Letting of 3/28/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 023-04-0017
Parish: WINN
Routes: US 167
Description: GRANT PARISH LINE - WINNFIELD
Type Const: grading, drainage structures, lime treatment, class ii base course, superpave asphaltic
concrete pavement, concrete girder bridge, concrete slab span bridge & related work.
Estimated Construction Cost: $27,573,516.62
Maximum Number of Days Allowed for Construction: 690
Calculated Daily User Cost: $3,650.00
 
RankLicenseBidderConstruction Bid Bidder's Proposed
Contract Time
Total Bid
1 12312 GILCHRIST CONSTRUCTION CO. LLC $27,961,357.89 675 $30,425,107.89
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $28,958,356.98 690 $31,476,856.98
3 39462 DENTON-JAMES LLC $28,980,181.30 690 $31,498,681.30
4 05789 D & J CONSTRUCTION CO., INC. $29,607,468.35 690 $32,125,968.35
5 42076 AUSTIN BRIDGE & ROAD, LP $31,330,983.41 690 $33,849,483.41
 
Item Number Item Description Quantity Unit of Measure - 1 -
GILCHRIST CONSTRUCTION CO. LLC
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.
- 3 -
DENTON-JAMES LLC
- 4 -
D & J CONSTRUCTION CO., INC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 550,000.00 550,000.00 400,000.00 400,000.00 900,000.00 900,000.00 750,000.00 750,000.00
202-01 removal of structures & obstructions lump      LUMP 95,000.00 95,000.00 100,000.00 100,000.00 200,000.00 200,000.00 100,000.00 100,000.00
202-02-B-01 removal of concrete box culverts (sta. 144+67; 2-6' x
6' x 45')
1      EACH 8,000.00 8,000.00 14,000.00 14,000.00 7,000.00 7,000.00 7,500.00 7,500.00
202-02-B-02 removal of concrete box culverts (sta. 263+25; 6' x 6'
x 60')
1      EACH 4,000.00 4,000.00 10,000.00 10,000.00 5,000.00 5,000.00 5,000.00 5,000.00
202-02-B-03 removal of concrete box culverts (sta. 270+81; 2-4.5'
x 4.5' x 54')
1      EACH 8,000.00 8,000.00 15,000.00 15,000.00 5,000.00 5,000.00 7,500.00 7,500.00
202-02-B-04 removal of concrete box culverts (sta. 348+32; 2-6' x
6' x 51')
1      EACH 4,000.00 4,000.00 18,000.00 18,000.00 5,000.00 5,000.00 7,500.00 7,500.00
202-02-C removal of portland cement concrete pavement 4,582      SQYD 6.00 27,492.00 4.50 20,619.00 5.00 22,910.00 6.00 27,492.00
202-02-D removal of concrete walks & drives 890      SQYD 10.00 8,900.00 7.00 6,230.00 10.00 8,900.00 11.00 9,790.00
202-02-G removal of surfacing & stabilized base 16,711.8    SQYD 4.25 71,025.15 6.00 100,270.80 4.50 75,203.10 3.50 58,491.30
202-02-H removal of guard rail 531      LNFT 12.00 6,372.00 7.00 3,717.00 6.00 3,186.00 5.00 2,655.00
202-02-01 removal of 47.5' x 43.2' wood frame residence on piers
(rt. of sta. 119+70)
1      EACH 4,500.00 4,500.00 4,000.00 4,000.00 1.00 1.00 1.00 1.00
202-02-02 removal of kisatchie national forest sign (lt. of sta.
211+90)
1      EACH 1,500.00 1,500.00 30.00 30.00 1.00 1.00 1.00 1.00
202-02-03 removal of 24.7' x 14.9' wood frame residence (rt. of
sta. 251+36)
1      EACH 2,000.00 2,000.00 4,000.00 4,000.00 1.00 1.00 1.00 1.00
202-02-04 removal of shed (lt. of sta. 255+00) 1      EACH 800.00 800.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-05 removal of barn (lt. of sta. 255+00) 1      EACH 1,000.00 1,000.00 2,500.00 2,500.00 1.00 1.00 1.00 1.00
202-02-06 removal of 20.4' x 66.6' wood frame residence (lt. of
sta. 256+09)
1      EACH 3,200.00 3,200.00 3,500.00 3,500.00 1.00 1.00 1.00 1.00
202-02-07 removal of 60.7' x 25.2' wood frame residence on piers
(lt. of sta. 297+93)
1      EACH 3,500.00 3,500.00 3,500.00 3,500.00 1.00 1.00 1.00 1.00
202-02-08 removal of 23.5' x 28.0' wood frame workshop on slab
(lt. of sta. 298+14)
1      EACH 1,200.00 1,200.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-09 removal of 14.4' x 18.3' shed (lt. of sta. 298+17) 1      EACH 800.00 800.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-10 removal of 52.6' x 24.4' wood frame residence on piers
(lt. of sta. 328+32) (contains friable &
non-friable asbestos)
1      EACH 3,200.00 3,200.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-11 removal of 25.0' x 12.0' tin barn (lt. of sta. 333+25) 1      EACH 1,600.00 1,600.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-12 removal of 38.0' x 33.8' metal barn (lt. of sta.
359+12)
1      EACH 3,100.00 3,100.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-13 removal of 25.9' x 40.7' metal building and carport
(lt. of sta. 361+01)
1      EACH 3,200.00 3,200.00 1,200.00 1,200.00 1.00 1.00 1.00 1.00
202-02-14 removal of 26.4' x 42.5' tin shed (lt. of sta. 368+00) 1      EACH 2,000.00 2,000.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-15 removal of 26.8' x 22.4' tin shed (lt. of sta. 368+53) 1      EACH 1,700.00 1,700.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-16 removal of 11.6' x 60.5' trailer and deck (lt. of sta.
369+11)
1      EACH 2,400.00 2,400.00 4,000.00 4,000.00 1.00 1.00 1.00 1.00
202-02-17 removal of 8.3' x 16.3' shed (lt. of sta. 369+36) 1      EACH 700.00 700.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-18 removal of 7.2' x 5.9' wood shed (lt. of sta. 370+41) 1      EACH 650.00 650.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-19 removal of 29.7' x 66.1' brick residence on concrete
slab (lt. of sta. 371+36.50)(contains non-friable
asbestos)
1      EACH 4,700.00 4,700.00 4,000.00 4,000.00 1.00 1.00 1.00 1.00
202-02-20 removal of 19.4' x 23.3' wood frame shed (lt. of sta.
372+33)
1      EACH 1,000.00 1,000.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-21 removal of 7.8' x 16.1' metal building (lt. of sta.
372+83)
1      EACH 1,600.00 1,600.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-22 removal of 11.9' x 20.1' wood shed (rt. of sta.
377+82.50)
1      EACH 1,300.00 1,300.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-23 removal of 33.0' x 42.4' wood frame barn (lt. of sta.
378+00)
1      EACH 3,200.00 3,200.00 1,200.00 1,200.00 1.00 1.00 1.00 1.00
202-02-24 removal of 23.9' x 38.6' wood frame residence (lt. of
sta. 379+07) (contains non-friable asbestos)
1      EACH 2,700.00 2,700.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-25 removal of 10.5' x 15.9' wood shed (lt. of sta. 379+00) 1      EACH 1,500.00 1,500.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-26 removal of 24.1' x 51.9' wood framae residence on
piers (lt. of sta. 381+62)(contains non-friable
asbestos)
1      EACH 3,100.00 3,100.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-27 removal of 15.0' x 26.4' shed (lt. of sta. 381+66) 1      EACH 1,700.00 1,700.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-28 removal of 20.0' x 35.6' wood frame residence (lt. of
sta. 383+04)
1      EACH 2,400.00 2,400.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-29 removal of 14.3' x 16.9' shed (lt. of sta. 384+88) 1      EACH 1,700.00 1,700.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-30 removal of 10.0' x 20.0' deck (lt. of sta. 385+07) 1      EACH 700.00 700.00 400.00 400.00 1.00 1.00 1.00 1.00
202-02-31 removal of 14.7' x 19.0' canopy (lt. of sta. 385+13) 1      EACH 1,000.00 1,000.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-32 removal of 23.0' x 30.0' metal shed (lt. of sta.
401+39)
1      EACH 1,200.00 1,200.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-33 removal of 41.7' x 100.2' metal building (lt. of sta.
403+25.50)
1      EACH 7,600.00 7,600.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
202-02-34 removal of 34.5' x 61.1' wood frame residence on slab
(lt. of sta. 421+12)
1      EACH 4,500.00 4,500.00 3,500.00 3,500.00 1.00 1.00 1.00 1.00
202-02-35 removal of 20.3' x 20.9' wood shed with tin roof (lt.
of sta. 421+29)
1      EACH 1,400.00 1,400.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-36 removal of 17.6' x 37.3' wood shed with tin roof (lt.
of sta. 421+63.50)
1      EACH 1,400.00 1,400.00 600.00 600.00 1.00 1.00 1.00 1.00
202-02-37 removal of 30.1' x 41.1' metal building on slab (lt.
of sta. 426+02)
1      EACH 1,300.00 1,300.00 3,000.00 3,000.00 1.00 1.00 1.00 1.00
203-01 general excavation 546,192      CUYD 3.60 1,966,291.20 3.75 2,048,220.00 3.60 1,966,291.20 4.00 2,184,768.00
203-02 drainage excavation 1,393      CUYD 13.25 18,457.25 10.00 13,930.00 12.00 16,716.00 8.00 11,144.00
203-03 muck excavation 3,675      CUYD 15.00 55,125.00 10.00 36,750.00 12.00 44,100.00 12.00 44,100.00
203-04 embankment 742,075      CUYD 6.70 4,971,902.50 6.00 4,452,450.00 6.50 4,823,487.50 7.00 5,194,525.00
203-05 nonplastic embankment 143      CUYD 180.00 25,740.00 100.00 14,300.00 200.00 28,600.00 100.00 14,300.00
203-09 geotextile fabric 922      SQYD 4.00 3,688.00 2.00 1,844.00 2.00 1,844.00 2.50 2,305.00
204-02 temporary hay or straw bales 238      EACH 20.00 4,760.00 20.00 4,760.00 9.50 2,261.00 12.00 2,856.00
204-03 temporary slope drains 1,604      LNFT 15.00 24,060.00 20.00 32,080.00 10.00 16,040.00 8.00 12,832.00
204-05-A temporary sediment check dams (hay) 735      EACH 130.00 95,550.00 200.00 147,000.00 100.00 73,500.00 110.00 80,850.00
204-05-B temporary sediment check dams (stone) 284      EACH 640.00 181,760.00 600.00 170,400.00 600.00 170,400.00 325.00 92,300.00
204-06 temporary silt fencing 80,000      LNFT 1.60 128,000.00 3.50 280,000.00 1.40 112,000.00 2.00 160,000.00
302-02-B-01 class ii base course (8 1/2" thick)(stone or recycled
pccp)
6,801.8    SQYD 28.00 190,450.40 25.00 170,045.00 27.00 183,648.60 30.00 204,054.00
302-02-E-01 class ii base course (4" thick)(stone or recycled pccp) 195,664.8    SQYD 11.00 2,152,312.80 10.75 2,103,396.60 12.00 2,347,977.60 10.00 1,956,648.00
302-02-F-01 class ii base course (8" thick)(soil cement) 173,875.6    SQYD 9.00 1,564,880.40 10.50 1,825,693.80 9.50 1,651,818.20 10.00 1,738,756.00
304-01 lime 1,231.94   TON 0.01 12.32 1.00 1,231.94 125.00 153,992.50 75.00 92,395.50
304-04-D lime treatment (type d) (12" thick) 86,909      SQYD 0.01 869.09 1.00 86,909.00 1.00 86,909.00 0.50 43,454.50
401-01 aggregate surface course (net section) 5,102.1    CUYD 90.00 459,189.00 80.00 408,168.00 60.00 306,126.00 95.00 484,699.50
401-02 aggregate surface course (adjusted vehicular
measurement)
362      CUYD 94.00 34,028.00 85.00 30,770.00 55.00 19,910.00 135.00 48,870.00
402-01 traffic maintenance aggregate (vehicular measurement) 2,000.0    CUYD 65.00 130,000.00 70.00 140,000.00 70.00 140,000.00 75.00 150,000.00
502-01 superpave asphaltic concrete 37,949.0    TON 78.50 2,978,996.50 80.00 3,035,920.00 84.00 3,187,716.00 82.00 3,111,818.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
7,350.5    TON 105.00 771,802.50 120.00 882,060.00 130.00 955,565.00 95.00 698,297.50
701-01-I cross drain pipe (24" rcp/pcp) 1,332      LNFT 90.00 119,880.00 90.00 119,880.00 80.00 106,560.00 70.00 93,240.00
701-01-M cross drain pipe (36" rcp/pcp) 76      LNFT 145.00 11,020.00 135.00 10,260.00 120.00 9,120.00 125.00 9,500.00
701-01-N cross drain pipe (42" rcp/pcp) 228      LNFT 165.00 37,620.00 205.00 46,740.00 160.00 36,480.00 185.00 42,180.00
701-01-O-01 cross drain pipe (48" rcp)(class v) 460      LNFT 200.00 92,000.00 275.00 126,500.00 200.00 92,000.00 235.00 108,100.00
701-01-S-01 cross drain pipe (72" rcp)(class iv) 400      LNFT 370.00 148,000.00 440.00 176,000.00 400.00 160,000.00 305.00 122,000.00
701-01-U cross drain pipe (84" rcp/pcp) 280      LNFT 420.00 117,600.00 525.00 147,000.00 450.00 126,000.00 455.00 127,400.00
701-02-F cross drain pipe arch (36" equiv. rcpa) 172      LNFT 170.00 29,240.00 160.00 27,520.00 160.00 27,520.00 155.00 26,660.00
701-02-N cross drain pipe arch (84" equiv. rcpa) 400      LNFT 440.00 176,000.00 575.00 230,000.00 500.00 200,000.00 455.00 182,000.00
701-03-G storm drain pipe (18" rcp/pcp) 376      LNFT 65.00 24,440.00 85.00 31,960.00 45.00 16,920.00 50.00 18,800.00
701-03-I storm drain pipe (24" rcp/pcp) 2,372      LNFT 80.00 189,760.00 100.00 237,200.00 70.00 166,040.00 65.00 154,180.00
701-03-K storm drain pipe (30" rcp/pcp) 88      LNFT 95.00 8,360.00 115.00 10,120.00 75.00 6,600.00 80.00 7,040.00
701-05-G side drain pipe (18") 1,064      LNFT 45.00 47,880.00 75.00 79,800.00 40.00 42,560.00 55.00 58,520.00
701-05-I side drain pipe (24") 292      LNFT 60.00 17,520.00 90.00 26,280.00 50.00 14,600.00 70.00 20,440.00
701-05-I-01 side drain pipe (24")(erosion or bridge drain) 148      LNFT 80.00 11,840.00 90.00 13,320.00 60.00 8,880.00 70.00 10,360.00
701-05-K side drain pipe (30") 132      LNFT 78.00 10,296.00 110.00 14,520.00 60.00 7,920.00 85.00 11,220.00
701-10-I reinforced concrete pipe (extension)(24") 22      LNFT 135.00 2,970.00 125.00 2,750.00 220.00 4,840.00 85.00 1,870.00
702-02-B manholes (r-cb-11) 1      EACH 3,200.00 3,200.00 4,100.00 4,100.00 5,000.00 5,000.00 4,200.00 4,200.00
702-02-G manholes (r-cb-38) 3      EACH 6,000.00 18,000.00 9,000.00 27,000.00 10,000.00 30,000.00 5,200.00 15,600.00
702-03-A catch basins (cb-01) 35      EACH 2,500.00 87,500.00 4,500.00 157,500.00 2,500.00 87,500.00 3,200.00 112,000.00
702-03-B catch basins (cb-02) 1      EACH 3,000.00 3,000.00 4,500.00 4,500.00 3,500.00 3,500.00 3,700.00 3,700.00
702-07-B cross drain safety end (type 2) 1      EACH 8,000.00 8,000.00 6,000.00 6,000.00 4,000.00 4,000.00 2,700.00 2,700.00
702-08-A side drain safety end (type 1) 1      EACH 3,000.00 3,000.00 2,800.00 2,800.00 1,000.00 1,000.00 1,800.00 1,800.00
704-03 blocked out guard rail 1,043.8    LNFT 21.00 21,919.80 20.00 20,876.00 18.00 18,788.40 19.00 19,832.20
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 63.00 12,600.00 55.00 11,000.00 50.00 10,000.00 55.00 11,000.00
704-11-A guard rail end treatment (flared) 6      EACH 2,300.00 13,800.00 2,200.00 13,200.00 2,000.00 12,000.00 2,000.00 12,000.00
704-11-B guard rail end treatment (tangent) 2      EACH 2,700.00 5,400.00 3,000.00 6,000.00 2,500.00 5,000.00 2,300.00 4,600.00
705-01 barbed wire fence 4,125      LNFT 6.00 24,750.00 6.00 24,750.00 5.50 22,687.50 5.00 20,625.00
705-02 combination mesh & barbed wire fence 4,581      LNFT 6.80 31,150.80 6.00 27,486.00 6.00 27,486.00 5.50 25,195.50
705-04 single swinging driveway gates 3      EACH 585.00 1,755.00 450.00 1,350.00 500.00 1,500.00 450.00 1,350.00
705-06-A chain link fence (4-foot height) 243      LNFT 21.00 5,103.00 17.00 4,131.00 20.00 4,860.00 16.00 3,888.00
705-06-B chain link fence (5-foot height) 336      LNFT 23.00 7,728.00 18.00 6,048.00 22.00 7,392.00 16.00 5,376.00
705-07-A 12-foot single gates for chain link fence (4-foot
height)
1      EACH 1,200.00 1,200.00 1,100.00 1,100.00 1,000.00 1,000.00 1,000.00 1,000.00
706-02-C concrete drive (6" thick) 304.0    SQYD 85.00 25,840.00 65.00 19,760.00 65.00 19,760.00 50.00 15,200.00
708-01 right-of-way monument 109      EACH 400.00 43,600.00 100.00 10,900.00 120.00 13,080.00 200.00 21,800.00
708-02 right-of-way monument witness post 109      EACH 400.00 43,600.00 100.00 10,900.00 120.00 13,080.00 120.00 13,080.00
711-01-B riprap (10 lb, 12" thick) 3,738      SQYD 55.00 205,590.00 80.00 299,040.00 45.00 168,210.00 70.00 261,660.00
711-01-D riprap (55 lb, 24" thick) 658      SQYD 110.00 72,380.00 85.00 55,930.00 75.00 49,350.00 70.00 46,060.00
711-01-E riprap (130 lb, 36" thick) 206      SQYD 140.00 28,840.00 125.00 25,750.00 120.00 24,720.00 90.00 18,540.00
712-01-A concrete cast-in-place revetment (4" thick) 19,971      SQYD 62.00 1,238,202.00 50.00 998,550.00 42.00 838,782.00 45.00 898,695.00
712-01-C concrete cast-in-place revetment (6" thick) 396      SQYD 75.00 29,700.00 60.00 23,760.00 90.00 35,640.00 55.00 21,780.00
712-04 flexible revetment 492      SQYD 60.00 29,520.00 60.00 29,520.00 45.00 22,140.00 60.00 29,520.00
713-01 temporary signs & barricades lump      LUMP 250,000.00 250,000.00 250,000.00 250,000.00 300,000.00 300,000.00 1,225,000.00 1,225,000.00
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.307  MILE 540.00 3,405.78 330.00 2,081.31 300.00 1,892.10 250.00 1,576.75
713-05-A temporary pavement markings (solid line)(4" width) 27.923  MILE 900.00 25,130.70 650.00 18,149.95 600.00 16,753.80 500.00 13,961.50
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type i removable)
0.250  MILE 17,600.00 4,400.00 14,500.00 3,625.00 13,000.00 3,250.00 8,000.00 2,000.00
713-07 temporary reflectorized raised pavement markers 2,354      EACH 1.40 3,295.60 0.42 988.68 4.00 9,416.00 3.50 8,239.00
713-08 temporary precast concrete barrier (contractor
furnished)
26      EACH 1,200.00 31,200.00 900.00 23,400.00 1,200.00 31,200.00 1,200.00 31,200.00
716-01-A mulch (vegetative) 121.20   ACRE 800.00 96,960.00 750.00 90,900.00 700.00 84,840.00 675.00 81,810.00
717-01 seeding 7,272      LB 8.00 58,176.00 8.00 58,176.00 7.00 50,904.00 7.20 52,358.40
718-01 fertilizer 121,200      LB 0.30 36,360.00 0.35 42,420.00 0.25 30,300.00 0.34 41,208.00
720-01-A erosion control system, slope protection (type a) 68,238      SQYD 1.20 81,885.60 1.20 81,885.60 1.00 68,238.00 1.10 75,061.80
720-01-C erosion control system, flexible channel liner (type c) 13,197      SQYD 1.85 24,414.45 1.50 19,795.50 1.60 21,115.20 1.50 19,795.50
720-01-D erosion control system, flexible channel liner (type d) 22,914      SQYD 2.25 51,556.50 1.50 34,371.00 2.00 45,828.00 1.50 34,371.00
720-01-E erosion control system, flexible channel liner (type e) 3,818      SQYD 3.00 11,454.00 3.50 13,363.00 2.50 9,545.00 3.10 11,835.80
720-01-F erosion control system, flexible channel liner (type f) 1,904      SQYD 3.30 6,283.20 3.50 6,664.00 3.00 5,712.00 3.10 5,902.40
722-02 project site laboratory (equipped) 1      EACH 120,000.00 120,000.00 50,000.00 50,000.00 60,000.00 60,000.00 35,000.00 35,000.00
724-01-C pavement patching (17" minimium thickness) 1,187      SQYD 90.00 106,830.00 90.00 106,830.00 80.00 94,960.00 100.00 118,700.00
725-01 temporary detour roads 322.5    LNFT 190.00 61,275.00 150.00 48,375.00 250.00 80,625.00 125.00 40,312.50
726-01 bedding material 2,869.3    CUYD 95.00 272,583.50 85.00 243,890.50 75.00 215,197.50 80.00 229,544.00
727-01 mobilization lump      LUMP 2,600,000.00 2,600,000.00 2,750,000.00 2,750,000.00 2,700,000.00 2,700,000.00 2,800,000.00 2,800,000.00
729-16-C object marker assembly (type 3) 6      EACH 85.00 510.00 88.00 528.00 80.00 480.00 75.00 450.00
729-19-B dead end road installations(type b) 1      EACH 1,400.00 1,400.00 825.00 825.00 750.00 750.00 1,200.00 1,200.00
731-01 nonreflectorized raised pavement markers 528      EACH 14.50 7,656.00 11.00 5,808.00 10.00 5,280.00 12.50 6,600.00
731-02 reflectorized raised pavement markers 2,771      EACH 5.75 15,933.25 5.50 15,240.50 5.00 13,855.00 5.00 13,855.00
732-01-C plastic pavement striping (8" width) 3,219      LNFT 0.95 3,058.05 1.20 3,862.80 1.00 3,219.00 5.00 16,095.00
732-01-E plastic pavement striping (24" width) 879      LNFT 4.20 3,691.80 3.50 3,076.50 3.00 2,637.00 6.00 5,274.00
732-02-A plastic pavement striping (solid line) (4" width) 31.921  MILE 2,700.00 86,186.70 2,500.00 79,802.50 2,200.00 70,226.20 2,000.00 63,842.00
732-03-A plastic pavement striping (broken line)(4" width) 13.812  MILE 1,100.00 15,193.20 750.00 10,359.00 700.00 9,668.40 1,000.00 13,812.00
732-04-A plastic pavement legends & symbols (arrow) 11      EACH 225.00 2,475.00 175.00 1,925.00 150.00 1,650.00 550.00 6,050.00
732-04-C plastic pavement legends & symbols (only) 11      EACH 255.00 2,805.00 175.00 1,925.00 150.00 1,650.00 550.00 6,050.00
732-05-A removal of existing markings (water blasting) 7.000  MILE 6,500.00 45,500.00 8,500.00 59,500.00 7,500.00 52,500.00 15,000.00 105,000.00
735-01 mailboxes 12      EACH 12.00 144.00 10.00 120.00 1.00 12.00 25.00 300.00
735-02 mailbox supports (single) 10      EACH 180.00 1,800.00 200.00 2,000.00 170.00 1,700.00 175.00 1,750.00
735-03 mailbox supports (double) 1      EACH 235.00 235.00 225.00 225.00 200.00 200.00 200.00 200.00
739-01-A hydro-seeding (u.s forest service) 32.60   ACRE 1,300.00 42,380.00 1,000.00 32,600.00 1,000.00 32,600.00 925.00 30,155.00
740-01 construction layout lump      LUMP 300,000.00 300,000.00 300,000.00 300,000.00 500,000.00 500,000.00 475,000.00 475,000.00
740-02 utility oversight and coordination lump      LUMP 40,000.00 40,000.00 40,000.00 40,000.00 80,000.00 80,000.00 75,000.00 75,000.00
744-01 traffic control management lump      LUMP 130,000.00 130,000.00 100,000.00 100,000.00 60,000.00 60,000.00 73,000.00 73,000.00
804-01-B precast concrete piles (14") 400      LNFT 46.00 18,400.00 62.00 24,800.00 90.00 36,000.00 56.00 22,400.00
804-01-C precast concrete piles (16") 2,148      LNFT 47.00 100,956.00 50.00 107,400.00 106.00 227,688.00 47.00 100,956.00
804-01-F precast concrete piles (24") 2,140      LNFT 85.00 181,900.00 130.00 278,200.00 140.00 299,600.00 116.00 248,240.00
804-01-G precast concrete piles (30") 1,320      LNFT 112.00 147,840.00 210.00 277,200.00 180.00 237,600.00 200.00 264,000.00
804-05 precast concrete test piles 2      EACH 12,000.00 24,000.00 17,000.00 34,000.00 40,000.00 80,000.00 15,000.00 30,000.00
804-09 loading test piles 2      EACH 10,000.00 20,000.00 100.00 200.00 14,000.00 28,000.00 16,000.00 32,000.00
804-10 reloading test piles 2      EACH 100.00 200.00 100.00 200.00 1,000.00 2,000.00 1,000.00 2,000.00
804-11 redriving test piles 2      EACH 100.00 200.00 100.00 200.00 1,000.00 2,000.00 3,000.00 6,000.00
804-12 loading permanent piles 2      EACH 100.00 200.00 100.00 200.00 1,000.00 2,000.00 16,000.00 32,000.00
804-17 dynamic monitoring 6      EACH 1,200.00 7,200.00 3,500.00 21,000.00 1,000.00 6,000.00 3,200.00 19,200.00
805-01-B class a concrete (box culvert headwalls) 59.11   CUYD 1,600.00 94,576.00 1,600.00 94,576.00 1,200.00 70,932.00 1,000.00 59,110.00
805-01-F class a concrete (bents) 477.81   CUYD 720.00 344,023.20 800.00 382,248.00 850.00 406,138.50 725.00 346,412.25
805-03 class aa concrete 1,045.80   CUYD 750.00 784,350.00 750.00 784,350.00 750.00 784,350.00 650.00 679,770.00
805-08-D precast-prestressed concrete girders (type iv) 4,315.0    LNFT 130.00 560,950.00 175.00 755,125.00 170.00 733,550.00 160.00 690,400.00
805-11 strip seal joints 248.92   LNFT 150.00 37,338.00 200.00 49,784.00 150.00 37,338.00 165.00 41,071.80
805-12-E reinforced concrete box culverts (4'x 4') 156.0    LNFT 360.00 56,160.00 600.00 93,600.00 270.00 42,120.00 400.00 62,400.00
805-12-E-01 reinforced concrete box culverts (4'x 4')(extension) 330.0    LNFT 340.00 112,200.00 700.00 231,000.00 300.00 99,000.00 400.00 132,000.00
805-12-F reinforced concrete box culverts (5'x 4') 615.0    LNFT 400.00 246,000.00 625.00 384,375.00 350.00 215,250.00 400.00 246,000.00
805-12-M reinforced concrete box culverts (6'x 6') 406.0    LNFT 575.00 233,450.00 675.00 274,050.00 500.00 203,000.00 500.00 203,000.00
806-01 deformed reinforcing steel 326,784      LB 0.85 277,766.40 1.25 408,480.00 1.00 326,784.00 1.10 359,462.40
807-06 structural metalwork lump      LUMP 10,500.00 10,500.00 10,000.00 10,000.00 10,000.00 10,000.00 7,500.00 7,500.00
810-01 concrete railing (barrier) 1,872.00   LNFT 64.00 119,808.00 60.00 112,320.00 46.00 86,112.00 50.00 93,600.00
813-01 concrete approach slab 1,303.75   SQYD 235.00 306,381.25 200.00 260,750.00 200.00 260,750.00 175.00 228,156.25
S-001 rumble strips (ground-in) 15.9    MILE 600.00 9,540.00 900.00 14,310.00 500.00 7,950.00 1,200.00 19,080.00
S-002 saw cutting concrete or asphalt 9,240      LNFT 2.30 21,252.00 7.00 64,680.00 8.00 73,920.00 5.00 46,200.00
S-003 u.s. forest service inspector 210      HOUR 47.00 9,870.00 40.00 8,400.00 48.00 10,080.00 50.00 10,500.00
S-004 removal of s. p. no. 023-04-0021 transition road lump      LUMP 24,000.00 24,000.00 17,500.00 17,500.00 20,000.00 20,000.00 5,000.00 5,000.00
S-101 chain link fence (8-foot height) 520      LNFT 65.00 33,800.00 60.00 31,200.00 58.00 30,160.00 55.00 28,600.00
S-102 retroreflective sheeting panels lump      LUMP 2,800.00 2,800.00 1,500.00 1,500.00 2,000.00 2,000.00 1,250.00 1,250.00
                       
 ITEM TOTAL (CONSTRUCTION BID)       27,961,357.89   28,958,356.98   28,980,181.30   29,607,468.35
 NUMBER OF DAYS BID AT $3,650 PER DAY.       2,463,750.00   2,518,500.00   2,518,500.00   2,518,500.00
 TOTAL BID       30,425,107.89   31,476,856.98   31,498,681.30   32,125,968.35
 
Item Number Item Description Quantity Unit of Measure - 5 -
AUSTIN BRIDGE & ROAD, LP

 

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
201-01 clearing & grubbing lump      LUMP 1,300,000.00 1,300,000.00            
202-01 removal of structures & obstructions lump      LUMP 40,000.00 40,000.00            
202-02-B-01 removal of concrete box culverts (sta. 144+67; 2-6' x
6' x 45')
1      EACH 5,400.00 5,400.00            
202-02-B-02 removal of concrete box culverts (sta. 263+25; 6' x 6'
x 60')
1      EACH 3,600.00 3,600.00            
202-02-B-03 removal of concrete box culverts (sta. 270+81; 2-4.5'
x 4.5' x 54')
1      EACH 4,900.00 4,900.00            
202-02-B-04 removal of concrete box culverts (sta. 348+32; 2-6' x
6' x 51')
1      EACH 6,000.00 6,000.00            
202-02-C removal of portland cement concrete pavement 4,582      SQYD 9.00 41,238.00            
202-02-D removal of concrete walks & drives 890      SQYD 20.00 17,800.00            
202-02-G removal of surfacing & stabilized base 16,711.8    SQYD 4.00 66,847.20            
202-02-H removal of guard rail 531      LNFT 7.50 3,982.50            
202-02-01 removal of 47.5' x 43.2' wood frame residence on piers
(rt. of sta. 119+70)
1      EACH 6,200.00 6,200.00            
202-02-02 removal of kisatchie national forest sign (lt. of sta.
211+90)
1      EACH 100.00 100.00            
202-02-03 removal of 24.7' x 14.9' wood frame residence (rt. of
sta. 251+36)
1      EACH 1,100.00 1,100.00            
202-02-04 removal of shed (lt. of sta. 255+00) 1      EACH 700.00 700.00            
202-02-05 removal of barn (lt. of sta. 255+00) 1      EACH 4,100.00 4,100.00            
202-02-06 removal of 20.4' x 66.6' wood frame residence (lt. of
sta. 256+09)
1      EACH 4,100.00 4,100.00            
202-02-07 removal of 60.7' x 25.2' wood frame residence on piers
(lt. of sta. 297+93)
1      EACH 4,600.00 4,600.00            
202-02-08 removal of 23.5' x 28.0' wood frame workshop on slab
(lt. of sta. 298+14)
1      EACH 2,000.00 2,000.00            
202-02-09 removal of 14.4' x 18.3' shed (lt. of sta. 298+17) 1      EACH 800.00 800.00            
202-02-10 removal of 52.6' x 24.4' wood frame residence on piers
(lt. of sta. 328+32) (contains friable &
non-friable asbestos)
1      EACH 15,000.00 15,000.00            
202-02-11 removal of 25.0' x 12.0' tin barn (lt. of sta. 333+25) 1      EACH 1,000.00 1,000.00            
202-02-12 removal of 38.0' x 33.8' metal barn (lt. of sta.
359+12)
1      EACH 3,800.00 3,800.00            
202-02-13 removal of 25.9' x 40.7' metal building and carport
(lt. of sta. 361+01)
1      EACH 3,200.00 3,200.00            
202-02-14 removal of 26.4' x 42.5' tin shed (lt. of sta. 368+00) 1      EACH 3,400.00 3,400.00            
202-02-15 removal of 26.8' x 22.4' tin shed (lt. of sta. 368+53) 1      EACH 2,100.00 2,100.00            
202-02-16 removal of 11.6' x 60.5' trailer and deck (lt. of sta.
369+11)
1      EACH 2,500.00 2,500.00            
202-02-17 removal of 8.3' x 16.3' shed (lt. of sta. 369+36) 1      EACH 500.00 500.00            
202-02-18 removal of 7.2' x 5.9' wood shed (lt. of sta. 370+41) 1      EACH 100.00 100.00            
202-02-19 removal of 29.7' x 66.1' brick residence on concrete
slab (lt. of sta. 371+36.50)(contains non-friable
asbestos)
1      EACH 17,000.00 17,000.00            
202-02-20 removal of 19.4' x 23.3' wood frame shed (lt. of sta.
372+33)
1      EACH 1,600.00 1,600.00            
202-02-21 removal of 7.8' x 16.1' metal building (lt. of sta.
372+83)
1      EACH 500.00 500.00            
202-02-22 removal of 11.9' x 20.1' wood shed (rt. of sta.
377+82.50)
1      EACH 900.00 900.00            
202-02-23 removal of 33.0' x 42.4' wood frame barn (lt. of sta.
378+00)
1      EACH 4,900.00 4,900.00            
202-02-24 removal of 23.9' x 38.6' wood frame residence (lt. of
sta. 379+07) (contains non-friable asbestos)
1      EACH 14,000.00 14,000.00            
202-02-25 removal of 10.5' x 15.9' wood shed (lt. of sta. 379+00) 1      EACH 600.00 600.00            
202-02-26 removal of 24.1' x 51.9' wood framae residence on
piers (lt. of sta. 381+62)(contains non-friable
asbestos)
1      EACH 15,000.00 15,000.00            
202-02-27 removal of 15.0' x 26.4' shed (lt. of sta. 381+66) 1      EACH 1,400.00 1,400.00            
202-02-28 removal of 20.0' x 35.6' wood frame residence (lt. of
sta. 383+04)
1      EACH 2,100.00 2,100.00            
202-02-29 removal of 14.3' x 16.9' shed (lt. of sta. 384+88) 1      EACH 900.00 900.00            
202-02-30 removal of 10.0' x 20.0' deck (lt. of sta. 385+07) 1      EACH 100.00 100.00            
202-02-31 removal of 14.7' x 19.0' canopy (lt. of sta. 385+13) 1      EACH 100.00 100.00            
202-02-32 removal of 23.0' x 30.0' metal shed (lt. of sta.
401+39)
1      EACH 2,100.00 2,100.00            
202-02-33 removal of 41.7' x 100.2' metal building (lt. of sta.
403+25.50)
1      EACH 14,500.00 14,500.00            
202-02-34 removal of 34.5' x 61.1' wood frame residence on slab
(lt. of sta. 421+12)
1      EACH 7,400.00 7,400.00            
202-02-35 removal of 20.3' x 20.9' wood shed with tin roof (lt.
of sta. 421+29)
1      EACH 1,500.00 1,500.00            
202-02-36 removal of 17.6' x 37.3' wood shed with tin roof (lt.
of sta. 421+63.50)
1      EACH 2,300.00 2,300.00            
202-02-37 removal of 30.1' x 41.1' metal building on slab (lt.
of sta. 426+02)
1      EACH 3,700.00 3,700.00            
203-01 general excavation 546,192      CUYD 3.25 1,775,124.00            
203-02 drainage excavation 1,393      CUYD 8.50 11,840.50            
203-03 muck excavation 3,675      CUYD 8.50 31,237.50            
203-04 embankment 742,075      CUYD 7.00 5,194,525.00            
203-05 nonplastic embankment 143      CUYD 150.00 21,450.00            
203-09 geotextile fabric 922      SQYD 7.00 6,454.00            
204-02 temporary hay or straw bales 238      EACH 6.00 1,428.00            
204-03 temporary slope drains 1,604      LNFT 10.00 16,040.00            
204-05-A temporary sediment check dams (hay) 735      EACH 100.00 73,500.00            
204-05-B temporary sediment check dams (stone) 284      EACH 400.00 113,600.00            
204-06 temporary silt fencing 80,000      LNFT 1.50 120,000.00            
302-02-B-01 class ii base course (8 1/2" thick)(stone or recycled
pccp)
6,801.8    SQYD 28.00 190,450.40            
302-02-E-01 class ii base course (4" thick)(stone or recycled pccp) 195,664.8    SQYD 12.00 2,347,977.60            
302-02-F-01 class ii base course (8" thick)(soil cement) 173,875.6    SQYD 11.00 1,912,631.60            
304-01 lime 1,231.94   TON 145.00 178,631.30            
304-04-D lime treatment (type d) (12" thick) 86,909      SQYD 2.00 173,818.00            
401-01 aggregate surface course (net section) 5,102.1    CUYD 120.00 612,252.00            
401-02 aggregate surface course (adjusted vehicular
measurement)
362      CUYD 120.00 43,440.00            
402-01 traffic maintenance aggregate (vehicular measurement) 2,000.0    CUYD 90.00 180,000.00            
502-01 superpave asphaltic concrete 37,949.0    TON 103.65 3,933,413.85            
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
7,350.5    TON 125.00 918,812.50            
701-01-I cross drain pipe (24" rcp/pcp) 1,332      LNFT 65.00 86,580.00            
701-01-M cross drain pipe (36" rcp/pcp) 76      LNFT 95.00 7,220.00            
701-01-N cross drain pipe (42" rcp/pcp) 228      LNFT 125.00 28,500.00            
701-01-O-01 cross drain pipe (48" rcp)(class v) 460      LNFT 200.00 92,000.00            
701-01-S-01 cross drain pipe (72" rcp)(class iv) 400      LNFT 500.00 200,000.00            
701-01-U cross drain pipe (84" rcp/pcp) 280      LNFT 400.00 112,000.00            
701-02-F cross drain pipe arch (36" equiv. rcpa) 172      LNFT 120.00 20,640.00            
701-02-N cross drain pipe arch (84" equiv. rcpa) 400      LNFT 600.00 240,000.00            
701-03-G storm drain pipe (18" rcp/pcp) 376      LNFT 50.00 18,800.00            
701-03-I storm drain pipe (24" rcp/pcp) 2,372      LNFT 65.00 154,180.00            
701-03-K storm drain pipe (30" rcp/pcp) 88      LNFT 80.00 7,040.00            
701-05-G side drain pipe (18") 1,064      LNFT 50.00 53,200.00            
701-05-I side drain pipe (24") 292      LNFT 65.00 18,980.00            
701-05-I-01 side drain pipe (24")(erosion or bridge drain) 148      LNFT 65.00 9,620.00            
701-05-K side drain pipe (30") 132      LNFT 80.00 10,560.00            
701-10-I reinforced concrete pipe (extension)(24") 22      LNFT 200.00 4,400.00            
702-02-B manholes (r-cb-11) 1      EACH 6,000.00 6,000.00            
702-02-G manholes (r-cb-38) 3      EACH 6,500.00 19,500.00            
702-03-A catch basins (cb-01) 35      EACH 3,000.00 105,000.00            
702-03-B catch basins (cb-02) 1      EACH 4,500.00 4,500.00            
702-07-B cross drain safety end (type 2) 1      EACH 5,000.00 5,000.00            
702-08-A side drain safety end (type 1) 1      EACH 1,250.00 1,250.00            
704-03 blocked out guard rail 1,043.8    LNFT 18.00 18,788.40            
704-08-B guard rail transitions (double thrie beam) 200.0    LNFT 50.00 10,000.00            
704-11-A guard rail end treatment (flared) 6      EACH 1,900.00 11,400.00            
704-11-B guard rail end treatment (tangent) 2      EACH 2,500.00 5,000.00            
705-01 barbed wire fence 4,125      LNFT 6.50 26,812.50            
705-02 combination mesh & barbed wire fence 4,581      LNFT 7.50 34,357.50            
705-04 single swinging driveway gates 3      EACH 500.00 1,500.00            
705-06-A chain link fence (4-foot height) 243      LNFT 25.00 6,075.00            
705-06-B chain link fence (5-foot height) 336      LNFT 30.00 10,080.00            
705-07-A 12-foot single gates for chain link fence (4-foot
height)
1      EACH 1,600.00 1,600.00            
706-02-C concrete drive (6" thick) 304.0    SQYD 65.00 19,760.00            
708-01 right-of-way monument 109      EACH 350.00 38,150.00            
708-02 right-of-way monument witness post 109      EACH 350.00 38,150.00            
711-01-B riprap (10 lb, 12" thick) 3,738      SQYD 55.00 205,590.00            
711-01-D riprap (55 lb, 24" thick) 658      SQYD 100.00 65,800.00            
711-01-E riprap (130 lb, 36" thick) 206      SQYD 125.00 25,750.00            
712-01-A concrete cast-in-place revetment (4" thick) 19,971      SQYD 65.00 1,298,115.00            
712-01-C concrete cast-in-place revetment (6" thick) 396      SQYD 100.00 39,600.00            
712-04 flexible revetment 492      SQYD 60.00 29,520.00            
713-01 temporary signs & barricades lump      LUMP 250,000.00 250,000.00            
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.307  MILE 338.48 2,134.79            
713-05-A temporary pavement markings (solid line)(4" width) 27.923  MILE 676.96 18,902.75            
713-05-A-01 temporary pavement markings (solid line)(4" width)
(type i removable)
0.250  MILE 14,297.32 3,574.33            
713-07 temporary reflectorized raised pavement markers 2,354      EACH 5.00 11,770.00            
713-08 temporary precast concrete barrier (contractor
furnished)
26      EACH 1,500.00 39,000.00            
716-01-A mulch (vegetative) 121.20   ACRE 700.00 84,840.00            
717-01 seeding 7,272      LB 6.50 47,268.00            
718-01 fertilizer 121,200      LB 0.29 35,148.00            
720-01-A erosion control system, slope protection (type a) 68,238      SQYD 1.20 81,885.60            
720-01-C erosion control system, flexible channel liner (type c) 13,197      SQYD 1.75 23,094.75            
720-01-D erosion control system, flexible channel liner (type d) 22,914      SQYD 2.00 45,828.00            
720-01-E erosion control system, flexible channel liner (type e) 3,818      SQYD 2.50 9,545.00            
720-01-F erosion control system, flexible channel liner (type f) 1,904      SQYD 2.50 4,760.00            
722-02 project site laboratory (equipped) 1      EACH 30,000.00 30,000.00            
724-01-C pavement patching (17" minimium thickness) 1,187      SQYD 80.00 94,960.00            
725-01 temporary detour roads 322.5    LNFT 125.00 40,312.50            
726-01 bedding material 2,869.3    CUYD 100.00 286,930.00            
727-01 mobilization lump      LUMP 2,295,000.00 2,295,000.00            
729-16-C object marker assembly (type 3) 6      EACH 80.00 480.00            
729-19-B dead end road installations(type b) 1      EACH 750.00 750.00            
731-01 nonreflectorized raised pavement markers 528      EACH 11.28 5,955.84            
731-02 reflectorized raised pavement markers 2,771      EACH 5.36 14,852.56            
732-01-C plastic pavement striping (8" width) 3,219      LNFT 1.13 3,637.47            
732-01-E plastic pavement striping (24" width) 879      LNFT 3.38 2,971.02            
732-02-A plastic pavement striping (solid line) (4" width) 31.921  MILE 2,500.00 79,802.50            
732-03-A plastic pavement striping (broken line)(4" width) 13.812  MILE 800.00 11,049.60            
732-04-A plastic pavement legends & symbols (arrow) 11      EACH 170.00 1,870.00            
732-04-C plastic pavement legends & symbols (only) 11      EACH 170.00 1,870.00            
732-05-A removal of existing markings (water blasting) 7.000  MILE 8,500.00 59,500.00            
735-01 mailboxes 12      EACH 5.00 60.00            
735-02 mailbox supports (single) 10      EACH 170.00 1,700.00            
735-03 mailbox supports (double) 1      EACH 190.00 190.00            
739-01-A hydro-seeding (u.s forest service) 32.60   ACRE 1,200.00 39,120.00            
740-01 construction layout lump      LUMP 350,000.00 350,000.00            
740-02 utility oversight and coordination lump      LUMP 35,000.00 35,000.00            
744-01 traffic control management lump      LUMP 50,000.00 50,000.00            
804-01-B precast concrete piles (14") 400      LNFT 80.00 32,000.00            
804-01-C precast concrete piles (16") 2,148      LNFT 80.00 171,840.00            
804-01-F precast concrete piles (24") 2,140      LNFT 120.00 256,800.00            
804-01-G precast concrete piles (30") 1,320      LNFT 150.00 198,000.00            
804-05 precast concrete test piles 2      EACH 38,000.00 76,000.00            
804-09 loading test piles 2      EACH 28,000.00 56,000.00            
804-10 reloading test piles 2      EACH 6,000.00 12,000.00            
804-11 redriving test piles 2      EACH 6,300.00 12,600.00            
804-12 loading permanent piles 2      EACH 20,000.00 40,000.00            
804-17 dynamic monitoring 6      EACH 3,500.00 21,000.00            
805-01-B class a concrete (box culvert headwalls) 59.11   CUYD 1,500.00 88,665.00            
805-01-F class a concrete (bents) 477.81   CUYD 900.00 430,029.00            
805-03 class aa concrete 1,045.80   CUYD 700.00 732,060.00            
805-08-D precast-prestressed concrete girders (type iv) 4,315.0    LNFT 165.00 711,975.00            
805-11 strip seal joints 248.92   LNFT 180.00 44,805.60            
805-12-E reinforced concrete box culverts (4'x 4') 156.0    LNFT 450.00 70,200.00            
805-12-E-01 reinforced concrete box culverts (4'x 4')(extension) 330.0    LNFT 700.00 231,000.00            
805-12-F reinforced concrete box culverts (5'x 4') 615.0    LNFT 650.00 399,750.00            
805-12-M reinforced concrete box culverts (6'x 6') 406.0    LNFT 750.00 304,500.00            
806-01 deformed reinforcing steel 326,784      LB 1.00 326,784.00            
807-06 structural metalwork lump      LUMP 6,500.00 6,500.00            
810-01 concrete railing (barrier) 1,872.00   LNFT 55.00 102,960.00            
813-01 concrete approach slab 1,303.75   SQYD 185.00 241,193.75            
S-001 rumble strips (ground-in) 15.9    MILE 1,900.00 30,210.00            
S-002 saw cutting concrete or asphalt 9,240      LNFT 3.50 32,340.00            
S-003 u.s. forest service inspector 210      HOUR 47.60 9,996.00            
S-004 removal of s. p. no. 023-04-0021 transition road lump      LUMP 25,000.00 25,000.00            
S-101 chain link fence (8-foot height) 520      LNFT 35.00 18,200.00            
S-102 retroreflective sheeting panels lump      LUMP 1,500.00 1,500.00            
                       
 ITEM TOTAL (CONSTRUCTION BID)       31,330,983.41            
 NUMBER OF DAYS BID AT $3,650 PER DAY.       2,518,500.00            
 TOTAL BID       33,849,483.41            