| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - BARRIERE CONSTRUCTION CO., LLC. |
- 2 - COVINGTON PAVING CO. |
|
|
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 203-08 |
borrow (vehicular measurement)
|
195   |
CUYD |
14.00 |
2,730.00 |
15.00 |
2,925.00 |
|
|
|
|
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
450   |
CUYD |
14.00 |
6,300.00 |
15.00 |
6,750.00 |
|
|
|
|
| 204-02 |
temporary hay or straw bales
|
40   |
EACH |
11.00 |
440.00 |
10.00 |
400.00 |
|
|
|
|
| 204-06 |
temporary silt fencing
|
2,500   |
LNFT |
1.60 |
4,000.00 |
0.65 |
1,625.00 |
|
|
|
|
| 303-02 |
removal of existing patches
|
600   |
SQYD |
1.00 |
600.00 |
FREE |
FREE |
|
|
|
|
| 308-01-A |
in-place cement treated base course (12" thick)
|
16,867   |
SQYD |
6.40 |
107,948.80 |
6.50 |
109,635.50 |
|
|
|
|
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
323   |
CUYD |
1.00 |
323.00 |
30.00 |
9,690.00 |
|
|
|
|
| 502-01 |
superpave asphaltic concrete
|
4,378.3 |
TON |
67.00 |
293,346.10 |
72.18 |
316,025.69 |
|
|
|
|
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
350.0 |
TON |
1.00 |
350.00 |
100.00 |
35,000.00 |
|
|
|
|
| 509-01 |
cold planing asphaltic pavement
|
13,573   |
SQYD |
2.50 |
33,932.50 |
1.95 |
26,467.35 |
|
|
|
|
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 566   |
CUYD |
1.00 |
- 566.00 |
2.00 |
- 1,132.00 |
|
|
|
|
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
13,000.00 |
13,000.00 |
20,000.00 |
20,000.00 |
|
|
|
|
| 713-03-E |
temporary pavement markings (24" width)
|
44   |
LNFT |
1.00 |
44.00 |
1.10 |
48.40 |
|
|
|
|
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.300 |
MILE |
170.00 |
561.00 |
500.00 |
1,650.00 |
|
|
|
|
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
2.040 |
MILE |
10.00 |
20.40 |
375.00 |
765.00 |
|
|
|
|
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
10.340 |
MILE |
20.00 |
206.80 |
700.00 |
7,238.00 |
|
|
|
|
| 717-01 |
seeding
|
60   |
LB |
25.00 |
1,500.00 |
10.00 |
600.00 |
|
|
|
|
| 718-01 |
fertilizer
|
2,000   |
LB |
1.50 |
3,000.00 |
0.50 |
1,000.00 |
|
|
|
|
| 724-01-B |
pavement patching (12" minimum thickness)
|
50   |
SQYD |
150.00 |
7,500.00 |
90.00 |
4,500.00 |
|
|
|
|
| 727-01 |
mobilization
|
lump |
LUMP |
60,000.00 |
60,000.00 |
31,000.00 |
31,000.00 |
|
|
|
|
| 731-02 |
reflectorized raised pavement markers
|
218   |
EACH |
5.30 |
1,155.40 |
6.00 |
1,308.00 |
|
|
|
|
| 732-01-E |
plastic pavement striping (24" width)
|
22   |
LNFT |
8.00 |
176.00 |
4.50 |
99.00 |
|
|
|
|
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
5.170 |
MILE |
2,500.00 |
12,925.00 |
2,500.00 |
12,925.00 |
|
|
|
|
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
1.020 |
MILE |
1,000.00 |
1,020.00 |
1,000.00 |
1,020.00 |
|
|
|
|
| 735-01 |
mailboxes
|
7   |
EACH |
2.00 |
14.00 |
10.00 |
70.00 |
|
|
|
|
| 735-02 |
mailbox supports (single)
|
7   |
EACH |
200.00 |
1,400.00 |
175.00 |
1,225.00 |
|
|
|
|
| 740-01 |
construction layout
|
lump |
LUMP |
6,000.00 |
6,000.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| 744-01 |
traffic control management
|
lump |
LUMP |
15,000.00 |
15,000.00 |
3,500.00 |
3,500.00 |
|
|
|
|
| S-001 |
surface preparation
|
lump |
LUMP |
9,000.00 |
9,000.00 |
14,000.00 |
14,000.00 |
|
|
|
|
| S-002 |
saw cutting of concrete/asphalt driveways and turnouts
(full depth) |
120   |
LNFT |
6.00 |
720.00 |
10.00 |
1,200.00 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
582,647.00 |
|
613,034.94 |
|
|
|
|
|