| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - GILCHRIST CONSTRUCTION CO. LLC |
- 2 - DIAMOND B CONSTRUCTION CO., L.L.C. |
- 3 - DENTON-JAMES LLC |
- 4 - D & J CONSTRUCTION CO., INC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
550,000.00 |
550,000.00 |
400,000.00 |
400,000.00 |
900,000.00 |
900,000.00 |
750,000.00 |
750,000.00 |
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
95,000.00 |
95,000.00 |
100,000.00 |
100,000.00 |
200,000.00 |
200,000.00 |
100,000.00 |
100,000.00 |
| 202-02-B-01 |
removal of concrete box culverts (sta. 144+67; 2-6' x
6' x 45') |
1   |
EACH |
8,000.00 |
8,000.00 |
14,000.00 |
14,000.00 |
7,000.00 |
7,000.00 |
7,500.00 |
7,500.00 |
| 202-02-B-02 |
removal of concrete box culverts (sta. 263+25; 6' x 6'
x 60') |
1   |
EACH |
4,000.00 |
4,000.00 |
10,000.00 |
10,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
| 202-02-B-03 |
removal of concrete box culverts (sta. 270+81; 2-4.5'
x 4.5' x 54') |
1   |
EACH |
8,000.00 |
8,000.00 |
15,000.00 |
15,000.00 |
5,000.00 |
5,000.00 |
7,500.00 |
7,500.00 |
| 202-02-B-04 |
removal of concrete box culverts (sta. 348+32; 2-6' x
6' x 51') |
1   |
EACH |
4,000.00 |
4,000.00 |
18,000.00 |
18,000.00 |
5,000.00 |
5,000.00 |
7,500.00 |
7,500.00 |
| 202-02-C |
removal of portland cement concrete pavement
|
4,582   |
SQYD |
6.00 |
27,492.00 |
4.50 |
20,619.00 |
5.00 |
22,910.00 |
6.00 |
27,492.00 |
| 202-02-D |
removal of concrete walks & drives
|
890   |
SQYD |
10.00 |
8,900.00 |
7.00 |
6,230.00 |
10.00 |
8,900.00 |
11.00 |
9,790.00 |
| 202-02-G |
removal of surfacing & stabilized base
|
16,711.8 |
SQYD |
4.25 |
71,025.15 |
6.00 |
100,270.80 |
4.50 |
75,203.10 |
3.50 |
58,491.30 |
| 202-02-H |
removal of guard rail
|
531   |
LNFT |
12.00 |
6,372.00 |
7.00 |
3,717.00 |
6.00 |
3,186.00 |
5.00 |
2,655.00 |
| 202-02-01 |
removal of 47.5' x 43.2' wood frame residence on piers
(rt. of sta. 119+70) |
1   |
EACH |
4,500.00 |
4,500.00 |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-02 |
removal of kisatchie national forest sign (lt. of sta.
211+90) |
1   |
EACH |
1,500.00 |
1,500.00 |
30.00 |
30.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-03 |
removal of 24.7' x 14.9' wood frame residence (rt. of
sta. 251+36) |
1   |
EACH |
2,000.00 |
2,000.00 |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-04 |
removal of shed (lt. of sta. 255+00)
|
1   |
EACH |
800.00 |
800.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-05 |
removal of barn (lt. of sta. 255+00)
|
1   |
EACH |
1,000.00 |
1,000.00 |
2,500.00 |
2,500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-06 |
removal of 20.4' x 66.6' wood frame residence (lt. of
sta. 256+09) |
1   |
EACH |
3,200.00 |
3,200.00 |
3,500.00 |
3,500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-07 |
removal of 60.7' x 25.2' wood frame residence on piers
(lt. of sta. 297+93) |
1   |
EACH |
3,500.00 |
3,500.00 |
3,500.00 |
3,500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-08 |
removal of 23.5' x 28.0' wood frame workshop on slab
(lt. of sta. 298+14) |
1   |
EACH |
1,200.00 |
1,200.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-09 |
removal of 14.4' x 18.3' shed (lt. of sta. 298+17)
|
1   |
EACH |
800.00 |
800.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-10 |
removal of 52.6' x 24.4' wood frame residence on piers
(lt. of sta. 328+32) (contains friable & non-friable asbestos) |
1   |
EACH |
3,200.00 |
3,200.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-11 |
removal of 25.0' x 12.0' tin barn (lt. of sta. 333+25)
|
1   |
EACH |
1,600.00 |
1,600.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-12 |
removal of 38.0' x 33.8' metal barn (lt. of sta.
359+12) |
1   |
EACH |
3,100.00 |
3,100.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-13 |
removal of 25.9' x 40.7' metal building and carport
(lt. of sta. 361+01) |
1   |
EACH |
3,200.00 |
3,200.00 |
1,200.00 |
1,200.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-14 |
removal of 26.4' x 42.5' tin shed (lt. of sta. 368+00)
|
1   |
EACH |
2,000.00 |
2,000.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-15 |
removal of 26.8' x 22.4' tin shed (lt. of sta. 368+53)
|
1   |
EACH |
1,700.00 |
1,700.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-16 |
removal of 11.6' x 60.5' trailer and deck (lt. of sta.
369+11) |
1   |
EACH |
2,400.00 |
2,400.00 |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-17 |
removal of 8.3' x 16.3' shed (lt. of sta. 369+36)
|
1   |
EACH |
700.00 |
700.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-18 |
removal of 7.2' x 5.9' wood shed (lt. of sta. 370+41)
|
1   |
EACH |
650.00 |
650.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-19 |
removal of 29.7' x 66.1' brick residence on concrete
slab (lt. of sta. 371+36.50)(contains non-friable asbestos) |
1   |
EACH |
4,700.00 |
4,700.00 |
4,000.00 |
4,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-20 |
removal of 19.4' x 23.3' wood frame shed (lt. of sta.
372+33) |
1   |
EACH |
1,000.00 |
1,000.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-21 |
removal of 7.8' x 16.1' metal building (lt. of sta.
372+83) |
1   |
EACH |
1,600.00 |
1,600.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-22 |
removal of 11.9' x 20.1' wood shed (rt. of sta.
377+82.50) |
1   |
EACH |
1,300.00 |
1,300.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-23 |
removal of 33.0' x 42.4' wood frame barn (lt. of sta.
378+00) |
1   |
EACH |
3,200.00 |
3,200.00 |
1,200.00 |
1,200.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-24 |
removal of 23.9' x 38.6' wood frame residence (lt. of
sta. 379+07) (contains non-friable asbestos) |
1   |
EACH |
2,700.00 |
2,700.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-25 |
removal of 10.5' x 15.9' wood shed (lt. of sta. 379+00)
|
1   |
EACH |
1,500.00 |
1,500.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-26 |
removal of 24.1' x 51.9' wood framae residence on
piers (lt. of sta. 381+62)(contains non-friable asbestos) |
1   |
EACH |
3,100.00 |
3,100.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-27 |
removal of 15.0' x 26.4' shed (lt. of sta. 381+66)
|
1   |
EACH |
1,700.00 |
1,700.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-28 |
removal of 20.0' x 35.6' wood frame residence (lt. of
sta. 383+04) |
1   |
EACH |
2,400.00 |
2,400.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-29 |
removal of 14.3' x 16.9' shed (lt. of sta. 384+88)
|
1   |
EACH |
1,700.00 |
1,700.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-30 |
removal of 10.0' x 20.0' deck (lt. of sta. 385+07)
|
1   |
EACH |
700.00 |
700.00 |
400.00 |
400.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-31 |
removal of 14.7' x 19.0' canopy (lt. of sta. 385+13)
|
1   |
EACH |
1,000.00 |
1,000.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-32 |
removal of 23.0' x 30.0' metal shed (lt. of sta.
401+39) |
1   |
EACH |
1,200.00 |
1,200.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-33 |
removal of 41.7' x 100.2' metal building (lt. of sta.
403+25.50) |
1   |
EACH |
7,600.00 |
7,600.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-34 |
removal of 34.5' x 61.1' wood frame residence on slab
(lt. of sta. 421+12) |
1   |
EACH |
4,500.00 |
4,500.00 |
3,500.00 |
3,500.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-35 |
removal of 20.3' x 20.9' wood shed with tin roof (lt.
of sta. 421+29) |
1   |
EACH |
1,400.00 |
1,400.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-36 |
removal of 17.6' x 37.3' wood shed with tin roof (lt.
of sta. 421+63.50) |
1   |
EACH |
1,400.00 |
1,400.00 |
600.00 |
600.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 202-02-37 |
removal of 30.1' x 41.1' metal building on slab (lt.
of sta. 426+02) |
1   |
EACH |
1,300.00 |
1,300.00 |
3,000.00 |
3,000.00 |
1.00 |
1.00 |
1.00 |
1.00 |
| 203-01 |
general excavation
|
546,192   |
CUYD |
3.60 |
1,966,291.20 |
3.75 |
2,048,220.00 |
3.60 |
1,966,291.20 |
4.00 |
2,184,768.00 |
| 203-02 |
drainage excavation
|
1,393   |
CUYD |
13.25 |
18,457.25 |
10.00 |
13,930.00 |
12.00 |
16,716.00 |
8.00 |
11,144.00 |
| 203-03 |
muck excavation
|
3,675   |
CUYD |
15.00 |
55,125.00 |
10.00 |
36,750.00 |
12.00 |
44,100.00 |
12.00 |
44,100.00 |
| 203-04 |
embankment
|
742,075   |
CUYD |
6.70 |
4,971,902.50 |
6.00 |
4,452,450.00 |
6.50 |
4,823,487.50 |
7.00 |
5,194,525.00 |
| 203-05 |
nonplastic embankment
|
143   |
CUYD |
180.00 |
25,740.00 |
100.00 |
14,300.00 |
200.00 |
28,600.00 |
100.00 |
14,300.00 |
| 203-09 |
geotextile fabric
|
922   |
SQYD |
4.00 |
3,688.00 |
2.00 |
1,844.00 |
2.00 |
1,844.00 |
2.50 |
2,305.00 |
| 204-02 |
temporary hay or straw bales
|
238   |
EACH |
20.00 |
4,760.00 |
20.00 |
4,760.00 |
9.50 |
2,261.00 |
12.00 |
2,856.00 |
| 204-03 |
temporary slope drains
|
1,604   |
LNFT |
15.00 |
24,060.00 |
20.00 |
32,080.00 |
10.00 |
16,040.00 |
8.00 |
12,832.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
735   |
EACH |
130.00 |
95,550.00 |
200.00 |
147,000.00 |
100.00 |
73,500.00 |
110.00 |
80,850.00 |
| 204-05-B |
temporary sediment check dams (stone)
|
284   |
EACH |
640.00 |
181,760.00 |
600.00 |
170,400.00 |
600.00 |
170,400.00 |
325.00 |
92,300.00 |
| 204-06 |
temporary silt fencing
|
80,000   |
LNFT |
1.60 |
128,000.00 |
3.50 |
280,000.00 |
1.40 |
112,000.00 |
2.00 |
160,000.00 |
| 302-02-B-01 |
class ii base course (8 1/2" thick)(stone or recycled
pccp) |
6,801.8 |
SQYD |
28.00 |
190,450.40 |
25.00 |
170,045.00 |
27.00 |
183,648.60 |
30.00 |
204,054.00 |
| 302-02-E-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
195,664.8 |
SQYD |
11.00 |
2,152,312.80 |
10.75 |
2,103,396.60 |
12.00 |
2,347,977.60 |
10.00 |
1,956,648.00 |
| 302-02-F-01 |
class ii base course (8" thick)(soil cement)
|
173,875.6 |
SQYD |
9.00 |
1,564,880.40 |
10.50 |
1,825,693.80 |
9.50 |
1,651,818.20 |
10.00 |
1,738,756.00 |
| 304-01 |
lime
|
1,231.94 |
TON |
0.01 |
12.32 |
1.00 |
1,231.94 |
125.00 |
153,992.50 |
75.00 |
92,395.50 |
| 304-04-D |
lime treatment (type d) (12" thick)
|
86,909   |
SQYD |
0.01 |
869.09 |
1.00 |
86,909.00 |
1.00 |
86,909.00 |
0.50 |
43,454.50 |
| 401-01 |
aggregate surface course (net section)
|
5,102.1 |
CUYD |
90.00 |
459,189.00 |
80.00 |
408,168.00 |
60.00 |
306,126.00 |
95.00 |
484,699.50 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
362   |
CUYD |
94.00 |
34,028.00 |
85.00 |
30,770.00 |
55.00 |
19,910.00 |
135.00 |
48,870.00 |
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
2,000.0 |
CUYD |
65.00 |
130,000.00 |
70.00 |
140,000.00 |
70.00 |
140,000.00 |
75.00 |
150,000.00 |
| 502-01 |
superpave asphaltic concrete
|
37,949.0 |
TON |
78.50 |
2,978,996.50 |
80.00 |
3,035,920.00 |
84.00 |
3,187,716.00 |
82.00 |
3,111,818.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
7,350.5 |
TON |
105.00 |
771,802.50 |
120.00 |
882,060.00 |
130.00 |
955,565.00 |
95.00 |
698,297.50 |
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
1,332   |
LNFT |
90.00 |
119,880.00 |
90.00 |
119,880.00 |
80.00 |
106,560.00 |
70.00 |
93,240.00 |
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
76   |
LNFT |
145.00 |
11,020.00 |
135.00 |
10,260.00 |
120.00 |
9,120.00 |
125.00 |
9,500.00 |
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
228   |
LNFT |
165.00 |
37,620.00 |
205.00 |
46,740.00 |
160.00 |
36,480.00 |
185.00 |
42,180.00 |
| 701-01-O-01 |
cross drain pipe (48" rcp)(class v)
|
460   |
LNFT |
200.00 |
92,000.00 |
275.00 |
126,500.00 |
200.00 |
92,000.00 |
235.00 |
108,100.00 |
| 701-01-S-01 |
cross drain pipe (72" rcp)(class iv)
|
400   |
LNFT |
370.00 |
148,000.00 |
440.00 |
176,000.00 |
400.00 |
160,000.00 |
305.00 |
122,000.00 |
| 701-01-U |
cross drain pipe (84" rcp/pcp)
|
280   |
LNFT |
420.00 |
117,600.00 |
525.00 |
147,000.00 |
450.00 |
126,000.00 |
455.00 |
127,400.00 |
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
172   |
LNFT |
170.00 |
29,240.00 |
160.00 |
27,520.00 |
160.00 |
27,520.00 |
155.00 |
26,660.00 |
| 701-02-N |
cross drain pipe arch (84" equiv. rcpa)
|
400   |
LNFT |
440.00 |
176,000.00 |
575.00 |
230,000.00 |
500.00 |
200,000.00 |
455.00 |
182,000.00 |
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
376   |
LNFT |
65.00 |
24,440.00 |
85.00 |
31,960.00 |
45.00 |
16,920.00 |
50.00 |
18,800.00 |
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
2,372   |
LNFT |
80.00 |
189,760.00 |
100.00 |
237,200.00 |
70.00 |
166,040.00 |
65.00 |
154,180.00 |
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
88   |
LNFT |
95.00 |
8,360.00 |
115.00 |
10,120.00 |
75.00 |
6,600.00 |
80.00 |
7,040.00 |
| 701-05-G |
side drain pipe (18")
|
1,064   |
LNFT |
45.00 |
47,880.00 |
75.00 |
79,800.00 |
40.00 |
42,560.00 |
55.00 |
58,520.00 |
| 701-05-I |
side drain pipe (24")
|
292   |
LNFT |
60.00 |
17,520.00 |
90.00 |
26,280.00 |
50.00 |
14,600.00 |
70.00 |
20,440.00 |
| 701-05-I-01 |
side drain pipe (24")(erosion or bridge drain)
|
148   |
LNFT |
80.00 |
11,840.00 |
90.00 |
13,320.00 |
60.00 |
8,880.00 |
70.00 |
10,360.00 |
| 701-05-K |
side drain pipe (30")
|
132   |
LNFT |
78.00 |
10,296.00 |
110.00 |
14,520.00 |
60.00 |
7,920.00 |
85.00 |
11,220.00 |
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
22   |
LNFT |
135.00 |
2,970.00 |
125.00 |
2,750.00 |
220.00 |
4,840.00 |
85.00 |
1,870.00 |
| 702-02-B |
manholes (r-cb-11)
|
1   |
EACH |
3,200.00 |
3,200.00 |
4,100.00 |
4,100.00 |
5,000.00 |
5,000.00 |
4,200.00 |
4,200.00 |
| 702-02-G |
manholes (r-cb-38)
|
3   |
EACH |
6,000.00 |
18,000.00 |
9,000.00 |
27,000.00 |
10,000.00 |
30,000.00 |
5,200.00 |
15,600.00 |
| 702-03-A |
catch basins (cb-01)
|
35   |
EACH |
2,500.00 |
87,500.00 |
4,500.00 |
157,500.00 |
2,500.00 |
87,500.00 |
3,200.00 |
112,000.00 |
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
3,000.00 |
3,000.00 |
4,500.00 |
4,500.00 |
3,500.00 |
3,500.00 |
3,700.00 |
3,700.00 |
| 702-07-B |
cross drain safety end (type 2)
|
1   |
EACH |
8,000.00 |
8,000.00 |
6,000.00 |
6,000.00 |
4,000.00 |
4,000.00 |
2,700.00 |
2,700.00 |
| 702-08-A |
side drain safety end (type 1)
|
1   |
EACH |
3,000.00 |
3,000.00 |
2,800.00 |
2,800.00 |
1,000.00 |
1,000.00 |
1,800.00 |
1,800.00 |
| 704-03 |
blocked out guard rail
|
1,043.8 |
LNFT |
21.00 |
21,919.80 |
20.00 |
20,876.00 |
18.00 |
18,788.40 |
19.00 |
19,832.20 |
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
63.00 |
12,600.00 |
55.00 |
11,000.00 |
50.00 |
10,000.00 |
55.00 |
11,000.00 |
| 704-11-A |
guard rail end treatment (flared)
|
6   |
EACH |
2,300.00 |
13,800.00 |
2,200.00 |
13,200.00 |
2,000.00 |
12,000.00 |
2,000.00 |
12,000.00 |
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
2,700.00 |
5,400.00 |
3,000.00 |
6,000.00 |
2,500.00 |
5,000.00 |
2,300.00 |
4,600.00 |
| 705-01 |
barbed wire fence
|
4,125   |
LNFT |
6.00 |
24,750.00 |
6.00 |
24,750.00 |
5.50 |
22,687.50 |
5.00 |
20,625.00 |
| 705-02 |
combination mesh & barbed wire fence
|
4,581   |
LNFT |
6.80 |
31,150.80 |
6.00 |
27,486.00 |
6.00 |
27,486.00 |
5.50 |
25,195.50 |
| 705-04 |
single swinging driveway gates
|
3   |
EACH |
585.00 |
1,755.00 |
450.00 |
1,350.00 |
500.00 |
1,500.00 |
450.00 |
1,350.00 |
| 705-06-A |
chain link fence (4-foot height)
|
243   |
LNFT |
21.00 |
5,103.00 |
17.00 |
4,131.00 |
20.00 |
4,860.00 |
16.00 |
3,888.00 |
| 705-06-B |
chain link fence (5-foot height)
|
336   |
LNFT |
23.00 |
7,728.00 |
18.00 |
6,048.00 |
22.00 |
7,392.00 |
16.00 |
5,376.00 |
| 705-07-A |
12-foot single gates for chain link fence (4-foot
height) |
1   |
EACH |
1,200.00 |
1,200.00 |
1,100.00 |
1,100.00 |
1,000.00 |
1,000.00 |
1,000.00 |
1,000.00 |
| 706-02-C |
concrete drive (6" thick)
|
304.0 |
SQYD |
85.00 |
25,840.00 |
65.00 |
19,760.00 |
65.00 |
19,760.00 |
50.00 |
15,200.00 |
| 708-01 |
right-of-way monument
|
109   |
EACH |
400.00 |
43,600.00 |
100.00 |
10,900.00 |
120.00 |
13,080.00 |
200.00 |
21,800.00 |
| 708-02 |
right-of-way monument witness post
|
109   |
EACH |
400.00 |
43,600.00 |
100.00 |
10,900.00 |
120.00 |
13,080.00 |
120.00 |
13,080.00 |
| 711-01-B |
riprap (10 lb, 12" thick)
|
3,738   |
SQYD |
55.00 |
205,590.00 |
80.00 |
299,040.00 |
45.00 |
168,210.00 |
70.00 |
261,660.00 |
| 711-01-D |
riprap (55 lb, 24" thick)
|
658   |
SQYD |
110.00 |
72,380.00 |
85.00 |
55,930.00 |
75.00 |
49,350.00 |
70.00 |
46,060.00 |
| 711-01-E |
riprap (130 lb, 36" thick)
|
206   |
SQYD |
140.00 |
28,840.00 |
125.00 |
25,750.00 |
120.00 |
24,720.00 |
90.00 |
18,540.00 |
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
19,971   |
SQYD |
62.00 |
1,238,202.00 |
50.00 |
998,550.00 |
42.00 |
838,782.00 |
45.00 |
898,695.00 |
| 712-01-C |
concrete cast-in-place revetment (6" thick)
|
396   |
SQYD |
75.00 |
29,700.00 |
60.00 |
23,760.00 |
90.00 |
35,640.00 |
55.00 |
21,780.00 |
| 712-04 |
flexible revetment
|
492   |
SQYD |
60.00 |
29,520.00 |
60.00 |
29,520.00 |
45.00 |
22,140.00 |
60.00 |
29,520.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
250,000.00 |
250,000.00 |
250,000.00 |
250,000.00 |
300,000.00 |
300,000.00 |
1,225,000.00 |
1,225,000.00 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.307 |
MILE |
540.00 |
3,405.78 |
330.00 |
2,081.31 |
300.00 |
1,892.10 |
250.00 |
1,576.75 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
27.923 |
MILE |
900.00 |
25,130.70 |
650.00 |
18,149.95 |
600.00 |
16,753.80 |
500.00 |
13,961.50 |
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
0.250 |
MILE |
17,600.00 |
4,400.00 |
14,500.00 |
3,625.00 |
13,000.00 |
3,250.00 |
8,000.00 |
2,000.00 |
| 713-07 |
temporary reflectorized raised pavement markers
|
2,354   |
EACH |
1.40 |
3,295.60 |
0.42 |
988.68 |
4.00 |
9,416.00 |
3.50 |
8,239.00 |
| 713-08 |
temporary precast concrete barrier (contractor
furnished) |
26   |
EACH |
1,200.00 |
31,200.00 |
900.00 |
23,400.00 |
1,200.00 |
31,200.00 |
1,200.00 |
31,200.00 |
| 716-01-A |
mulch (vegetative)
|
121.20 |
ACRE |
800.00 |
96,960.00 |
750.00 |
90,900.00 |
700.00 |
84,840.00 |
675.00 |
81,810.00 |
| 717-01 |
seeding
|
7,272   |
LB |
8.00 |
58,176.00 |
8.00 |
58,176.00 |
7.00 |
50,904.00 |
7.20 |
52,358.40 |
| 718-01 |
fertilizer
|
121,200   |
LB |
0.30 |
36,360.00 |
0.35 |
42,420.00 |
0.25 |
30,300.00 |
0.34 |
41,208.00 |
| 720-01-A |
erosion control system, slope protection (type a)
|
68,238   |
SQYD |
1.20 |
81,885.60 |
1.20 |
81,885.60 |
1.00 |
68,238.00 |
1.10 |
75,061.80 |
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
13,197   |
SQYD |
1.85 |
24,414.45 |
1.50 |
19,795.50 |
1.60 |
21,115.20 |
1.50 |
19,795.50 |
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
22,914   |
SQYD |
2.25 |
51,556.50 |
1.50 |
34,371.00 |
2.00 |
45,828.00 |
1.50 |
34,371.00 |
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
3,818   |
SQYD |
3.00 |
11,454.00 |
3.50 |
13,363.00 |
2.50 |
9,545.00 |
3.10 |
11,835.80 |
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
1,904   |
SQYD |
3.30 |
6,283.20 |
3.50 |
6,664.00 |
3.00 |
5,712.00 |
3.10 |
5,902.40 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
120,000.00 |
120,000.00 |
50,000.00 |
50,000.00 |
60,000.00 |
60,000.00 |
35,000.00 |
35,000.00 |
| 724-01-C |
pavement patching (17" minimium thickness)
|
1,187   |
SQYD |
90.00 |
106,830.00 |
90.00 |
106,830.00 |
80.00 |
94,960.00 |
100.00 |
118,700.00 |
| 725-01 |
temporary detour roads
|
322.5 |
LNFT |
190.00 |
61,275.00 |
150.00 |
48,375.00 |
250.00 |
80,625.00 |
125.00 |
40,312.50 |
| 726-01 |
bedding material
|
2,869.3 |
CUYD |
95.00 |
272,583.50 |
85.00 |
243,890.50 |
75.00 |
215,197.50 |
80.00 |
229,544.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
2,600,000.00 |
2,600,000.00 |
2,750,000.00 |
2,750,000.00 |
2,700,000.00 |
2,700,000.00 |
2,800,000.00 |
2,800,000.00 |
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
85.00 |
510.00 |
88.00 |
528.00 |
80.00 |
480.00 |
75.00 |
450.00 |
| 729-19-B |
dead end road installations(type b)
|
1   |
EACH |
1,400.00 |
1,400.00 |
825.00 |
825.00 |
750.00 |
750.00 |
1,200.00 |
1,200.00 |
| 731-01 |
nonreflectorized raised pavement markers
|
528   |
EACH |
14.50 |
7,656.00 |
11.00 |
5,808.00 |
10.00 |
5,280.00 |
12.50 |
6,600.00 |
| 731-02 |
reflectorized raised pavement markers
|
2,771   |
EACH |
5.75 |
15,933.25 |
5.50 |
15,240.50 |
5.00 |
13,855.00 |
5.00 |
13,855.00 |
| 732-01-C |
plastic pavement striping (8" width)
|
3,219   |
LNFT |
0.95 |
3,058.05 |
1.20 |
3,862.80 |
1.00 |
3,219.00 |
5.00 |
16,095.00 |
| 732-01-E |
plastic pavement striping (24" width)
|
879   |
LNFT |
4.20 |
3,691.80 |
3.50 |
3,076.50 |
3.00 |
2,637.00 |
6.00 |
5,274.00 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
31.921 |
MILE |
2,700.00 |
86,186.70 |
2,500.00 |
79,802.50 |
2,200.00 |
70,226.20 |
2,000.00 |
63,842.00 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
13.812 |
MILE |
1,100.00 |
15,193.20 |
750.00 |
10,359.00 |
700.00 |
9,668.40 |
1,000.00 |
13,812.00 |
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
11   |
EACH |
225.00 |
2,475.00 |
175.00 |
1,925.00 |
150.00 |
1,650.00 |
550.00 |
6,050.00 |
| 732-04-C |
plastic pavement legends & symbols (only)
|
11   |
EACH |
255.00 |
2,805.00 |
175.00 |
1,925.00 |
150.00 |
1,650.00 |
550.00 |
6,050.00 |
| 732-05-A |
removal of existing markings (water blasting)
|
7.000 |
MILE |
6,500.00 |
45,500.00 |
8,500.00 |
59,500.00 |
7,500.00 |
52,500.00 |
15,000.00 |
105,000.00 |
| 735-01 |
mailboxes
|
12   |
EACH |
12.00 |
144.00 |
10.00 |
120.00 |
1.00 |
12.00 |
25.00 |
300.00 |
| 735-02 |
mailbox supports (single)
|
10   |
EACH |
180.00 |
1,800.00 |
200.00 |
2,000.00 |
170.00 |
1,700.00 |
175.00 |
1,750.00 |
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
235.00 |
235.00 |
225.00 |
225.00 |
200.00 |
200.00 |
200.00 |
200.00 |
| 739-01-A |
hydro-seeding (u.s forest service)
|
32.60 |
ACRE |
1,300.00 |
42,380.00 |
1,000.00 |
32,600.00 |
1,000.00 |
32,600.00 |
925.00 |
30,155.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
300,000.00 |
300,000.00 |
300,000.00 |
300,000.00 |
500,000.00 |
500,000.00 |
475,000.00 |
475,000.00 |
| 740-02 |
utility oversight and coordination
|
lump |
LUMP |
40,000.00 |
40,000.00 |
40,000.00 |
40,000.00 |
80,000.00 |
80,000.00 |
75,000.00 |
75,000.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
130,000.00 |
130,000.00 |
100,000.00 |
100,000.00 |
60,000.00 |
60,000.00 |
73,000.00 |
73,000.00 |
| 804-01-B |
precast concrete piles (14")
|
400   |
LNFT |
46.00 |
18,400.00 |
62.00 |
24,800.00 |
90.00 |
36,000.00 |
56.00 |
22,400.00 |
| 804-01-C |
precast concrete piles (16")
|
2,148   |
LNFT |
47.00 |
100,956.00 |
50.00 |
107,400.00 |
106.00 |
227,688.00 |
47.00 |
100,956.00 |
| 804-01-F |
precast concrete piles (24")
|
2,140   |
LNFT |
85.00 |
181,900.00 |
130.00 |
278,200.00 |
140.00 |
299,600.00 |
116.00 |
248,240.00 |
| 804-01-G |
precast concrete piles (30")
|
1,320   |
LNFT |
112.00 |
147,840.00 |
210.00 |
277,200.00 |
180.00 |
237,600.00 |
200.00 |
264,000.00 |
| 804-05 |
precast concrete test piles
|
2   |
EACH |
12,000.00 |
24,000.00 |
17,000.00 |
34,000.00 |
40,000.00 |
80,000.00 |
15,000.00 |
30,000.00 |
| 804-09 |
loading test piles
|
2   |
EACH |
10,000.00 |
20,000.00 |
100.00 |
200.00 |
14,000.00 |
28,000.00 |
16,000.00 |
32,000.00 |
| 804-10 |
reloading test piles
|
2   |
EACH |
100.00 |
200.00 |
100.00 |
200.00 |
1,000.00 |
2,000.00 |
1,000.00 |
2,000.00 |
| 804-11 |
redriving test piles
|
2   |
EACH |
100.00 |
200.00 |
100.00 |
200.00 |
1,000.00 |
2,000.00 |
3,000.00 |
6,000.00 |
| 804-12 |
loading permanent piles
|
2   |
EACH |
100.00 |
200.00 |
100.00 |
200.00 |
1,000.00 |
2,000.00 |
16,000.00 |
32,000.00 |
| 804-17 |
dynamic monitoring
|
6   |
EACH |
1,200.00 |
7,200.00 |
3,500.00 |
21,000.00 |
1,000.00 |
6,000.00 |
3,200.00 |
19,200.00 |
| 805-01-B |
class a concrete (box culvert headwalls)
|
59.11 |
CUYD |
1,600.00 |
94,576.00 |
1,600.00 |
94,576.00 |
1,200.00 |
70,932.00 |
1,000.00 |
59,110.00 |
| 805-01-F |
class a concrete (bents)
|
477.81 |
CUYD |
720.00 |
344,023.20 |
800.00 |
382,248.00 |
850.00 |
406,138.50 |
725.00 |
346,412.25 |
| 805-03 |
class aa concrete
|
1,045.80 |
CUYD |
750.00 |
784,350.00 |
750.00 |
784,350.00 |
750.00 |
784,350.00 |
650.00 |
679,770.00 |
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
4,315.0 |
LNFT |
130.00 |
560,950.00 |
175.00 |
755,125.00 |
170.00 |
733,550.00 |
160.00 |
690,400.00 |
| 805-11 |
strip seal joints
|
248.92 |
LNFT |
150.00 |
37,338.00 |
200.00 |
49,784.00 |
150.00 |
37,338.00 |
165.00 |
41,071.80 |
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
156.0 |
LNFT |
360.00 |
56,160.00 |
600.00 |
93,600.00 |
270.00 |
42,120.00 |
400.00 |
62,400.00 |
| 805-12-E-01 |
reinforced concrete box culverts (4'x 4')(extension)
|
330.0 |
LNFT |
340.00 |
112,200.00 |
700.00 |
231,000.00 |
300.00 |
99,000.00 |
400.00 |
132,000.00 |
| 805-12-F |
reinforced concrete box culverts (5'x 4')
|
615.0 |
LNFT |
400.00 |
246,000.00 |
625.00 |
384,375.00 |
350.00 |
215,250.00 |
400.00 |
246,000.00 |
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
406.0 |
LNFT |
575.00 |
233,450.00 |
675.00 |
274,050.00 |
500.00 |
203,000.00 |
500.00 |
203,000.00 |
| 806-01 |
deformed reinforcing steel
|
326,784   |
LB |
0.85 |
277,766.40 |
1.25 |
408,480.00 |
1.00 |
326,784.00 |
1.10 |
359,462.40 |
| 807-06 |
structural metalwork
|
lump |
LUMP |
10,500.00 |
10,500.00 |
10,000.00 |
10,000.00 |
10,000.00 |
10,000.00 |
7,500.00 |
7,500.00 |
| 810-01 |
concrete railing (barrier)
|
1,872.00 |
LNFT |
64.00 |
119,808.00 |
60.00 |
112,320.00 |
46.00 |
86,112.00 |
50.00 |
93,600.00 |
| 813-01 |
concrete approach slab
|
1,303.75 |
SQYD |
235.00 |
306,381.25 |
200.00 |
260,750.00 |
200.00 |
260,750.00 |
175.00 |
228,156.25 |
| S-001 |
rumble strips (ground-in)
|
15.9 |
MILE |
600.00 |
9,540.00 |
900.00 |
14,310.00 |
500.00 |
7,950.00 |
1,200.00 |
19,080.00 |
| S-002 |
saw cutting concrete or asphalt
|
9,240   |
LNFT |
2.30 |
21,252.00 |
7.00 |
64,680.00 |
8.00 |
73,920.00 |
5.00 |
46,200.00 |
| S-003 |
u.s. forest service inspector
|
210   |
HOUR |
47.00 |
9,870.00 |
40.00 |
8,400.00 |
48.00 |
10,080.00 |
50.00 |
10,500.00 |
| S-004 |
removal of s. p. no. 023-04-0021 transition road
|
lump |
LUMP |
24,000.00 |
24,000.00 |
17,500.00 |
17,500.00 |
20,000.00 |
20,000.00 |
5,000.00 |
5,000.00 |
| S-101 |
chain link fence (8-foot height)
|
520   |
LNFT |
65.00 |
33,800.00 |
60.00 |
31,200.00 |
58.00 |
30,160.00 |
55.00 |
28,600.00 |
| S-102 |
retroreflective sheeting panels
|
lump |
LUMP |
2,800.00 |
2,800.00 |
1,500.00 |
1,500.00 |
2,000.00 |
2,000.00 |
1,250.00 |
1,250.00 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
27,961,357.89 |
|
28,958,356.98 |
|
28,980,181.30 |
|
29,607,468.35 |
| | NUMBER OF DAYS BID AT $3,650 PER DAY. |
|
|
|
2,463,750.00 |
|
2,518,500.00 |
|
2,518,500.00 |
|
2,518,500.00 |
| | TOTAL BID |
|
|
|
30,425,107.89 |
|
31,476,856.98 |
|
31,498,681.30 |
|
32,125,968.35 |
|
| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 5 - AUSTIN BRIDGE & ROAD, LP |
|
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 201-01 |
clearing & grubbing
|
lump |
LUMP |
1,300,000.00 |
1,300,000.00 |
|
|
|
|
|
|
| 202-01 |
removal of structures & obstructions
|
lump |
LUMP |
40,000.00 |
40,000.00 |
|
|
|
|
|
|
| 202-02-B-01 |
removal of concrete box culverts (sta. 144+67; 2-6' x
6' x 45') |
1   |
EACH |
5,400.00 |
5,400.00 |
|
|
|
|
|
|
| 202-02-B-02 |
removal of concrete box culverts (sta. 263+25; 6' x 6'
x 60') |
1   |
EACH |
3,600.00 |
3,600.00 |
|
|
|
|
|
|
| 202-02-B-03 |
removal of concrete box culverts (sta. 270+81; 2-4.5'
x 4.5' x 54') |
1   |
EACH |
4,900.00 |
4,900.00 |
|
|
|
|
|
|
| 202-02-B-04 |
removal of concrete box culverts (sta. 348+32; 2-6' x
6' x 51') |
1   |
EACH |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| 202-02-C |
removal of portland cement concrete pavement
|
4,582   |
SQYD |
9.00 |
41,238.00 |
|
|
|
|
|
|
| 202-02-D |
removal of concrete walks & drives
|
890   |
SQYD |
20.00 |
17,800.00 |
|
|
|
|
|
|
| 202-02-G |
removal of surfacing & stabilized base
|
16,711.8 |
SQYD |
4.00 |
66,847.20 |
|
|
|
|
|
|
| 202-02-H |
removal of guard rail
|
531   |
LNFT |
7.50 |
3,982.50 |
|
|
|
|
|
|
| 202-02-01 |
removal of 47.5' x 43.2' wood frame residence on piers
(rt. of sta. 119+70) |
1   |
EACH |
6,200.00 |
6,200.00 |
|
|
|
|
|
|
| 202-02-02 |
removal of kisatchie national forest sign (lt. of sta.
211+90) |
1   |
EACH |
100.00 |
100.00 |
|
|
|
|
|
|
| 202-02-03 |
removal of 24.7' x 14.9' wood frame residence (rt. of
sta. 251+36) |
1   |
EACH |
1,100.00 |
1,100.00 |
|
|
|
|
|
|
| 202-02-04 |
removal of shed (lt. of sta. 255+00)
|
1   |
EACH |
700.00 |
700.00 |
|
|
|
|
|
|
| 202-02-05 |
removal of barn (lt. of sta. 255+00)
|
1   |
EACH |
4,100.00 |
4,100.00 |
|
|
|
|
|
|
| 202-02-06 |
removal of 20.4' x 66.6' wood frame residence (lt. of
sta. 256+09) |
1   |
EACH |
4,100.00 |
4,100.00 |
|
|
|
|
|
|
| 202-02-07 |
removal of 60.7' x 25.2' wood frame residence on piers
(lt. of sta. 297+93) |
1   |
EACH |
4,600.00 |
4,600.00 |
|
|
|
|
|
|
| 202-02-08 |
removal of 23.5' x 28.0' wood frame workshop on slab
(lt. of sta. 298+14) |
1   |
EACH |
2,000.00 |
2,000.00 |
|
|
|
|
|
|
| 202-02-09 |
removal of 14.4' x 18.3' shed (lt. of sta. 298+17)
|
1   |
EACH |
800.00 |
800.00 |
|
|
|
|
|
|
| 202-02-10 |
removal of 52.6' x 24.4' wood frame residence on piers
(lt. of sta. 328+32) (contains friable & non-friable asbestos) |
1   |
EACH |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 202-02-11 |
removal of 25.0' x 12.0' tin barn (lt. of sta. 333+25)
|
1   |
EACH |
1,000.00 |
1,000.00 |
|
|
|
|
|
|
| 202-02-12 |
removal of 38.0' x 33.8' metal barn (lt. of sta.
359+12) |
1   |
EACH |
3,800.00 |
3,800.00 |
|
|
|
|
|
|
| 202-02-13 |
removal of 25.9' x 40.7' metal building and carport
(lt. of sta. 361+01) |
1   |
EACH |
3,200.00 |
3,200.00 |
|
|
|
|
|
|
| 202-02-14 |
removal of 26.4' x 42.5' tin shed (lt. of sta. 368+00)
|
1   |
EACH |
3,400.00 |
3,400.00 |
|
|
|
|
|
|
| 202-02-15 |
removal of 26.8' x 22.4' tin shed (lt. of sta. 368+53)
|
1   |
EACH |
2,100.00 |
2,100.00 |
|
|
|
|
|
|
| 202-02-16 |
removal of 11.6' x 60.5' trailer and deck (lt. of sta.
369+11) |
1   |
EACH |
2,500.00 |
2,500.00 |
|
|
|
|
|
|
| 202-02-17 |
removal of 8.3' x 16.3' shed (lt. of sta. 369+36)
|
1   |
EACH |
500.00 |
500.00 |
|
|
|
|
|
|
| 202-02-18 |
removal of 7.2' x 5.9' wood shed (lt. of sta. 370+41)
|
1   |
EACH |
100.00 |
100.00 |
|
|
|
|
|
|
| 202-02-19 |
removal of 29.7' x 66.1' brick residence on concrete
slab (lt. of sta. 371+36.50)(contains non-friable asbestos) |
1   |
EACH |
17,000.00 |
17,000.00 |
|
|
|
|
|
|
| 202-02-20 |
removal of 19.4' x 23.3' wood frame shed (lt. of sta.
372+33) |
1   |
EACH |
1,600.00 |
1,600.00 |
|
|
|
|
|
|
| 202-02-21 |
removal of 7.8' x 16.1' metal building (lt. of sta.
372+83) |
1   |
EACH |
500.00 |
500.00 |
|
|
|
|
|
|
| 202-02-22 |
removal of 11.9' x 20.1' wood shed (rt. of sta.
377+82.50) |
1   |
EACH |
900.00 |
900.00 |
|
|
|
|
|
|
| 202-02-23 |
removal of 33.0' x 42.4' wood frame barn (lt. of sta.
378+00) |
1   |
EACH |
4,900.00 |
4,900.00 |
|
|
|
|
|
|
| 202-02-24 |
removal of 23.9' x 38.6' wood frame residence (lt. of
sta. 379+07) (contains non-friable asbestos) |
1   |
EACH |
14,000.00 |
14,000.00 |
|
|
|
|
|
|
| 202-02-25 |
removal of 10.5' x 15.9' wood shed (lt. of sta. 379+00)
|
1   |
EACH |
600.00 |
600.00 |
|
|
|
|
|
|
| 202-02-26 |
removal of 24.1' x 51.9' wood framae residence on
piers (lt. of sta. 381+62)(contains non-friable asbestos) |
1   |
EACH |
15,000.00 |
15,000.00 |
|
|
|
|
|
|
| 202-02-27 |
removal of 15.0' x 26.4' shed (lt. of sta. 381+66)
|
1   |
EACH |
1,400.00 |
1,400.00 |
|
|
|
|
|
|
| 202-02-28 |
removal of 20.0' x 35.6' wood frame residence (lt. of
sta. 383+04) |
1   |
EACH |
2,100.00 |
2,100.00 |
|
|
|
|
|
|
| 202-02-29 |
removal of 14.3' x 16.9' shed (lt. of sta. 384+88)
|
1   |
EACH |
900.00 |
900.00 |
|
|
|
|
|
|
| 202-02-30 |
removal of 10.0' x 20.0' deck (lt. of sta. 385+07)
|
1   |
EACH |
100.00 |
100.00 |
|
|
|
|
|
|
| 202-02-31 |
removal of 14.7' x 19.0' canopy (lt. of sta. 385+13)
|
1   |
EACH |
100.00 |
100.00 |
|
|
|
|
|
|
| 202-02-32 |
removal of 23.0' x 30.0' metal shed (lt. of sta.
401+39) |
1   |
EACH |
2,100.00 |
2,100.00 |
|
|
|
|
|
|
| 202-02-33 |
removal of 41.7' x 100.2' metal building (lt. of sta.
403+25.50) |
1   |
EACH |
14,500.00 |
14,500.00 |
|
|
|
|
|
|
| 202-02-34 |
removal of 34.5' x 61.1' wood frame residence on slab
(lt. of sta. 421+12) |
1   |
EACH |
7,400.00 |
7,400.00 |
|
|
|
|
|
|
| 202-02-35 |
removal of 20.3' x 20.9' wood shed with tin roof (lt.
of sta. 421+29) |
1   |
EACH |
1,500.00 |
1,500.00 |
|
|
|
|
|
|
| 202-02-36 |
removal of 17.6' x 37.3' wood shed with tin roof (lt.
of sta. 421+63.50) |
1   |
EACH |
2,300.00 |
2,300.00 |
|
|
|
|
|
|
| 202-02-37 |
removal of 30.1' x 41.1' metal building on slab (lt.
of sta. 426+02) |
1   |
EACH |
3,700.00 |
3,700.00 |
|
|
|
|
|
|
| 203-01 |
general excavation
|
546,192   |
CUYD |
3.25 |
1,775,124.00 |
|
|
|
|
|
|
| 203-02 |
drainage excavation
|
1,393   |
CUYD |
8.50 |
11,840.50 |
|
|
|
|
|
|
| 203-03 |
muck excavation
|
3,675   |
CUYD |
8.50 |
31,237.50 |
|
|
|
|
|
|
| 203-04 |
embankment
|
742,075   |
CUYD |
7.00 |
5,194,525.00 |
|
|
|
|
|
|
| 203-05 |
nonplastic embankment
|
143   |
CUYD |
150.00 |
21,450.00 |
|
|
|
|
|
|
| 203-09 |
geotextile fabric
|
922   |
SQYD |
7.00 |
6,454.00 |
|
|
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
238   |
EACH |
6.00 |
1,428.00 |
|
|
|
|
|
|
| 204-03 |
temporary slope drains
|
1,604   |
LNFT |
10.00 |
16,040.00 |
|
|
|
|
|
|
| 204-05-A |
temporary sediment check dams (hay)
|
735   |
EACH |
100.00 |
73,500.00 |
|
|
|
|
|
|
| 204-05-B |
temporary sediment check dams (stone)
|
284   |
EACH |
400.00 |
113,600.00 |
|
|
|
|
|
|
| 204-06 |
temporary silt fencing
|
80,000   |
LNFT |
1.50 |
120,000.00 |
|
|
|
|
|
|
| 302-02-B-01 |
class ii base course (8 1/2" thick)(stone or recycled
pccp) |
6,801.8 |
SQYD |
28.00 |
190,450.40 |
|
|
|
|
|
|
| 302-02-E-01 |
class ii base course (4" thick)(stone or recycled pccp)
|
195,664.8 |
SQYD |
12.00 |
2,347,977.60 |
|
|
|
|
|
|
| 302-02-F-01 |
class ii base course (8" thick)(soil cement)
|
173,875.6 |
SQYD |
11.00 |
1,912,631.60 |
|
|
|
|
|
|
| 304-01 |
lime
|
1,231.94 |
TON |
145.00 |
178,631.30 |
|
|
|
|
|
|
| 304-04-D |
lime treatment (type d) (12" thick)
|
86,909   |
SQYD |
2.00 |
173,818.00 |
|
|
|
|
|
|
| 401-01 |
aggregate surface course (net section)
|
5,102.1 |
CUYD |
120.00 |
612,252.00 |
|
|
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
362   |
CUYD |
120.00 |
43,440.00 |
|
|
|
|
|
|
| 402-01 |
traffic maintenance aggregate (vehicular measurement)
|
2,000.0 |
CUYD |
90.00 |
180,000.00 |
|
|
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
37,949.0 |
TON |
103.65 |
3,933,413.85 |
|
|
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
7,350.5 |
TON |
125.00 |
918,812.50 |
|
|
|
|
|
|
| 701-01-I |
cross drain pipe (24" rcp/pcp)
|
1,332   |
LNFT |
65.00 |
86,580.00 |
|
|
|
|
|
|
| 701-01-M |
cross drain pipe (36" rcp/pcp)
|
76   |
LNFT |
95.00 |
7,220.00 |
|
|
|
|
|
|
| 701-01-N |
cross drain pipe (42" rcp/pcp)
|
228   |
LNFT |
125.00 |
28,500.00 |
|
|
|
|
|
|
| 701-01-O-01 |
cross drain pipe (48" rcp)(class v)
|
460   |
LNFT |
200.00 |
92,000.00 |
|
|
|
|
|
|
| 701-01-S-01 |
cross drain pipe (72" rcp)(class iv)
|
400   |
LNFT |
500.00 |
200,000.00 |
|
|
|
|
|
|
| 701-01-U |
cross drain pipe (84" rcp/pcp)
|
280   |
LNFT |
400.00 |
112,000.00 |
|
|
|
|
|
|
| 701-02-F |
cross drain pipe arch (36" equiv. rcpa)
|
172   |
LNFT |
120.00 |
20,640.00 |
|
|
|
|
|
|
| 701-02-N |
cross drain pipe arch (84" equiv. rcpa)
|
400   |
LNFT |
600.00 |
240,000.00 |
|
|
|
|
|
|
| 701-03-G |
storm drain pipe (18" rcp/pcp)
|
376   |
LNFT |
50.00 |
18,800.00 |
|
|
|
|
|
|
| 701-03-I |
storm drain pipe (24" rcp/pcp)
|
2,372   |
LNFT |
65.00 |
154,180.00 |
|
|
|
|
|
|
| 701-03-K |
storm drain pipe (30" rcp/pcp)
|
88   |
LNFT |
80.00 |
7,040.00 |
|
|
|
|
|
|
| 701-05-G |
side drain pipe (18")
|
1,064   |
LNFT |
50.00 |
53,200.00 |
|
|
|
|
|
|
| 701-05-I |
side drain pipe (24")
|
292   |
LNFT |
65.00 |
18,980.00 |
|
|
|
|
|
|
| 701-05-I-01 |
side drain pipe (24")(erosion or bridge drain)
|
148   |
LNFT |
65.00 |
9,620.00 |
|
|
|
|
|
|
| 701-05-K |
side drain pipe (30")
|
132   |
LNFT |
80.00 |
10,560.00 |
|
|
|
|
|
|
| 701-10-I |
reinforced concrete pipe (extension)(24")
|
22   |
LNFT |
200.00 |
4,400.00 |
|
|
|
|
|
|
| 702-02-B |
manholes (r-cb-11)
|
1   |
EACH |
6,000.00 |
6,000.00 |
|
|
|
|
|
|
| 702-02-G |
manholes (r-cb-38)
|
3   |
EACH |
6,500.00 |
19,500.00 |
|
|
|
|
|
|
| 702-03-A |
catch basins (cb-01)
|
35   |
EACH |
3,000.00 |
105,000.00 |
|
|
|
|
|
|
| 702-03-B |
catch basins (cb-02)
|
1   |
EACH |
4,500.00 |
4,500.00 |
|
|
|
|
|
|
| 702-07-B |
cross drain safety end (type 2)
|
1   |
EACH |
5,000.00 |
5,000.00 |
|
|
|
|
|
|
| 702-08-A |
side drain safety end (type 1)
|
1   |
EACH |
1,250.00 |
1,250.00 |
|
|
|
|
|
|
| 704-03 |
blocked out guard rail
|
1,043.8 |
LNFT |
18.00 |
18,788.40 |
|
|
|
|
|
|
| 704-08-B |
guard rail transitions (double thrie beam)
|
200.0 |
LNFT |
50.00 |
10,000.00 |
|
|
|
|
|
|
| 704-11-A |
guard rail end treatment (flared)
|
6   |
EACH |
1,900.00 |
11,400.00 |
|
|
|
|
|
|
| 704-11-B |
guard rail end treatment (tangent)
|
2   |
EACH |
2,500.00 |
5,000.00 |
|
|
|
|
|
|
| 705-01 |
barbed wire fence
|
4,125   |
LNFT |
6.50 |
26,812.50 |
|
|
|
|
|
|
| 705-02 |
combination mesh & barbed wire fence
|
4,581   |
LNFT |
7.50 |
34,357.50 |
|
|
|
|
|
|
| 705-04 |
single swinging driveway gates
|
3   |
EACH |
500.00 |
1,500.00 |
|
|
|
|
|
|
| 705-06-A |
chain link fence (4-foot height)
|
243   |
LNFT |
25.00 |
6,075.00 |
|
|
|
|
|
|
| 705-06-B |
chain link fence (5-foot height)
|
336   |
LNFT |
30.00 |
10,080.00 |
|
|
|
|
|
|
| 705-07-A |
12-foot single gates for chain link fence (4-foot
height) |
1   |
EACH |
1,600.00 |
1,600.00 |
|
|
|
|
|
|
| 706-02-C |
concrete drive (6" thick)
|
304.0 |
SQYD |
65.00 |
19,760.00 |
|
|
|
|
|
|
| 708-01 |
right-of-way monument
|
109   |
EACH |
350.00 |
38,150.00 |
|
|
|
|
|
|
| 708-02 |
right-of-way monument witness post
|
109   |
EACH |
350.00 |
38,150.00 |
|
|
|
|
|
|
| 711-01-B |
riprap (10 lb, 12" thick)
|
3,738   |
SQYD |
55.00 |
205,590.00 |
|
|
|
|
|
|
| 711-01-D |
riprap (55 lb, 24" thick)
|
658   |
SQYD |
100.00 |
65,800.00 |
|
|
|
|
|
|
| 711-01-E |
riprap (130 lb, 36" thick)
|
206   |
SQYD |
125.00 |
25,750.00 |
|
|
|
|
|
|
| 712-01-A |
concrete cast-in-place revetment (4" thick)
|
19,971   |
SQYD |
65.00 |
1,298,115.00 |
|
|
|
|
|
|
| 712-01-C |
concrete cast-in-place revetment (6" thick)
|
396   |
SQYD |
100.00 |
39,600.00 |
|
|
|
|
|
|
| 712-04 |
flexible revetment
|
492   |
SQYD |
60.00 |
29,520.00 |
|
|
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
250,000.00 |
250,000.00 |
|
|
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
6.307 |
MILE |
338.48 |
2,134.79 |
|
|
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
27.923 |
MILE |
676.96 |
18,902.75 |
|
|
|
|
|
|
| 713-05-A-01 |
temporary pavement markings (solid line)(4" width)
(type i removable) |
0.250 |
MILE |
14,297.32 |
3,574.33 |
|
|
|
|
|
|
| 713-07 |
temporary reflectorized raised pavement markers
|
2,354   |
EACH |
5.00 |
11,770.00 |
|
|
|
|
|
|
| 713-08 |
temporary precast concrete barrier (contractor
furnished) |
26   |
EACH |
1,500.00 |
39,000.00 |
|
|
|
|
|
|
| 716-01-A |
mulch (vegetative)
|
121.20 |
ACRE |
700.00 |
84,840.00 |
|
|
|
|
|
|
| 717-01 |
seeding
|
7,272   |
LB |
6.50 |
47,268.00 |
|
|
|
|
|
|
| 718-01 |
fertilizer
|
121,200   |
LB |
0.29 |
35,148.00 |
|
|
|
|
|
|
| 720-01-A |
erosion control system, slope protection (type a)
|
68,238   |
SQYD |
1.20 |
81,885.60 |
|
|
|
|
|
|
| 720-01-C |
erosion control system, flexible channel liner (type c)
|
13,197   |
SQYD |
1.75 |
23,094.75 |
|
|
|
|
|
|
| 720-01-D |
erosion control system, flexible channel liner (type d)
|
22,914   |
SQYD |
2.00 |
45,828.00 |
|
|
|
|
|
|
| 720-01-E |
erosion control system, flexible channel liner (type e)
|
3,818   |
SQYD |
2.50 |
9,545.00 |
|
|
|
|
|
|
| 720-01-F |
erosion control system, flexible channel liner (type f)
|
1,904   |
SQYD |
2.50 |
4,760.00 |
|
|
|
|
|
|
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
30,000.00 |
30,000.00 |
|
|
|
|
|
|
| 724-01-C |
pavement patching (17" minimium thickness)
|
1,187   |
SQYD |
80.00 |
94,960.00 |
|
|
|
|
|
|
| 725-01 |
temporary detour roads
|
322.5 |
LNFT |
125.00 |
40,312.50 |
|
|
|
|
|
|
| 726-01 |
bedding material
|
2,869.3 |
CUYD |
100.00 |
286,930.00 |
|
|
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
2,295,000.00 |
2,295,000.00 |
|
|
|
|
|
|
| 729-16-C |
object marker assembly (type 3)
|
6   |
EACH |
80.00 |
480.00 |
|
|
|
|
|
|
| 729-19-B |
dead end road installations(type b)
|
1   |
EACH |
750.00 |
750.00 |
|
|
|
|
|
|
| 731-01 |
nonreflectorized raised pavement markers
|
528   |
EACH |
11.28 |
5,955.84 |
|
|
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
2,771   |
EACH |
5.36 |
14,852.56 |
|
|
|
|
|
|
| 732-01-C |
plastic pavement striping (8" width)
|
3,219   |
LNFT |
1.13 |
3,637.47 |
|
|
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
879   |
LNFT |
3.38 |
2,971.02 |
|
|
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
31.921 |
MILE |
2,500.00 |
79,802.50 |
|
|
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
13.812 |
MILE |
800.00 |
11,049.60 |
|
|
|
|
|
|
| 732-04-A |
plastic pavement legends & symbols (arrow)
|
11   |
EACH |
170.00 |
1,870.00 |
|
|
|
|
|
|
| 732-04-C |
plastic pavement legends & symbols (only)
|
11   |
EACH |
170.00 |
1,870.00 |
|
|
|
|
|
|
| 732-05-A |
removal of existing markings (water blasting)
|
7.000 |
MILE |
8,500.00 |
59,500.00 |
|
|
|
|
|
|
| 735-01 |
mailboxes
|
12   |
EACH |
5.00 |
60.00 |
|
|
|
|
|
|
| 735-02 |
mailbox supports (single)
|
10   |
EACH |
170.00 |
1,700.00 |
|
|
|
|
|
|
| 735-03 |
mailbox supports (double)
|
1   |
EACH |
190.00 |
190.00 |
|
|
|
|
|
|
| 739-01-A |
hydro-seeding (u.s forest service)
|
32.60 |
ACRE |
1,200.00 |
39,120.00 |
|
|
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
350,000.00 |
350,000.00 |
|
|
|
|
|
|
| 740-02 |
utility oversight and coordination
|
lump |
LUMP |
35,000.00 |
35,000.00 |
|
|
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
50,000.00 |
50,000.00 |
|
|
|
|
|
|
| 804-01-B |
precast concrete piles (14")
|
400   |
LNFT |
80.00 |
32,000.00 |
|
|
|
|
|
|
| 804-01-C |
precast concrete piles (16")
|
2,148   |
LNFT |
80.00 |
171,840.00 |
|
|
|
|
|
|
| 804-01-F |
precast concrete piles (24")
|
2,140   |
LNFT |
120.00 |
256,800.00 |
|
|
|
|
|
|
| 804-01-G |
precast concrete piles (30")
|
1,320   |
LNFT |
150.00 |
198,000.00 |
|
|
|
|
|
|
| 804-05 |
precast concrete test piles
|
2   |
EACH |
38,000.00 |
76,000.00 |
|
|
|
|
|
|
| 804-09 |
loading test piles
|
2   |
EACH |
28,000.00 |
56,000.00 |
|
|
|
|
|
|
| 804-10 |
reloading test piles
|
2   |
EACH |
6,000.00 |
12,000.00 |
|
|
|
|
|
|
| 804-11 |
redriving test piles
|
2   |
EACH |
6,300.00 |
12,600.00 |
|
|
|
|
|
|
| 804-12 |
loading permanent piles
|
2   |
EACH |
20,000.00 |
40,000.00 |
|
|
|
|
|
|
| 804-17 |
dynamic monitoring
|
6   |
EACH |
3,500.00 |
21,000.00 |
|
|
|
|
|
|
| 805-01-B |
class a concrete (box culvert headwalls)
|
59.11 |
CUYD |
1,500.00 |
88,665.00 |
|
|
|
|
|
|
| 805-01-F |
class a concrete (bents)
|
477.81 |
CUYD |
900.00 |
430,029.00 |
|
|
|
|
|
|
| 805-03 |
class aa concrete
|
1,045.80 |
CUYD |
700.00 |
732,060.00 |
|
|
|
|
|
|
| 805-08-D |
precast-prestressed concrete girders (type iv)
|
4,315.0 |
LNFT |
165.00 |
711,975.00 |
|
|
|
|
|
|
| 805-11 |
strip seal joints
|
248.92 |
LNFT |
180.00 |
44,805.60 |
|
|
|
|
|
|
| 805-12-E |
reinforced concrete box culverts (4'x 4')
|
156.0 |
LNFT |
450.00 |
70,200.00 |
|
|
|
|
|
|
| 805-12-E-01 |
reinforced concrete box culverts (4'x 4')(extension)
|
330.0 |
LNFT |
700.00 |
231,000.00 |
|
|
|
|
|
|
| 805-12-F |
reinforced concrete box culverts (5'x 4')
|
615.0 |
LNFT |
650.00 |
399,750.00 |
|
|
|
|
|
|
| 805-12-M |
reinforced concrete box culverts (6'x 6')
|
406.0 |
LNFT |
750.00 |
304,500.00 |
|
|
|
|
|
|
| 806-01 |
deformed reinforcing steel
|
326,784   |
LB |
1.00 |
326,784.00 |
|
|
|
|
|
|
| 807-06 |
structural metalwork
|
lump |
LUMP |
6,500.00 |
6,500.00 |
|
|
|
|
|
|
| 810-01 |
concrete railing (barrier)
|
1,872.00 |
LNFT |
55.00 |
102,960.00 |
|
|
|
|
|
|
| 813-01 |
concrete approach slab
|
1,303.75 |
SQYD |
185.00 |
241,193.75 |
|
|
|
|
|
|
| S-001 |
rumble strips (ground-in)
|
15.9 |
MILE |
1,900.00 |
30,210.00 |
|
|
|
|
|
|
| S-002 |
saw cutting concrete or asphalt
|
9,240   |
LNFT |
3.50 |
32,340.00 |
|
|
|
|
|
|
| S-003 |
u.s. forest service inspector
|
210   |
HOUR |
47.60 |
9,996.00 |
|
|
|
|
|
|
| S-004 |
removal of s. p. no. 023-04-0021 transition road
|
lump |
LUMP |
25,000.00 |
25,000.00 |
|
|
|
|
|
|
| S-101 |
chain link fence (8-foot height)
|
520   |
LNFT |
35.00 |
18,200.00 |
|
|
|
|
|
|
| S-102 |
retroreflective sheeting panels
|
lump |
LUMP |
1,500.00 |
1,500.00 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | ITEM TOTAL (CONSTRUCTION BID) |
|
|
|
31,330,983.41 |
|
|
|
|
|
|
| | NUMBER OF DAYS BID AT $3,650 PER DAY. |
|
|
|
2,518,500.00 |
|
|
|
|
|
|
| | TOTAL BID |
|
|
|
33,849,483.41 |
|
|
|
|
|
|
|