Lead Project: 849-10-0013
Parish: ST LANDRY
Routes: LA 741
Description: JUNCTION LA 103 - JUNCTION U.S. 190
Type Const: grading, in-place cement stabilized base course, cold planing asphaltic concrete
pavement, superpave asphaltic concrete overlay, and related work.
Estimated Construction Cost: $669,931.60
 
RankLicenseBidderConstruction Bid
1 34356 PRAIRIE CONTRACTORS INC. $691,643.63
2 04089 H & S CONSTRUCTION CO., INC. $696,350.96
3 12312 GILCHRIST CONSTRUCTION CO. LLC $721,626.55
4 08815 W. E. MCDONALD & SON, LLC. $735,048.11
 
Item Number Item Description Quantity Unit of Measure - 1 -
PRAIRIE CONTRACTORS INC.
- 2 -
H & S CONSTRUCTION CO., INC.
- 3 -
GILCHRIST CONSTRUCTION CO. LLC
- 4 -
W. E. MCDONALD & SON, LLC.
Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount Unit PriceTotal Amount
202-02-D removal of concrete walks & drives 60      SQYD 30.00 1,800.00 12.00 720.00 15.00 900.00 30.00 1,800.00
203-08 borrow (vehicular measurement) 200      CUYD 15.00 3,000.00 19.00 3,800.00 10.00 2,000.00 15.00 3,000.00
203-08-A borrow (vehicular meas.)(selected soils) 200      CUYD 15.00 3,000.00 19.00 3,800.00 10.00 2,000.00 15.00 3,000.00
204-05-A temporary sediment check dams (hay) 4      EACH 700.00 2,800.00 110.00 440.00 200.00 800.00 1.00 4.00
303-01-B in-place cement stabilized base course (8 1/2" thick) 15,382      SQYD 7.50 115,365.00 6.50 99,983.00 7.50 115,365.00 7.00 107,674.00
303-02 removal of existing patches 366      SQYD 1.00 366.00 15.00 5,490.00 20.00 7,320.00 20.00 7,320.00
401-02 aggregate surface course (adjusted vehicular
measurement)
330      CUYD 66.00 21,780.00 35.00 11,550.00 65.00 21,450.00 42.00 13,860.00
502-01 superpave asphaltic concrete 2,832.4    TON 92.00 260,580.80 90.00 254,916.00 95.00 269,078.00 95.00 269,078.00
502-01-A superpave asphaltic concrete, drives, turnouts and
miscellaneous
463.4    TON 170.00 78,778.00 120.00 55,608.00 150.00 69,510.00 170.00 78,778.00
509-01 cold planing asphaltic pavement 14,718      SQYD 2.70 39,738.60 2.25 33,115.50 2.50 36,795.00 1.75 25,756.50
509-02 contractor retained reclaimed asphaltic pavement - 689      CUYD 0.01 - 6.89 0.01 - 6.89 0.01 - 6.89 0.01 - 6.89
706-02-C concrete drive (6" thick) 65.0    SQYD 75.00 4,875.00 90.00 5,850.00 75.00 4,875.00 200.00 13,000.00
713-01 temporary signs & barricades lump      LUMP 5,000.00 5,000.00 45,000.00 45,000.00 4,500.00 4,500.00 15,000.00 15,000.00
713-04-A temporary pavement markings (broken line)(4" width)(4'
length)
3.387  MILE 1.00 3.39 521.65 1,766.83 420.00 1,422.54 250.00 846.75
713-04-B temporary pavement markings (broken line)(4" width)
(10' length)
1.526  MILE 1.00 1.53 600.93 917.02 500.00 763.00 300.00 457.80
713-05-A temporary pavement markings (solid line)(4" width) 4.401  MILE 1.00 4.40 793.64 3,492.81 650.00 2,860.65 600.00 2,640.60
713-06-D temporary pavement legends and symbols (rr crossing) 2      EACH 1.00 2.00 127.01 254.02 120.00 240.00 200.00 400.00
722-02 project site laboratory (equipped) 1      EACH 5,000.00 5,000.00 4,500.00 4,500.00 5,000.00 5,000.00 5,000.00 5,000.00
727-01 mobilization lump      LUMP 74,000.00 74,000.00 62,000.00 62,000.00 60,000.00 60,000.00 95,000.00 95,000.00
729-16-B object marker assembly (type 2) 4      EACH 100.00 400.00 95.26 381.04 90.00 360.00 75.00 300.00
731-02 reflectorized raised pavement markers 155      EACH 6.00 930.00 6.48 1,004.40 5.25 813.75 4.50 697.50
732-02-A plastic pavement striping (solid line) (4" width) 3.747  MILE 2,400.00 8,992.80 2,732.93 10,240.29 2,200.00 8,243.40 2,150.00 8,056.05
732-03-A plastic pavement striping (broken line)(4" width) 0.509  MILE 1,000.00 509.00 1,113.54 566.79 900.00 458.10 700.00 356.30
732-04-D plastic pavement legends & symbols (rr crossing) 1      EACH 1,000.00 1,000.00 539.80 539.80 500.00 500.00 400.00 400.00
735-01 mailboxes 3      EACH 1.00 3.00 12.70 38.10 50.00 150.00 1.00 3.00
735-02 mailbox supports (single) 13      EACH 150.00 1,950.00 150.00 1,950.00 100.00 1,300.00 150.00 1,950.00
735-03 mailbox supports (double) 3      EACH 400.00 1,200.00 400.00 1,200.00 150.00 450.00 200.00 600.00
740-01 construction layout lump      LUMP 3,000.00 3,000.00 8,500.00 8,500.00 7,500.00 7,500.00 12,500.00 12,500.00
744-01 traffic control management lump      LUMP 100.00 100.00 28,500.00 28,500.00 30,000.00 30,000.00 8,500.00 8,500.00
S-001 full depth sawcutting of existing portland cement
concrete drives
1,817      INFT 2.00 3,634.00 2.25 4,088.25 3.00 5,451.00 5.00 9,085.00
S-002 cement treatment (12" thick) 7,691      SQYD 7.00 53,837.00 6.00 46,146.00 8.00 61,528.00 6.50 49,991.50
                       
 CONTRACTOR TOTAL       691,643.63   696,350.96   721,626.55   735,048.11