Letting of 2/28/2007 LA DOTD Headquarters


 
go back
Go Back
 
Lead Project: 856-02-0015
Parish: UNION
Routes: LA 552
Description: JCT. ROCKY BRANCH ROAD - SOUTH JCT. LA 15
Type Const: grading, lime trmt, in-place cement stabilized base course, superpave asphaltic
concrete pavement and related work.
Estimated Construction Cost: $2,288,887.20
 
RankLicenseBidderConstruction Bid
1 05789 D & J CONSTRUCTION CO., INC. $2,485,673.52
2 12487 DIAMOND B CONSTRUCTION CO., L.L.C. $2,499,508.12
 
Item Number Item Description Quantity Unit of Measure - 1 -
D & J CONSTRUCTION CO., INC.
- 2 -
DIAMOND B CONSTRUCTION CO., L.L.C.

 

 
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-01 removal of structures & obstructions lump      LUMP 20,000.00 20,000.00 25,000.00 25,000.00        
202-02-D removal of concrete walks & drives 367      SQYD 12.00 4,404.00 15.00 5,505.00        
202-02-H removal of guard rail 351      LNFT 10.00 3,510.00 6.00 2,106.00        
203-08 borrow (vehicular measurement) 1,589      CUYD 14.00 22,246.00 14.00 22,246.00        
203-08-A borrow (vehicular meas.)(selected soils) 3,715      CUYD 8.50 31,577.50 14.00 52,010.00        
304-01 lime 75.96   TON 142.00 10,786.32 175.00 13,293.00        
304-04-D lime treatment (type d) (12" thick) 8,038      SQYD 2.50 20,095.00 2.50 20,095.00        
308-01-A in-place cement treated base course (12" thick) 81,542.8    SQYD 8.10 660,496.68 9.00 733,885.20        
401-02 aggregate surface course (adjusted vehicular
measurement)
135      CUYD 100.00 13,500.00 95.00 12,825.00        
402-01 traffic maintenance aggregate (vehicular measurement) 929.1    CUYD 15.00 13,936.50 60.00 55,746.00        
502-01 superpave asphaltic concrete 12,829.4    TON 86.00 1,103,328.40 86.00 1,103,328.40        
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
748.7    TON 108.00 80,859.60 135.00 101,074.50        
704-03 blocked out guard rail 137.6    LNFT 20.00 2,752.00 25.00 3,440.00        
704-07-A guard rail bridge attachments (single thrie beam) 50.0    LNFT 45.00 2,250.00 48.00 2,400.00        
704-08-B guard rail transitions (double thrie beam) 100.0    LNFT 45.00 4,500.00 57.00 5,700.00        
704-11-A guard rail end treatment (flared) 4      EACH 2,200.00 8,800.00 2,400.00 9,600.00        
706-02-C concrete drive (6" thick) 300.7    SQYD 65.00 19,545.50 70.00 21,049.00        
713-01 temporary signs & barricades lump      LUMP 90,000.00 90,000.00 15,000.00 15,000.00        
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
12.988  MILE 250.00 3,247.00 168.00 2,181.98        
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
1.626  MILE 1.00 1.63 380.00 617.88        
713-05-A temporary pavement markings (solid line)(4" width) 24.736  MILE 1.00 24.74 760.00 18,799.36        
716-01-A mulch (vegetative) 12.51   ACRE 850.00 10,633.50 850.00 10,633.50        
717-01 seeding 563      LB 10.00 5,630.00 11.00 6,193.00        
718-01 fertilizer 12,510      LB 0.40 5,004.00 0.50 6,255.00        
727-01 mobilization lump      LUMP 188,000.00 188,000.00 165,000.00 165,000.00        
729-16-C object marker assembly (type 3) 8      EACH 85.00 680.00 90.00 720.00        
731-02 reflectorized raised pavement markers 859      EACH 6.50 5,583.50 6.00 5,154.00        
732-02-A plastic pavement striping (solid line) (4" width) 12.368  MILE 3,200.00 39,577.60 2,700.00 33,393.60        
732-03-A plastic pavement striping (broken line)(4" width) 0.813  MILE 850.00 691.05 900.00 731.70        
735-01 mailboxes 63      EACH 1.00 63.00 25.00 1,575.00        
735-02 mailbox supports (single) 43      EACH 150.00 6,450.00 150.00 6,450.00        
735-03 mailbox supports (double) 10      EACH 250.00 2,500.00 250.00 2,500.00        
740-01 construction layout lump      LUMP 50,000.00 50,000.00 20,000.00 20,000.00        
744-01 traffic control management lump      LUMP 55,000.00 55,000.00 15,000.00 15,000.00        
                       
 CONTRACTOR TOTAL       2,485,673.52   2,499,508.12        