| Item Number |
Item Description |
Quantity |
Unit of Measure |
- 1 - PRAIRIE CONTRACTORS INC. |
- 2 - H & S CONSTRUCTION CO., INC. |
- 3 - GILCHRIST CONSTRUCTION CO. LLC |
- 4 - W. E. MCDONALD & SON, LLC. |
| Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
Unit Price | Total Amount |
| 202-02-D |
removal of concrete walks & drives
|
60   |
SQYD |
30.00 |
1,800.00 |
12.00 |
720.00 |
15.00 |
900.00 |
30.00 |
1,800.00 |
| 203-08 |
borrow (vehicular measurement)
|
200   |
CUYD |
15.00 |
3,000.00 |
19.00 |
3,800.00 |
10.00 |
2,000.00 |
15.00 |
3,000.00 |
| 203-08-A |
borrow (vehicular meas.)(selected soils)
|
200   |
CUYD |
15.00 |
3,000.00 |
19.00 |
3,800.00 |
10.00 |
2,000.00 |
15.00 |
3,000.00 |
| 204-05-A |
temporary sediment check dams (hay)
|
4   |
EACH |
700.00 |
2,800.00 |
110.00 |
440.00 |
200.00 |
800.00 |
1.00 |
4.00 |
| 303-01-B |
in-place cement stabilized base course (8 1/2" thick)
|
15,382   |
SQYD |
7.50 |
115,365.00 |
6.50 |
99,983.00 |
7.50 |
115,365.00 |
7.00 |
107,674.00 |
| 303-02 |
removal of existing patches
|
366   |
SQYD |
1.00 |
366.00 |
15.00 |
5,490.00 |
20.00 |
7,320.00 |
20.00 |
7,320.00 |
| 401-02 |
aggregate surface course (adjusted vehicular
measurement) |
330   |
CUYD |
66.00 |
21,780.00 |
35.00 |
11,550.00 |
65.00 |
21,450.00 |
42.00 |
13,860.00 |
| 502-01 |
superpave asphaltic concrete
|
2,832.4 |
TON |
92.00 |
260,580.80 |
90.00 |
254,916.00 |
95.00 |
269,078.00 |
95.00 |
269,078.00 |
| 502-01-A |
superpave asphaltic concrete, drives, turnouts and
miscellaneous |
463.4 |
TON |
170.00 |
78,778.00 |
120.00 |
55,608.00 |
150.00 |
69,510.00 |
170.00 |
78,778.00 |
| 509-01 |
cold planing asphaltic pavement
|
14,718   |
SQYD |
2.70 |
39,738.60 |
2.25 |
33,115.50 |
2.50 |
36,795.00 |
1.75 |
25,756.50 |
| 509-02 |
contractor retained reclaimed asphaltic pavement
|
- 689   |
CUYD |
0.01 |
- 6.89 |
0.01 |
- 6.89 |
0.01 |
- 6.89 |
0.01 |
- 6.89 |
| 706-02-C |
concrete drive (6" thick)
|
65.0 |
SQYD |
75.00 |
4,875.00 |
90.00 |
5,850.00 |
75.00 |
4,875.00 |
200.00 |
13,000.00 |
| 713-01 |
temporary signs & barricades
|
lump |
LUMP |
5,000.00 |
5,000.00 |
45,000.00 |
45,000.00 |
4,500.00 |
4,500.00 |
15,000.00 |
15,000.00 |
| 713-04-A |
temporary pavement markings (broken line)(4" width)(4'
length) |
3.387 |
MILE |
1.00 |
3.39 |
521.65 |
1,766.83 |
420.00 |
1,422.54 |
250.00 |
846.75 |
| 713-04-B |
temporary pavement markings (broken line)(4" width)
(10' length) |
1.526 |
MILE |
1.00 |
1.53 |
600.93 |
917.02 |
500.00 |
763.00 |
300.00 |
457.80 |
| 713-05-A |
temporary pavement markings (solid line)(4" width)
|
4.401 |
MILE |
1.00 |
4.40 |
793.64 |
3,492.81 |
650.00 |
2,860.65 |
600.00 |
2,640.60 |
| 713-06-D |
temporary pavement legends and symbols (rr crossing)
|
2   |
EACH |
1.00 |
2.00 |
127.01 |
254.02 |
120.00 |
240.00 |
200.00 |
400.00 |
| 722-02 |
project site laboratory (equipped)
|
1   |
EACH |
5,000.00 |
5,000.00 |
4,500.00 |
4,500.00 |
5,000.00 |
5,000.00 |
5,000.00 |
5,000.00 |
| 727-01 |
mobilization
|
lump |
LUMP |
74,000.00 |
74,000.00 |
62,000.00 |
62,000.00 |
60,000.00 |
60,000.00 |
95,000.00 |
95,000.00 |
| 729-16-B |
object marker assembly (type 2)
|
4   |
EACH |
100.00 |
400.00 |
95.26 |
381.04 |
90.00 |
360.00 |
75.00 |
300.00 |
| 731-02 |
reflectorized raised pavement markers
|
155   |
EACH |
6.00 |
930.00 |
6.48 |
1,004.40 |
5.25 |
813.75 |
4.50 |
697.50 |
| 732-02-A |
plastic pavement striping (solid line) (4" width)
|
3.747 |
MILE |
2,400.00 |
8,992.80 |
2,732.93 |
10,240.29 |
2,200.00 |
8,243.40 |
2,150.00 |
8,056.05 |
| 732-03-A |
plastic pavement striping (broken line)(4" width)
|
0.509 |
MILE |
1,000.00 |
509.00 |
1,113.54 |
566.79 |
900.00 |
458.10 |
700.00 |
356.30 |
| 732-04-D |
plastic pavement legends & symbols (rr crossing)
|
1   |
EACH |
1,000.00 |
1,000.00 |
539.80 |
539.80 |
500.00 |
500.00 |
400.00 |
400.00 |
| 735-01 |
mailboxes
|
3   |
EACH |
1.00 |
3.00 |
12.70 |
38.10 |
50.00 |
150.00 |
1.00 |
3.00 |
| 735-02 |
mailbox supports (single)
|
13   |
EACH |
150.00 |
1,950.00 |
150.00 |
1,950.00 |
100.00 |
1,300.00 |
150.00 |
1,950.00 |
| 735-03 |
mailbox supports (double)
|
3   |
EACH |
400.00 |
1,200.00 |
400.00 |
1,200.00 |
150.00 |
450.00 |
200.00 |
600.00 |
| 740-01 |
construction layout
|
lump |
LUMP |
3,000.00 |
3,000.00 |
8,500.00 |
8,500.00 |
7,500.00 |
7,500.00 |
12,500.00 |
12,500.00 |
| 744-01 |
traffic control management
|
lump |
LUMP |
100.00 |
100.00 |
28,500.00 |
28,500.00 |
30,000.00 |
30,000.00 |
8,500.00 |
8,500.00 |
| S-001 |
full depth sawcutting of existing portland cement
concrete drives |
1,817   |
INFT |
2.00 |
3,634.00 |
2.25 |
4,088.25 |
3.00 |
5,451.00 |
5.00 |
9,085.00 |
| S-002 |
cement treatment (12" thick)
|
7,691   |
SQYD |
7.00 |
53,837.00 |
6.00 |
46,146.00 |
8.00 |
61,528.00 |
6.50 |
49,991.50 |
| |
|
|
|
|
|
|
|
|
|
|
|
| | CONTRACTOR TOTAL |
|
|
|
691,643.63 |
|
696,350.96 |
|
721,626.55 |
|
735,048.11 |
|