |
971,960.00 |
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
1,332.0 |
TON |
20.00 |
26,640.00 |
80.00 |
106,560.00 |
85.00 |
113,220.00 |
|
|
| 509-01-A |
cold planing asphaltic pavement (1/2" average depth)
|
10,457   |
SQYD |
1.00 |
10,457.00 |
0.60 |
6,274.20 |
2.00 |
20,914.00 |
|
|
| 509-01-B |
cold planing asphaltic pavement (8" average depth)
|
850   |
SQYD |
5.00 |
4,250.00 |
5.65 |
4,802.50 |
5.00 |
4,250.00 |
|
|
| 509-01-C |
cold planing asphaltic pavement (1" average depth)
|
26,996   |
SQYD |
1.00 |
26,996.00 |
0.70 |
18,897.20 |
2.00 |
53,992.00 |
|
|
| 509-01-D |
cold planing asphaltic pavement (2" average depth)
|
594   |
SQYD |
1.00 |
594.00 |
2.00 |
1,188.00 |
2.00 |
1,188.00 |
|
|
| 509-01-E |
cold planing asphaltic pavement (3 1/2" average depth)
|
18,429   |
SQYD |
1.90 |
35,015.10 |
2.30 |
42,386.70 |
2.50 |
46,072.50 |
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 2,182   |
CUYD |
0.01 |
- 21.82 |
0.90 |
- 1,963.80 |
0.10 |
- 218.20 |
|
|
| 601-01-G |
portland cement concrete pavement (8" thick)
|
1,352.0 |
SQYD |
95.00 |
128,440.00 |
70.00 |
94,640.00 |
95.00 |
128,440.00 |
|
|
| 701-08 |
relaying pipe
|
4   |
LNFT |
120.00 |
480.00 |
100.00 |
400.00 |
250.00 |
1,000.00 |
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
32   |
LNFT |
140.00 |
4,480.00 |
120.00 |
3,840.00 |
135.00 |
4,320.00 |
|
|
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
16   |
LNFT |
160.00 |
2,560.00 |
130.00 |
2,080.00 |
145.00 |
2,320.00 |
|
|
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
16   |
LNFT |
180.00 |
2,880.00 |
140.00 |
2,240.00 |
160.00 |
2,560.00 |
|
|
| 701-10-O |
reinforced concrete pipe (extension)(48")
|
48   |
LNFT |
200.00 |
9,600.00 |
150.00 |
7,200.00 |
255.00 |
12,240.00 |
|
|
| 701-15 |
concrete collar
|
11   |
EACH |
700.00 |
7,700.00 |
850.00 |
9,350.00 |
1,500.00 |
16,500.00 |
|
|
| 704-01-A |
guard rail (single thrie beam)(3'-1 1/2" post spacing)
|
200.0 |
LNFT |
57.00 |
11,400.00 |
46.00 |
9,200.00 |
55.00 |
11,000.00 |
|
|
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
382.0 |
LNFT |
54.00 |
20,628.00 |
55.00 |
21,010.00 |
45.00 |
17,190.00 |
|
|
| 704-03 |
blocked out guard rail
|
150.0 |
LNFT |
19.00 |
2,850.00 |
25.00 |
3,750.00 |
25.00 |
3,750.00 |
|
|
| 704-11-A |
guard rail end treatment (flared)
|
8   |
EACH |
2,000.00 |
16,000.00 |
2,400.00 |
19,200.00 |
2,450.00 |
19,600.00 |
|
|
| 712-04 |
flexible revetment
|
400   |
SQYD |
70.00 |
28,000.00 |
70.00 |
28,000.00 |
75.00 |
30,000.00 |
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
77,500.00 |
77,500.00 |
58,000.00 |
58,000.00 |
35,000.00 |
35,000.00 |
|
|
| 713-03-C |
temporary pavement markings (8" width)
|
628   |
LNFT |
0.10 |
62.80 |
0.35 |
219.80 |
0.40 |
251.20 |
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
453   |
LNFT |
0.10 |
45.30 |
1.00 |
453.00 |
1.00 |
453.00 |
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
9.407 |
MILE |
325.00 |
3,057.28 |
330.00 |
3,104.31 |
345.00 |
3,245.42 |
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
5.718 |
MILE |
1.00 |
5.72 |
325.00 |
1,858.35 |
425.00 |
2,430.15 |
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
26.502 |
MILE |
1.00 |
26.50 |
655.00 |
17,358.81 |
0.10 |
2.65 |
|
|
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
4   |
EACH |
1.00 |
4.00 |
55.00 |
220.00 |
55.00 |
220.00 |
|
|
| 713-06-C |
temporary pavement legends and symbols (only)
|
4   |
EACH |
1.00 |
4.00 |
55.00 |
220.00 |
55.00 |
220.00 |
|
|
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
4   |
EACH |
1.00 |
4.00 |
100.00 |
400.00 |
125.00 |
500.00 |
|
|
| 716-01-A |
mulch (vegetative)
|
12.50 |
ACRE |
1,400.00 |
17,500.00 |
1,400.00 |
17,500.00 |
850.00 |
10,625.00 |
|
|
| 724-01-A |
pavement patching (6" minimum thickness)
|
2,000   |
SQYD |
40.00 |
80,000.00 |
35.00 |
70,000.00 |
60.00 |
120,000.00 |
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
77,500.00 |
77,500.00 |
60,000.00 |
60,000.00 |
150,000.00 |
150,000.00 |
|
|
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
75.00 |
600.00 |
110.00 |
880.00 |
110.00 |
880.00 |
|
|
| 731-02 |
reflectorized raised pavement markers
|
1,728   |
EACH |
4.50 |
7,776.00 |
6.00 |
10,368.00 |
6.50 |
11,232.00 |
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
355   |
LNFT |
1.00 |
355.00 |
1.00 |
355.00 |
1.10 |
390.50 |
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
234   |
LNFT |
3.00 |
702.00 |
3.50 |
819.00 |
3.45 |
807.30 |
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
13.431 |
MILE |
2,150.00 |
28,876.65 |
2,500.00 |
33,577.50 |
2,400.00 |
32,234.40 |
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
2.859 |
MILE |
700.00 |
2,001.30 |
900.00 |
2,573.10 |
850.00 |
2,430.15 |
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
2   |
EACH |
140.00 |
280.00 |
200.00 |
400.00 |
185.00 |
370.00 |
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
2   |
EACH |
160.00 |
320.00 |
225.00 |
450.00 |
215.00 |
430.00 |
|
|
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
2   |
EACH |
400.00 |
800.00 |
500.00 |
1,000.00 |
495.00 |
990.00 |
|
|
| 735-01 |
mailboxes
|
17   |
EACH |
1.00 |
17.00 |
1.10 |
18.70 |
12.00 |
204.00 |
|
|
| 735-02 |
mailbox supports (single)
|
13   |
EACH |
135.00 |
1,755.00 |
155.00 |
2,015.00 |
135.00 |
1,755.00 |
|
|
| 735-03 |
mailbox supports (double)
|
2   |
EACH |
175.00 |
350.00 |
200.00 |
400.00 |
205.00 |
410.00 |
|
|
| 739-01 |
hydro-seeding
|
12.50 |
ACRE |
1,600.00 |
20,000.00 |
1,700.00 |
21,250.00 |
1,600.00 |
20,000.00 |
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
20,000.00 |
20,000.00 |
6,000.00 |
6,000.00 |
30,000.00 |
30,000.00 |
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
30,000.00 |
30,000.00 |
|
|
| S-001 |
raised asphaltic concrete median (4" thick)
|
22.6 |
SQYD |
20.00 |
452.00 |
110.00 |
2,486.00 |
350.00 |
7,910.00 |
|
|
| S-003 |
dynamic message sign unit
|
5   |
EACH |
2,300.00 |
11,500.00 |
4,500.00 |
22,500.00 |
5,000.00 |
25,000.00 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
1,583,373.02 |
|
1,774,609.87 |
|
2,202,377.07 |
|
|
|