| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARBER BROS. CONTRACTING CO., L.L.C |
- 2 - F.G. SULLIVAN, JR. CONTRACTOR LLC |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - COASTAL BRIDGE CO., L.L.C. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
25,000.00 |
25,000.00 |
5,000.00 |
5,000.00 |
22,000.00 |
22,000.00 |
25,000.00 |
25,000.00 |
| 202-02-D |
removal of concrete walks & drives
|
600   |
SQYD |
26.00 |
15,600.00 |
15.00 |
9,000.00 |
10.00 |
6,000.00 |
20.00 |
12,000.00 |
| 202-02-E |
removal of concrete curbs
|
100.0 |
LNFT |
18.00 |
1,800.00 |
15.00 |
1,500.00 |
10.00 |
1,000.00 |
16.50 |
1,650.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
1,603.1 |
SQYD |
10.00 |
16,031.00 |
15.00 |
24,046.50 |
6.00 |
9,618.60 |
16.50 |
26,451.15 |
| 202-02-H |
removal of guard rail
|
384   |
LNFT |
10.00 |
3,840.00 |
10.00 |
3,840.00 |
10.00 |
3,840.00 |
8.85 |
3,398.40 |
| 202-02-I |
removal of railroad grade crossing
|
3   |
EACH |
5,000.00 |
15,000.00 |
20,000.00 |
60,000.00 |
8,000.00 |
24,000.00 |
10,000.00 |
30,000.00 |
| 202-02-J |
removal of existing headwall and wingwalls
|
1   |
EACH |
1,200.00 |
1,200.00 |
1,500.00 |
1,500.00 |
1,000.00 |
1,000.00 |
1,100.00 |
1,100.00 |
| 202-02-K |
removal of catch basins
|
2   |
EACH |
1,200.00 |
2,400.00 |
1,500.00 |
3,000.00 |
1,000.00 |
2,000.00 |
1,100.00 |
2,200.00 |
| 202-02-L |
removal of manholes
|
2   |
EACH |
1,200.00 |
2,400.00 |
1,500.00 |
3,000.00 |
1,000.00 |
2,000.00 |
1,100.00 |
2,200.00 |
| 203-08 |
borrow (vehicular measurement)
|
13,500   |
CUYD |
12.00 |
162,000.00 |
7.00 |
94,500.00 |
18.00 |
243,000.00 |
5.00 |
67,500.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
10   |
EACH |
120.00 |
1,200.00 |
100.00 |
1,000.00 |
100.00 |
1,000.00 |
170.00 |
1,700.00 |
| 204-06 |
temporary silt fencing
|
1,000   |
LNFT |
2.00 |
2,000.00 |
1.65 |
1,650.00 |
1.60 |
1,600.00 |
1.70 |
1,700.00 |
| 302-02-D-01 |
class ii base course (12" thick)(asphaltic concrete
only) |
2,212.3 |
SQYD |
50.00 |
110,615.00 |
60.00 |
132,738.00 |
60.00 |
132,738.00 |
85.00 |
188,045.50 |
| 308-01-B |
in-place cement treated base course (15" thick)
|
32,029   |
SQYD |
12.00 |
384,348.00 |
25.00 |
800,725.00 |
8.00 |
256,232.00 |
15.00 |
480,435.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
915   |
CUYD |
55.00 |
50,325.00 |
30.00 |
27,450.00 |
45.00 |
41,175.00 |
32.00 |
29,280.00 |
| 502-01 |
superpave asphaltic concrete
|
48,223.2 |
TON |
68.00 |
3,279,177.60 |
65.00 |
3,134,508.00 |
80.00 |
3,857,856.00 |
73.25 |
3,532,349.40 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
3,325.4 |
TON |
90.00 |
299,286.00 |
65.00 |
216,151.00 |
125.00 |
415,675.00 |
95.00 |
315,913.00 |
| 509-01-A |
cold planing asphaltic pavement (1" average depth)
|
159,618   |
SQYD |
1.75 |
279,331.50 |
0.80 |
127,694.40 |
1.25 |
199,522.50 |
2.55 |
407,025.90 |
| 509-01-B |
cold planing asphaltic pavement (3.5" average depth)
|
91,484   |
SQYD |
3.25 |
297,323.00 |
2.50 |
228,710.00 |
1.35 |
123,503.40 |
4.10 |
375,084.40 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 9,996   |
CUYD |
0.00 |
0.00 |
0.01 |
- 99.96 |
0.01 |
- 99.96 |
0.00 |
0.00 |
| 602-02-A |
cleaning and resealing existing longitudinal pavement
joints |
10,000   |
LNFT |
1.90 |
19,000.00 |
2.00 |
20,000.00 |
2.20 |
22,000.00 |
1.25 |
12,500.00 |
| 602-02-B |
cleaning and resealing existing transverse pavement
joints |
2,000   |
LNFT |
2.50 |
5,000.00 |
2.00 |
4,000.00 |
2.70 |
5,400.00 |
1.40 |
2,800.00 |
| 602-03 |
cleaning and sealing random cracks
|
2,000   |
LNFT |
3.25 |
6,500.00 |
2.00 |
4,000.00 |
2.80 |
5,600.00 |
0.60 |
1,200.00 |
| 701-01-I |
cross drain pipe (24" rcp)
|
80   |
LNFT |
160.00 |
12,800.00 |
200.00 |
16,000.00 |
175.00 |
14,000.00 |
150.00 |
12,000.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
94   |
LNFT |
175.00 |
16,450.00 |
220.00 |
20,680.00 |
160.00 |
15,040.00 |
165.00 |
15,510.00 |
| 701-10-K |
reinforced concrete pipe (extension)(30")
|
8   |
LNFT |
190.00 |
1,520.00 |
240.00 |
1,920.00 |
280.00 |
2,240.00 |
180.00 |
1,440.00 |
| 701-10-M |
reinforced concrete pipe (extension)(36")
|
16   |
LNFT |
220.00 |
3,520.00 |
250.00 |
4,000.00 |
200.00 |
3,200.00 |
200.00 |
3,200.00 |
| 701-14 |
cleaning existing pipes
|
532   |
LNFT |
40.00 |
21,280.00 |
40.00 |
21,280.00 |
5.00 |
2,660.00 |
35.00 |
18,620.00 |
| 701-15 |
concrete collar
|
10   |
EACH |
0.00 |
0.00 |
100.00 |
1,000.00 |
1,000.00 |
10,000.00 |
0.00 |
0.00 |
| 702-02-B |
manholes (r-cb-11)
|
2   |
EACH |
4,500.00 |
9,000.00 |
4,000.00 |
8,000.00 |
2,500.00 |
5,000.00 |
4,100.00 |
8,200.00 |
| 702-03-A |
catch basins (cb-01)
|
2   |
EACH |
3,500.00 |
7,000.00 |
4,000.00 |
8,000.00 |
4,000.00 |
8,000.00 |
3,000.00 |
6,000.00 |
| 702-04-A |
adjusting manholes
|
5   |
EACH |
2,000.00 |
10,000.00 |
2,000.00 |
10,000.00 |
1,000.00 |
5,000.00 |
1,900.00 |
9,500.00 |
| 702-04-B |
adjusting catch basins
|
5   |
EACH |
2,500.00 |
12,500.00 |
2,000.00 |
10,000.00 |
1,000.00 |
5,000.00 |
1,900.00 |
9,500.00 |
| 702-07-B |
cross drain safety end (type 2)
|
1   |
EACH |
9,600.00 |
9,600.00 |
10,000.00 |
10,000.00 |
3,000.00 |
3,000.00 |
10,000.00 |
10,000.00 |
| 704-01-B |
guard rail (single thrie beam)(6'-3" post spacing)
|
200.0 |
LNFT |
40.00 |
8,000.00 |
45.00 |
9,000.00 |
40.00 |
8,000.00 |
35.40 |
7,080.00 |
| 704-03 |
blocked out guard rail
|
312.6 |
LNFT |
24.00 |
7,502.40 |
25.00 |
7,815.00 |
20.00 |
6,252.00 |
21.00 |
6,564.60 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
100.0 |
LNFT |
65.00 |
6,500.00 |
60.00 |
6,000.00 |
57.00 |
5,700.00 |
60.00 |
6,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
4   |
EACH |
2,400.00 |
9,600.00 |
2,500.00 |
10,000.00 |
2,200.00 |
8,800.00 |
2,200.00 |
8,800.00 |
| 707-01 |
concrete curb
|
100.0 |
LNFT |
160.00 |
16,000.00 |
40.00 |
4,000.00 |
40.00 |
4,000.00 |
45.00 |
4,500.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
100,000.00 |
100,000.00 |
250,000.00 |
250,000.00 |
20,000.00 |
20,000.00 |
180,000.00 |
180,000.00 |
| 713-03-C |
temporary pavement markings (8" width)
|
630   |
LNFT |
0.50 |
315.00 |
0.15 |
94.50 |
0.40 |
252.00 |
0.25 |
157.50 |
| 713-03-E |
temporary pavement markings (24" width)
|
510   |
LNFT |
1.00 |
510.00 |
0.50 |
255.00 |
1.00 |
510.00 |
0.70 |
357.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
32.520 |
MILE |
300.00 |
9,756.00 |
700.00 |
22,764.00 |
455.00 |
14,796.60 |
380.00 |
12,357.60 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
28.626 |
MILE |
300.00 |
8,587.80 |
10.00 |
286.26 |
400.00 |
11,450.40 |
305.00 |
8,730.93 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
56.242 |
MILE |
300.00 |
16,872.60 |
100.00 |
5,624.20 |
755.00 |
42,462.71 |
635.00 |
35,713.67 |
| 713-06-A |
temporary pavement legends and symbols (arrow)
|
9   |
EACH |
60.00 |
540.00 |
25.00 |
225.00 |
55.00 |
495.00 |
55.25 |
497.25 |
| 713-06-C |
temporary pavement legends and symbols (only)
|
9   |
EACH |
60.00 |
540.00 |
25.00 |
225.00 |
55.00 |
495.00 |
55.25 |
497.25 |
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
12   |
EACH |
250.00 |
3,000.00 |
50.00 |
600.00 |
100.00 |
1,200.00 |
225.00 |
2,700.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
20,000.00 |
20,000.00 |
15,000.00 |
15,000.00 |
25,000.00 |
25,000.00 |
11,000.00 |
11,000.00 |
| 724-01-A |
pavement patching (6" minimum thickness)
|
4,798   |
SQYD |
26.00 |
124,748.00 |
30.00 |
143,940.00 |
62.00 |
297,476.00 |
40.00 |
191,920.00 |
| 724-01-B |
pavement patching (12" minimum thickness)
|
9,922   |
SQYD |
60.00 |
595,320.00 |
60.00 |
595,320.00 |
100.00 |
992,200.00 |
75.00 |
744,150.00 |
| 726-01 |
bedding material
|
50.0 |
CUYD |
70.00 |
3,500.00 |
60.00 |
3,000.00 |
90.00 |
4,500.00 |
66.00 |
3,300.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
520,000.00 |
520,000.00 |
248,000.00 |
248,000.00 |
350,000.00 |
350,000.00 |
400,000.00 |
400,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
20   |
EACH |
60.00 |
1,200.00 |
50.00 |
1,000.00 |
45.00 |
900.00 |
55.00 |
1,100.00 |
| 729-16-C |
object marker assembly (type 3)
|
8   |
EACH |
85.00 |
680.00 |
70.00 |
560.00 |
70.00 |
560.00 |
80.00 |
640.00 |
| 731-02 |
reflectorized raised pavement markers
|
1,467   |
EACH |
6.00 |
8,802.00 |
7.00 |
10,269.00 |
5.00 |
7,335.00 |
5.00 |
7,335.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
210   |
LNFT |
1.25 |
262.50 |
2.00 |
420.00 |
1.00 |
210.00 |
1.15 |
241.50 |
| 732-01-E |
plastic pavement striping (24" width)
|
170   |
LNFT |
4.00 |
680.00 |
4.00 |
680.00 |
3.25 |
552.50 |
3.40 |
578.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
25.974 |
MILE |
2,500.00 |
64,935.00 |
2,700.00 |
70,129.80 |
2,350.00 |
61,038.90 |
2,400.00 |
62,337.60 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
9.542 |
MILE |
800.00 |
7,633.60 |
800.00 |
7,633.60 |
700.00 |
6,679.40 |
775.00 |
7,395.05 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
3   |
EACH |
200.00 |
600.00 |
250.00 |
750.00 |
150.00 |
450.00 |
170.00 |
510.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
3   |
EACH |
250.00 |
750.00 |
250.00 |
750.00 |
200.00 |
600.00 |
170.00 |
510.00 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
4   |
EACH |
500.00 |
2,000.00 |
2,000.00 |
8,000.00 |
450.00 |
1,800.00 |
445.00 |
1,780.00 |
| 735-01 |
mailboxes
|
63   |
EACH |
8.00 |
504.00 |
5.00 |
315.00 |
5.00 |
315.00 |
7.00 |
441.00 |
| 735-02 |
mailbox supports (single)
|
60   |
EACH |
150.00 |
9,000.00 |
120.00 |
7,200.00 |
125.00 |
7,500.00 |
130.00 |
7,800.00 |
| 735-04 |
mailbox supports (multiple)
|
1   |
EACH |
250.00 |
250.00 |
200.00 |
200.00 |
250.00 |
250.00 |
250.00 |
250.00 |
| 736-01 |
trenching and backfilling
|
500   |
LNFT |
4.00 |
2,000.00 |
4.00 |
2,000.00 |
3.00 |
1,500.00 |
3.50 |
1,750.00 |
| 736-02 |
conduit with conductors (1" pec schedule 80)
|
580   |
LNFT |
6.00 |
3,480.00 |
5.00 |
2,900.00 |
5.00 |
2,900.00 |
5.50 |
3,190.00 |
| 736-03 |
jacked or bored conduit (1" pec schedule 80)
|
110   |
LNFT |
6.00 |
660.00 |
5.00 |
550.00 |
5.00 |
550.00 |
5.70 |
627.00 |
| 736-09 |
loop detector
|
66   |
LNFT |
15.00 |
990.00 |
12.00 |
792.00 |
12.00 |
792.00 |
12.20 |
805.20 |
| 736-10 |
underground junction box
|
2   |
EACH |
300.00 |
600.00 |
250.00 |
500.00 |
280.00 |
560.00 |
280.00 |
560.00 |
| 736-12-A |
conductor, 2c (loop lead-in, #14 awg)
|
272   |
LNFT |
2.00 |
544.00 |
2.00 |
544.00 |
2.00 |
544.00 |
2.00 |
544.00 |
| 739-01 |
hydro-seeding
|
12.23 |
ACRE |
1,000.00 |
12,230.00 |
1,000.00 |
12,230.00 |
1,000.00 |
12,230.00 |
1,350.00 |
16,510.50 |
| 740-01 |
construction layout
|
lump |
LUMP |
50,000.00 |
50,000.00 |
155,000.00 |
155,000.00 |
45,000.00 |
45,000.00 |
70,000.00 |
70,000.00 |
| 741-11 |
adjusting water valve and meter box
|
6   |
EACH |
1,200.00 |
7,200.00 |
500.00 |
3,000.00 |
250.00 |
1,500.00 |
1,150.00 |
6,900.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
50,000.00 |
50,000.00 |
175,000.00 |
175,000.00 |
140,000.00 |
140,000.00 |
100,000.00 |
100,000.00 |
| 805-12-F-01 |
reinforced concrete box culverts (5'x 4')
|
8.0 |
LNFT |
660.00 |
5,280.00 |
700.00 |
5,600.00 |
1,700.00 |
13,600.00 |
650.00 |
5,200.00 |
| S-001 |
cleaning and sealing existing headwall joints
|
16   |
LNFT |
300.00 |
4,800.00 |
700.00 |
11,200.00 |
30.00 |
480.00 |
275.00 |
4,400.00 |
| S-002 |
cleaning existing ditches
|
2,200   |
LNFT |
12.00 |
26,400.00 |
15.00 |
33,000.00 |
6.00 |
13,200.00 |
11.00 |
24,200.00 |
| S-003 |
dynamic message sign unit
|
2   |
EACH |
20,000.00 |
40,000.00 |
15,000.00 |
30,000.00 |
20,000.00 |
40,000.00 |
20,000.00 |
40,000.00 |
| S-005 |
rumble strips (ground-in)
|
19.9 |
MILE |
800.00 |
15,920.00 |
850.00 |
16,915.00 |
500.00 |
9,950.00 |
625.00 |
12,437.50 |
| S-006 |
stump removal
|
3   |
EACH |
1,500.00 |
4,500.00 |
1,200.00 |
3,600.00 |
500.00 |
1,500.00 |
3,400.00 |
10,200.00 |
| S-007 |
saw cutting asphaltic concrete patches (12" deep)
|
50,000   |
LNFT |
3.00 |
150,000.00 |
3.25 |
162,500.00 |
2.00 |
100,000.00 |
3.15 |
157,500.00 |
| S-008 |
saw cutting asphaltic concrete patches (6" deep)
|
25,000   |
LNFT |
2.00 |
50,000.00 |
2.50 |
62,500.00 |
1.20 |
30,000.00 |
2.30 |
57,500.00 |
| S-922 |
sawing and sealing longitudinal joints in asphaltic
concrete overlay |
14,418   |
LNFT |
1.80 |
25,952.40 |
2.00 |
28,836.00 |
2.00 |
28,836.00 |
1.70 |
24,510.60 |
| S-923 |
sawing and sealing transverse joints in asphaltic
concrete overlay |
240   |
LNFT |
2.20 |
528.00 |
2.00 |
480.00 |
3.00 |
720.00 |
1.70 |
408.00 |
| S-927 |
sawcuts in asphaltic concrete lifts
|
14,658   |
LNFT |
1.10 |
16,123.80 |
1.00 |
14,658.00 |
0.70 |
10,260.60 |
0.55 |
8,061.90 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
7,098,844.20 |
|
7,166,654.30 |
|
7,785,703.65 |
|
7,874,051.40 |
|