| Lead Project: 075-03-0008 |
| Parish: TENSAS, CALDWELL, FRANKLIN, CATAHOULA |
| Routes: LA 568, LA 844, LA 870, LA 865, LA 3101 |
| Description: DISTRICTWIDE CHIP SEALS |
| Type Const:
asphaltic surface treatment
|
| Estimated Construction Cost: $640,689.80 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - T. L. WALLACE CONSTRUCTION, INC. |
- 2 - DREHER CONTRACTING, INC. |
- 3 - P.R. PARKER COMPANY INC |
- 4 - MISSOURI PETROLEUM PRODUCTS CO. LLC |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 507-01-A |
asphaltic surface treatment (1 application)
|
268,707   |
SQYD |
1.42 |
381,563.94 |
1.43 |
384,251.01 |
1.47 |
394,999.29 |
1.77 |
475,611.39 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
26,000.00 |
26,000.00 |
24,000.00 |
24,000.00 |
24,000.00 |
24,000.00 |
25,000.00 |
25,000.00 |
| 713-07-A |
temporary reflectorized raised pavement markers (tabs)
|
2,875   |
EACH |
1.00 |
2,875.00 |
1.25 |
3,593.75 |
0.90 |
2,587.50 |
1.00 |
2,875.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
10,000.00 |
10,000.00 |
15,000.00 |
15,000.00 |
41,000.00 |
41,000.00 |
26,000.00 |
26,000.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,875   |
EACH |
4.50 |
12,937.50 |
4.50 |
12,937.50 |
4.50 |
12,937.50 |
4.00 |
11,500.00 |
| 732-02-A-03 |
plast pvmt striping(solid line)(4" width)hot appl
thermo (40mil thickness) |
49.118 |
MILE |
900.00 |
44,206.20 |
1,250.00 |
61,397.50 |
900.00 |
44,206.20 |
1,110.00 |
54,520.98 |
| 732-03-A-03 |
plastic pvmt striping(broken line)(4" width) hot appl
thermo (40 mil thick) |
12.190 |
MILE |
370.00 |
4,510.30 |
475.00 |
5,790.25 |
370.00 |
4,510.30 |
400.00 |
4,876.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
10,000.00 |
10,000.00 |
2,500.00 |
2,500.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
492,092.94 |
|
509,470.01 |
|
525,240.79 |
|
601,383.37 |
|