Letting of 3/28/2007 LA DOTD Headquarters


 
go back
Go Back
DBE GOAL FED
Lead Project: 006-03-0054
Parish: ORLEANS
Routes: US 90
Description: US 90 (TULANE AVE. TO ORLEANS AVE.)
Type Const: cold planing asphaltic concrete pavement, superpave asphaltic concrete overlay and
related work
Estimated Construction Cost: $840,260.30
 
RankLicenseBidderConstruction Bid
1 06276 BARRIERE CONSTRUCTION CO., LLC $989,117.00
2 02179 BOH BROS. CONSTRUCTION CO., LLC. $1,036,293.50
 
Item Number Item Description Quantity Unit of Measure - 1 -
BARRIERE CONSTRUCTION CO., LLC
- 2 -
BOH BROS. CONSTRUCTION CO., LLC.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-F removal of concrete combination curb & gutter 455.0    LNFT 25.00 11,375.00 20.00 9,100.00        
203-08 borrow (vehicular measurement) 100      CUYD 75.00 7,500.00 50.00 5,000.00        
502-01 superpave asphaltic concrete 4,360.0    TON 75.00 327,000.00 100.00 436,000.00        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
535.0    TON 110.00 58,850.00 100.00 53,500.00        
509-01 cold planing asphaltic pavement 37,269      SQYD 4.00 149,076.00 3.50 130,441.50        
509-02 contractor retained reclaimed asphaltic pavement - 2,070      CUYD 1.00 - 2,070.00 10.00 - 20,700.00        
706-01-A concrete walk (4" thick) 250.0    SQYD 110.00 27,500.00 200.00 50,000.00        
707-03 combination concrete curb & gutter 455.0    LNFT 50.00 22,750.00 60.00 27,300.00        
713-01 temporary signs & barricades lump      LUMP 100,000.00 100,000.00 60,000.00 60,000.00        
713-03-C temporary pavement markings (8" width) 9,760      LNFT 0.10 976.00 0.50 4,880.00        
713-03-E temporary pavement markings (24" width) 44      LNFT 1.00 44.00 3.00 132.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
6.000  MILE 150.00 900.00 100.00 600.00        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
6.000  MILE 100.00 600.00 100.00 600.00        
713-05-A temporary pavement markings (solid line)(4" width) 3.000  MILE 200.00 600.00 200.00 600.00        
713-06-A temporary pavement legends and symbols (arrow) 4      EACH 10.00 40.00 50.00 200.00        
713-06-E temporary pavement legends and symbols (school
crossing)
2      EACH 100.00 200.00 100.00 200.00        
724-01-B pavement patching (12" minimum thickness) 1,450      SQYD 90.00 130,500.00 100.00 145,000.00        
727-01 mobilization lump      LUMP 95,000.00 95,000.00 100,000.00 100,000.00        
731-02 reflectorized raised pavement markers 418      EACH 6.00 2,508.00 5.00 2,090.00        
732-01-C plastic pavement striping (8" width) 4,880      LNFT 1.00 4,880.00 1.00 4,880.00        
732-01-E plastic pavement striping (24" width) 22      LNFT 4.00 88.00 10.00 220.00        
732-02-A plastic pavement striping (solid line) (4" width) 1.500  MILE 3,000.00 4,500.00 300.00 450.00        
732-03-A plastic pavement striping (broken line)(4" width) 3.000  MILE 1,000.00 3,000.00 1,000.00 3,000.00        
732-04-A plastic pavement legends & symbols (arrow) 4      EACH 200.00 800.00 200.00 800.00        
732-04-E plastic pavement legends & symbols (school crossing) 2      EACH 500.00 1,000.00 500.00 1,000.00        
740-01 construction layout lump      LUMP 20,000.00 20,000.00 8,000.00 8,000.00        
741-11 adjusting water valve and meter box 5      EACH 200.00 1,000.00 600.00 3,000.00        
744-01 traffic control management lump      LUMP 20,000.00 20,000.00 5,000.00 5,000.00        
S-001 sawcuts in asphaltic concrete lifts 1,000      LNFT 0.50 500.00 5.00 5,000.00        
                       
 CONTRACTOR TOTAL       989,117.00   1,036,293.50        